Middleton building inspections
VerifiedInspection sequence, scheduling, and re-inspection fees for building permits in Middleton, Idaho.
Verified 2026-07-04 · Source
How to schedule
Inspections are requested through the building department below.
- Address
- 1103 W Main St, Middleton, ID 83644
- Phone
- (208) 585-3133
- Office hours
- Mon–Fri 8:00 AM – 5:00 PM
- Website
- Official site
Published scheduling rules
- Request inspections through the CitizenServe online portal before 4:00 PM for next-business-day scheduling (per Middleton's electrical/plumbing/mechanical permit forms; confirm whether the same cutoff applies to building inspections by calling the inspection line at (208) 585-5805). (New Residential Building Permit)
- Inspections must be requested through the CitizenServe portal before 4:00 PM for next-day scheduling (Electrical Permit)
- Inspections must be requested through the CitizenServe portal before 4:00 PM for next-day scheduling (Solar PV Permit)
- Inspections must be requested through the CitizenServe portal before 4:00 PM for next-day scheduling (EV Charger / EVSE Permit)
Inspection sequence
Applies to: New Residential Building Permit
- 1
Footing / Foundation
Before concrete pour — forms, rebar, anchor bolts
- 2
Framing
After framing and rough-in trades complete, before insulation or wall cover
- 3
Insulation / Energy
Insulation installed per Idaho Energy Conservation Code before drywall
- 4
Final
All work complete per approved plans
Applies to: Mechanical / HVAC Permit
- 1
Gas Piping Pressure Test
Required before concealing gas piping
- 2
Rough-In / Equipment
HVAC equipment, ductwork, and gas lines before walls closed
- 3
Final
Equipment operational, venting and combustion air verified
Applies to: Solar PV Permit
- 1
Framing/Structural
Racking and roof-penetration/structural attachment inspection
- 2
Rough Electrical
Wiring installed, before walls closed, per the 2023 NEC
- 3
Final
All devices installed and operational; system energized and verified
Applies to: Accessory Structure Permit
- 1
Foundation / Footings
Before concrete pour, if applicable
- 2
Final
Structure complete per approved plans
Applies to: Electrical Permit
- 1
Rough-In
After wiring installed, before walls closed
- 2
Final
All devices installed and operational per 2023 NEC
Applies to: EV Charger / EVSE Permit
- 1
Rough-In
After wiring installed, before walls closed
- 2
Final
Charger circuit installed and operational per 2023 NEC
Applies to: Plumbing Permit
- 1
Underground / Rough-In
Before concrete pour or wall closure — verify pipe slope, materials, cleanouts
- 2
Final
All fixtures connected, no leaks, proper venting verified
Re-inspection fees
Sources & verification
Verified against official sources. Last reviewed 2026-07-04.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Middleton building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Middleton building permits
Get alerts for Middleton
We'll email you when Middleton's fees, documents, or codes change — not often.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.