Inspection sequence, scheduling, and re-inspection fees for building permits in Middleton, Idaho.

Verified 2026-07-04 · Source

How to schedule

Inspections are requested through the building department below.

Address
1103 W Main St, Middleton, ID 83644
Phone
(208) 585-3133
Office hours
Mon–Fri 8:00 AM – 5:00 PM

Published scheduling rules

  • Request inspections through the CitizenServe online portal before 4:00 PM for next-business-day scheduling (per Middleton's electrical/plumbing/mechanical permit forms; confirm whether the same cutoff applies to building inspections by calling the inspection line at (208) 585-5805). (New Residential Building Permit)
  • Inspections must be requested through the CitizenServe portal before 4:00 PM for next-day scheduling (Electrical Permit)
  • Inspections must be requested through the CitizenServe portal before 4:00 PM for next-day scheduling (Solar PV Permit)
  • Inspections must be requested through the CitizenServe portal before 4:00 PM for next-day scheduling (EV Charger / EVSE Permit)

Inspection sequence

Applies to: New Residential Building Permit

  1. 1

    Footing / Foundation

    Before concrete pour — forms, rebar, anchor bolts

  2. 2

    Framing

    After framing and rough-in trades complete, before insulation or wall cover

  3. 3

    Insulation / Energy

    Insulation installed per Idaho Energy Conservation Code before drywall

  4. 4

    Final

    All work complete per approved plans

Applies to: Mechanical / HVAC Permit

  1. 1

    Gas Piping Pressure Test

    Required before concealing gas piping

  2. 2

    Rough-In / Equipment

    HVAC equipment, ductwork, and gas lines before walls closed

  3. 3

    Final

    Equipment operational, venting and combustion air verified

Applies to: Solar PV Permit

  1. 1

    Framing/Structural

    Racking and roof-penetration/structural attachment inspection

  2. 2

    Rough Electrical

    Wiring installed, before walls closed, per the 2023 NEC

  3. 3

    Final

    All devices installed and operational; system energized and verified

Applies to: Accessory Structure Permit

  1. 1

    Foundation / Footings

    Before concrete pour, if applicable

  2. 2

    Final

    Structure complete per approved plans

Applies to: Electrical Permit

  1. 1

    Rough-In

    After wiring installed, before walls closed

  2. 2

    Final

    All devices installed and operational per 2023 NEC

Applies to: EV Charger / EVSE Permit

  1. 1

    Rough-In

    After wiring installed, before walls closed

  2. 2

    Final

    Charger circuit installed and operational per 2023 NEC

Applies to: Plumbing Permit

  1. 1

    Underground / Rough-In

    Before concrete pour or wall closure — verify pipe slope, materials, cleanouts

  2. 2

    Final

    All fixtures connected, no leaks, proper venting verified

Re-inspection fees

New Residential Building PermitReinspection — Building, second notice of correction for same item · City Fee Schedule Res. 508-24
$75.00
Electrical PermitRequest inspection / re-inspection / technical service
$65.00 minimum plus $65.00 per hour or portion thereof in excess of one hour, including travel to and from job location
Plumbing PermitRequest inspection / re-inspection / technical service
$65.00 minimum plus $65.00 per hour or portion thereof in excess of one hour, including travel
Mechanical / HVAC PermitRequest inspection / re-inspection / technical service
$65.00 minimum plus $65.00 per hour or portion thereof in excess of one hour, including travel
EV Charger / EVSE PermitRequest inspection / re-inspection / technical service
$65.00 minimum plus $65.00 per hour or portion thereof in excess of one hour, including travel to and from job location

Sources & verification

Verified against official sources. Last reviewed 2026-07-04.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Middleton building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Middleton building permits

Get alerts for Middleton

We'll email you when Middleton's fees, documents, or codes change — not often.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.