Electrical Permit in Middleton, Idaho

Required for all electrical installations in Middleton, including new residential wiring, service changes, and remodel/repair circuits. Middleton self-administers electrical permitting and inspection through its own City Building Department (does not route to Idaho DOPL).

Verified 2026-07-04 · Source

When you need this permit

  • Permit required before starting electrical work; failure to obtain a permit prior to starting work results in double/triple fees
  • All permits applied for and issued through the CitizenServe portal; allow 24 hours for permit processing
  • Work must comply with the 2023 National Electrical Code (NEC) with Idaho amendments
  • Inspections must be requested through the CitizenServe portal before 4:00 PM for next-day scheduling

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

New Residential — single family dwelling, up to 1,500 sq ft
$130.00
New Residential — single family dwelling, 1,501 to 2,500 sq ft
$195.00
New Residential — single family dwelling, 2,501 to 3,500 sq ft
$260.00
New Residential — single family dwelling, 3,501 to 4,500 sq ft
$325.00
Existing Residential
$65.00 basic fee, plus $10.00 each additional branch circuit up to the maximum for the corresponding residential square footage
Electrical temporary construction service only (200 amp or less, one location)
$65.00
Modular, manufactured, or mobile homes — electrical
$65.00 basic fee plus $10.00 for each additional circuit
Request inspection / re-inspection / technical service
$65.00 minimum plus $65.00 per hour or portion thereof in excess of one hour, including travel to and from job location

Review timeline

Plan reviewMiddleton’s published plan-review target
1–1 business days

How long did your Electrical Permit permit actually take in Middleton?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough-In

    After wiring installed, before walls closed

  2. 2

    Final

    All devices installed and operational per 2023 NEC

See the full Middleton inspection guide — scheduling & re-inspection fees →

Tips

  • The City's electrical permit form states 'ALLOW 24 HOURS FOR PERMIT PROCESSING' for permits applied for and issued through the CitizenServe portal — this is the only Middleton-published trade-permit processing timeframe found.
  • Failure to obtain a permit before starting work results in double or triple fees per the permit form.
  • Middleton's electrical inspector is Shane Vigil, (208) 861-1008.

Frequently asked questions

Middleton requires an electrical permit for: Permit required before starting electrical work; failure to obtain a permit prior to starting work results in double/triple fees; All permits applied for and issued through the CitizenServe portal; allow 24 hours for permit processing; Work must comply with the 2023 National Electrical Code (NEC) with Idaho amendments; Inspections must be requested through the CitizenServe portal before 4:00 PM for next-day scheduling. If your project isn't listed, confirm with City of Middleton Building Department at (208) 585-3133 before starting work.

In Middleton, the published New Residential — single family dwelling, up to 1,500 sq ft is: $130.00. Additional published fees: New Residential — single family dwelling, 1,501 to 2,500 sq ft — $195.00; New Residential — single family dwelling, 2,501 to 3,500 sq ft — $260.00; New Residential — single family dwelling, 3,501 to 4,500 sq ft — $325.00; Existing Residential — $65.00 basic fee, plus $10.00 each additional branch circuit up to the maximum for the corresponding residential square footage; Electrical temporary construction service only (200 amp or less, one location) — $65.00; Modular, manufactured, or mobile homes — electrical — $65.00 basic fee plus $10.00 for each additional circuit; Request inspection / re-inspection / technical service — $65.00 minimum plus $65.00 per hour or portion thereof in excess of one hour, including travel to and from job location. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Per the City's Electrical Permit form (Attachment B, revised 8/1/2024), permits applied for and issued through the CitizenServe portal take approximately 24 hours to process.

You'll need: Electrical Permit Application (Attachment B, Revised 8/1/2024). See the required-documents checklist on this page for details on each.

Middleton requires 2 inspection(s) for an electrical permit, in order: Rough-In, Final. Schedule each through City of Middleton Building Department ((208) 585-3133).

Apply through City of Middleton Building Department at 1103 W Main St, Middleton, ID 83644. Phone: (208) 585-3133, email: citmid@middletoncity.org. Office hours: Mon–Fri 8:00 AM – 5:00 PM. Official information: https://middleton.id.gov/Departments/Building.

Middleton, Idaho has adopted: 2018 International Building Code (IBC), with Idaho amendments — adopted by reference via Middleton City Code Title 4, Chapter 1 (state-adopted code); 2018 International Residential Code (IRC), Parts I, II, III and IX — Idaho Residential Code (2020 Edition amendments); 2018 International Existing Building Code (IEBC); 2018 International Energy Conservation Code (IECC) — Idaho Energy Conservation Code (2020 Edition amendments); 2018 International Mechanical Code (IMC); 2018 International Fuel Gas Code (IFGC); 2018 International Residential Code Parts V & VI (mechanical); 2017 Idaho State Plumbing Code (based on 2015 Uniform Plumbing Code); 2023 National Electrical Code (NEC), with Idaho amendments; 2018 International Fire Code (IFC) — administered by the Idaho State Fire Marshal, not the City; ICC/ANSI A117.1-2009 (Accessible and Usable Buildings and Facilities). Local amendments apply — see the Middleton overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-04.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Middleton building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.