Residential Addition / Remodel / Alteration Permit — Hayden, Idaho · Requirements sheet
Verified 2026-07-04 · Source: https://cms2.revize.com/revize/hayden/document_center/Government/Finance/FeeSchedule/Fee%20Schedule%202023%20_Final%208.23.23.pdf
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Residential Addition / Remodel / Alteration Permit in Hayden, Idaho
Required for additions, remodels, alterations, and accessory structures to existing one- and two-family dwellings in Hayden, reviewed against the locally-adopted 2018 IRC. Additions are valued as a percentage of ICC R-3 valuation depending on whether plumbing is included; remodels are valued at estimated contract price.
Verified 2026-07-04 · Source
When you need this permit
- Building permit required for additions, remodels, alterations, and accessory structures (garages, pole structures, carports, patio covers, decks)
- Additions with plumbing are valued at 100% of ICC R-3 valuation; additions without plumbing at 75% of ICC R-3 valuation, per the Building Permit Fee Calculation Table
- Remodels are valued at estimated contract price, run through the Building Permit Fee Calculation Table
- Site plan showing dimensioned distances to property lines, existing/proposed structures, and current R-1 (5 ft) / R-S (10 ft) accessory-building setbacks — verify current setbacks against Hayden City Code 11-2-3 rather than relying on a static template
- Retaining walls valued at $14.00 per lineal foot with a $100.00 minimum; fences over 6 feet are a $65.00 flat permit fee
- Plumbing and electrical work associated with the addition/remodel is permitted separately through the State of Idaho DOPL, not the City
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 3 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Footing/Foundation
Required before concrete pour for deck posts, additions, or new footings
- 2
Framing
Structural framing and connections to the existing structure per approved plans
- 3
Final
All work complete per approved plans
See the full Hayden inspection guide — scheduling & re-inspection fees →
Tips
- Additions with plumbing are valued at full ICC R-3 valuation (100%), while additions without plumbing are valued at 75% — confirm which category applies before estimating fees.
- Fences over 6 feet require only a flat $65.00 permit fee, not a valuation-based Building Permit Fee — verify current fence height/placement standards against Hayden City Code Title 11, Chapter 4.
- Setback figures on the City's static Site Plan template are current only as of October 2021 per the City's own disclaimer — always cross-check against the live Hayden City Code 11-2-3 before finalizing plans.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-04.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Hayden building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Hayden
Residential Addition / Remodel / Alteration Permit in other cities
Compare residential addition / remodel / alteration permit fees across Idaho →
Look up this fee in a different city →
Now live
Build your Hayden project checklist
Describe your project once and get every permit, document, and fee it triggers in Hayden — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →