Electrical Permit (State-Issued — Idaho DOPL, not the City) in Hayden, Idaho

Electrical permits within Hayden city limits are NOT issued by the City of Hayden. The City's own Residential Permit Application Instructions expressly direct applicants to the State of Idaho Division of Building Safety (DOPL) for electrical permits and inspections, and require state permits to be final-approved before a City Final Inspection can be scheduled.

Verified 2026-07-04 · Source

When you need this permit

  • Electrical permit required for installation, alteration, or repair of any hard-wired electrical system; issued and inspected by the State of Idaho (DOPL Division of Building Safety), NOT the City of Hayden Building Department
  • Apply online at https://dbs.idaho.gov/ or by phone at (800) 955-3044
  • State electrical permits must be final-approved before the City of Hayden will schedule a City Final Inspection on the associated building permit
  • Governed by the National Electrical Code (NEC) as adopted statewide by the Idaho Electrical Board (Idaho Code Title 54, Chapter 10)

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

New Single-Family Dwelling (by living space) — up to 1,500 / 1,501-2,500 / 2,501-3,500 / 3,501-4,500 / over 4,500 sq ftState of Idaho DOPL Electrical Permit Fee Schedule — a state fee, not collected by the City of Hayden. This is the same statewide DOPL fee table cited in the Kootenai County unincorporated-area entry.
$130 / $195 / $260 / $325 / $325 plus $65 per additional 1,000 sq ft or portion thereof
Existing residence, modular/manufactured/mobile home, or detached shop (homeowner permit)State of Idaho DOPL Electrical Permit Fee Schedule
$65 base fee plus $10 per additional branch circuit

Review timeline

Plan review
Not published — contact the department

How long did your Electrical Permit (State-Issued — Idaho DOPL, not the City) permit actually take in Hayden?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough-In (DOPL-inspected)

    Wiring and box placement before walls are closed, performed by a State of Idaho DOPL inspector

  2. 2

    Final (DOPL-inspected)

    Devices installed, panel labeled, protections verified per NEC; must be final-approved before the City of Hayden schedules its own City Final Inspection

See the full Hayden inspection guide — scheduling & re-inspection fees →

Tips

  • Do not attempt to apply for an electrical permit through the City of Hayden's BS&A Online portal — it is not issued there. Apply through DOPL at dbs.idaho.gov or (800) 955-3044.
  • Because the City's own Final Inspection cannot be scheduled until the State electrical (and plumbing) permits are final-approved, sequence the DOPL trade inspections early to avoid delaying the overall project closeout.

Frequently asked questions

Hayden requires an electrical permit (state-issued — idaho dopl, not the city) for: Electrical permit required for installation, alteration, or repair of any hard-wired electrical system; issued and inspected by the State of Idaho (DOPL Division of Building Safety), NOT the City of Hayden Building Department; Apply online at https://dbs.idaho.gov/ or by phone at (800) 955-3044; State electrical permits must be final-approved before the City of Hayden will schedule a City Final Inspection on the associated building permit; Governed by the National Electrical Code (NEC) as adopted statewide by the Idaho Electrical Board (Idaho Code Title 54, Chapter 10). If your project isn't listed, confirm with City of Hayden Community Development Department, Building Division at (208) 209-2025 (Building Division); (208) 209-2022 also published on department handouts before starting work.

In Hayden, the published New Single-Family Dwelling (by living space) — up to 1,500 / 1,501-2,500 / 2,501-3,500 / 3,501-4,500 / over 4,500 sq ft is: $130 / $195 / $260 / $325 / $325 plus $65 per additional 1,000 sq ft or portion thereof. Additional published fees: Existing residence, modular/manufactured/mobile home, or detached shop (homeowner permit) — $65 base fee plus $10 per additional branch circuit. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Hayden does not publish a plan-review timeline for this permit. Contact City of Hayden Community Development Department, Building Division at (208) 209-2025 (Building Division); (208) 209-2022 also published on department handouts for current turnaround.

You'll need: DOPL Electrical Permit (Contractor or Homeowner). See the required-documents checklist on this page for details on each.

Hayden requires 2 inspection(s) for an electrical permit (state-issued — idaho dopl, not the city), in order: Rough-In (DOPL-inspected), Final (DOPL-inspected). Schedule each through City of Hayden Community Development Department, Building Division ((208) 209-2025 (Building Division); (208) 209-2022 also published on department handouts).

Apply through City of Hayden Community Development Department, Building Division at 8930 N Government Way, Hayden, ID 83835. Phone: (208) 209-2025 (Building Division); (208) 209-2022 also published on department handouts, email: permits@cityofhaydenid.us. Office hours: Not published on the Building Department page or in the Residential Permit Application Instructions as a discrete office-hours line; standard City Hall hours apply. Applications are submitted electronically through the BS&A Online portal (bsaonline.com/?uid=2689), not primarily in person.. Official information: https://www.haydenid.gov/departments/building/index.php.

Hayden, Idaho has adopted: Idaho has a mandatory statewide baseline building code under the Idaho Building Code Act (Idaho Code Title 39, Chapter 41). The City of Hayden is an INCORPORATED CITY within Kootenai County with its own separate Building Department, entirely distinct from Kootenai County Community Development's Building Division (which administers only the unincorporated area of the county). Kootenai County's own adopted-codes documentation explicitly lists Hayden among the incorporated cities in the county with their own building departments and codes. Source: Kootenai County Code Title 7, Chapter 1, Section 7.1.103 (Applicability), https://codelibrary.amlegal.com/codes/kootenaicountyid/latest/kootenaicounty_id/0-0-0-2406; City of Hayden adopted codes, in effect as of January 1, 2021 (City Code, Title 9, Building Regulations): 2018 International Building Code (IBC), 2018 International Existing Building Code (IEBC), 2018 International Residential Code (IRC), 2018 International Mechanical Code (IMC), 2018 International Fuel/Gas Code (IFGC), 2018 International Energy Conservation Code (IECC), 2018 International Fire Code (IFC), 2015 International Swimming Pool and Spa Code (ISPSC), 2009 ICC A117.1 Accessible and Usable Buildings and Facilities, and the Idaho Manufactured Home Installation Standard (State of Idaho Division of Building Safety, 1-2018). Source: City of Hayden Building Department Design Criteria handout, https://cms2.revize.com/revize/hayden/document_center/Government/CED/Building/Frequently%20Asked%20Questions/BuildingDepartmentDesignCriteria.pdf; Plumbing, sewer, and electrical permitting and inspection within Hayden city limits are handled by the STATE of Idaho (Division of Building Safety / DOPL), NOT the City of Hayden — the City's own Residential Permit Application Instructions expressly direct applicants to 'Contact the State of Idaho, Division of Building Safety at (800)955-3044 or apply online https://dbs.idaho.gov/' for plumbing, sewer, and electrical permits/inspections, and state that 'State Permits must be final approved prior to scheduling a City Final Inspection.' This differs from neighboring Coeur d'Alene and Post Falls, which each issue their own electrical and plumbing permits directly. Source: City of Hayden Residential Permit Application Instructions, https://cms2.revize.com/revize/hayden/document_center/Government/CED/Building/Residential%20Permits/ResidentialPermitApplicationPacket.pdf; Mechanical/HVAC permits ARE issued directly by the City of Hayden Building Department (not the State), using the City's own itemized Residential Mechanical Worksheet and fee schedule. Source: City of Hayden Residential Mechanical Worksheet (same packet) and City of Hayden Fee Schedule (Exhibit A, eff. 9/1/2023); Building permit applications and construction documents are submitted electronically as PDFs through the BS&A Online portal (bsaonline.com/?uid=2689); the City does not describe an in-person plan drop-off as the primary application method. Source: City of Hayden Residential Permit Application Instructions. Local amendments apply — see the Hayden overview page for the full list.

No. The City of Hayden's own Residential Permit Application Instructions direct applicants to the State of Idaho Division of Building Safety (DOPL), (800) 955-3044 or dbs.idaho.gov, for electrical (and plumbing/sewer) permits and inspections. State permits must be final-approved before the City will schedule its own Final Inspection. Source: City of Hayden Residential Permit Application Instructions.

Sources & verification

Verified against official sources. Last reviewed 2026-07-04.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Hayden building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.