Hayden has no dedicated EV charger or EVSE permit and no distinct fee line item for electric vehicle charging equipment. Electrical permits within Hayden city limits are NOT issued by the City -- the City's own Residential Permit Application Instructions direct applicants to the State of Idaho Division of Building Safety (DOPL) for electrical permits and inspections. An EV charger circuit is not a power-generation or energy-storage system, so it does not require a City structural/building permit. On the DOPL Contractor Electrical Permit Worksheet, EV charger circuits fall under the general 'Other Installations including Commercial/Industrial/Solar/Renewable Energy' valuation-based fee formula (the same formula used for solar, just without the Solar/Renewable Energy checkbox), since no dedicated EV/EVSE line item exists on the state form.

Verified 2026-07-20 · Source

When you need this permit

  • No City of Hayden building permit is required for a standard EV charger installation -- only electrical work is involved
  • Electrical permit issued by the State of Idaho Division of Building Safety (DOPL), NOT the City of Hayden -- apply online at dbs.idaho.gov or by phone at (800) 955-3044
  • On the DOPL worksheet, EV charger circuits fall under 'OTHER INSTALLATIONS including COMMERCIAL/INDUSTRIAL/SOLAR/RENEWABLE ENERGY' -- this category 'shall apply to any and all electrical installations not specifically mentioned elsewhere on this form,' and EV/EVSE circuits have no dedicated line item, so they fall under this catch-all
  • Do NOT check the 'Solar, Renewable Energy, power generation, power production, or energy storage systems' box on the DOPL worksheet for a straight EV charger install -- the fee formula is identical either way
  • Governed by the National Electrical Code (NEC) as adopted statewide by the Idaho Electrical Board (Idaho Code Title 54, Chapter 10)

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

State DOPL Electrical Permit -- Other Installations, up to $10,000 system costIdaho DOPL Contractor Electrical Permit Worksheet (Fee Schedule), Rev. 8/17/2022 -- same formula tier used for solar/renewable energy; no dedicated EV/EVSE line item exists on the state form. This is a state fee, not collected by the City of Hayden.
(total cost of system x 0.02) + $60
State DOPL Electrical Permit -- Other Installations, $10,001-$100,000 system costIdaho DOPL Contractor Electrical Permit Worksheet, Rev. 8/17/2022
((total cost of system - $10,000) x 0.01) + $260

Review timeline

Plan review
Not published — contact the department

How long did your EV Charger / EVSE Permit permit actually take in Hayden?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    State Electrical Inspection (DOPL-inspected)

    Performed by a State of Idaho DOPL inspector; charger circuit, disconnect, and GFCI/load-management compliance verified before energizing

See the full Hayden inspection guide — scheduling & re-inspection fees →

Tips

  • Do not attempt to apply for an EV charger's electrical permit through the City of Hayden's BS&A Online portal -- it is not issued there. Apply through DOPL at dbs.idaho.gov or (800) 955-3044.
  • Hayden has no EV-specific permit or fee -- a home or business EV charger install is just a standard State of Idaho DOPL electrical permit, priced under the general 'Other Installations' valuation formula.

Frequently asked questions

Hayden requires an ev charger / evse permit for: No City of Hayden building permit is required for a standard EV charger installation -- only electrical work is involved; Electrical permit issued by the State of Idaho Division of Building Safety (DOPL), NOT the City of Hayden -- apply online at dbs.idaho.gov or by phone at (800) 955-3044; On the DOPL worksheet, EV charger circuits fall under 'OTHER INSTALLATIONS including COMMERCIAL/INDUSTRIAL/SOLAR/RENEWABLE ENERGY' -- this category 'shall apply to any and all electrical installations not specifically mentioned elsewhere on this form,' and EV/EVSE circuits have no dedicated line item, so they fall under this catch-all; Do NOT check the 'Solar, Renewable Energy, power generation, power production, or energy storage systems' box on the DOPL worksheet for a straight EV charger install -- the fee formula is identical either way; Governed by the National Electrical Code (NEC) as adopted statewide by the Idaho Electrical Board (Idaho Code Title 54, Chapter 10). If your project isn't listed, confirm with City of Hayden Community Development Department, Building Division at (208) 209-2025 (Building Division); (208) 209-2022 also published on department handouts before starting work.

In Hayden, the published State DOPL Electrical Permit -- Other Installations, up to $10,000 system cost is: (total cost of system x 0.02) + $60. Additional published fees: State DOPL Electrical Permit -- Other Installations, $10,001-$100,000 system cost — ((total cost of system - $10,000) x 0.01) + $260. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Hayden does not publish a plan-review timeline for this permit. Contact City of Hayden Community Development Department, Building Division at (208) 209-2025 (Building Division); (208) 209-2022 also published on department handouts for current turnaround.

You'll need: DOPL Electrical Permit (Contractor or Homeowner). See the required-documents checklist on this page for details on each.

Hayden requires 1 inspection(s) for an ev charger / evse permit, in order: State Electrical Inspection (DOPL-inspected). Schedule each through City of Hayden Community Development Department, Building Division ((208) 209-2025 (Building Division); (208) 209-2022 also published on department handouts).

Apply through City of Hayden Community Development Department, Building Division at 8930 N Government Way, Hayden, ID 83835. Phone: (208) 209-2025 (Building Division); (208) 209-2022 also published on department handouts, email: permits@cityofhaydenid.us. Office hours: Not published on the Building Department page or in the Residential Permit Application Instructions as a discrete office-hours line; standard City Hall hours apply. Applications are submitted electronically through the BS&A Online portal (bsaonline.com/?uid=2689), not primarily in person.. Official information: https://www.haydenid.gov/departments/building/index.php.

Hayden, Idaho has adopted: Idaho has a mandatory statewide baseline building code under the Idaho Building Code Act (Idaho Code Title 39, Chapter 41). The City of Hayden is an INCORPORATED CITY within Kootenai County with its own separate Building Department, entirely distinct from Kootenai County Community Development's Building Division (which administers only the unincorporated area of the county). Kootenai County's own adopted-codes documentation explicitly lists Hayden among the incorporated cities in the county with their own building departments and codes. Source: Kootenai County Code Title 7, Chapter 1, Section 7.1.103 (Applicability), https://codelibrary.amlegal.com/codes/kootenaicountyid/latest/kootenaicounty_id/0-0-0-2406; City of Hayden adopted codes, in effect as of January 1, 2021 (City Code, Title 9, Building Regulations): 2018 International Building Code (IBC), 2018 International Existing Building Code (IEBC), 2018 International Residential Code (IRC), 2018 International Mechanical Code (IMC), 2018 International Fuel/Gas Code (IFGC), 2018 International Energy Conservation Code (IECC), 2018 International Fire Code (IFC), 2015 International Swimming Pool and Spa Code (ISPSC), 2009 ICC A117.1 Accessible and Usable Buildings and Facilities, and the Idaho Manufactured Home Installation Standard (State of Idaho Division of Building Safety, 1-2018). Source: City of Hayden Building Department Design Criteria handout, https://cms2.revize.com/revize/hayden/document_center/Government/CED/Building/Frequently%20Asked%20Questions/BuildingDepartmentDesignCriteria.pdf; Plumbing, sewer, and electrical permitting and inspection within Hayden city limits are handled by the STATE of Idaho (Division of Building Safety / DOPL), NOT the City of Hayden — the City's own Residential Permit Application Instructions expressly direct applicants to 'Contact the State of Idaho, Division of Building Safety at (800)955-3044 or apply online https://dbs.idaho.gov/' for plumbing, sewer, and electrical permits/inspections, and state that 'State Permits must be final approved prior to scheduling a City Final Inspection.' This differs from neighboring Coeur d'Alene and Post Falls, which each issue their own electrical and plumbing permits directly. Source: City of Hayden Residential Permit Application Instructions, https://cms2.revize.com/revize/hayden/document_center/Government/CED/Building/Residential%20Permits/ResidentialPermitApplicationPacket.pdf; Mechanical/HVAC permits ARE issued directly by the City of Hayden Building Department (not the State), using the City's own itemized Residential Mechanical Worksheet and fee schedule. Source: City of Hayden Residential Mechanical Worksheet (same packet) and City of Hayden Fee Schedule (Exhibit A, eff. 9/1/2023); Building permit applications and construction documents are submitted electronically as PDFs through the BS&A Online portal (bsaonline.com/?uid=2689); the City does not describe an in-person plan drop-off as the primary application method. Source: City of Hayden Residential Permit Application Instructions. Local amendments apply — see the Hayden overview page for the full list.

No. Like all electrical work in Hayden, EV charger circuits are permitted and inspected by the State of Idaho Division of Building Safety (DOPL), not the City. There is no EV/EVSE-specific fee -- the install is priced under DOPL's general 'Other Installations' valuation-based formula, the same one used for solar.

Sources & verification

Verified against official sources. Last reviewed 2026-07-20.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Hayden building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.