You are viewing the permanent link for the record currently in effect, published 2026-07-07.
Notus building permits
Notus, Idaho — as published 2026-07-07.
Reviewed 2026-07-08 · Source
Codes adopted
Permit types & fees
Residential Building Permit (New Construction, Additions, Remodels)
Required for new single-family residence construction, residential additions (including attached garages/carports), and residential remodels involving structural changes in the City of Notus. Issued by the City of Notus Building Department; plans are also routed through Planning and Zoning approval.
Reviewed 2026-07-08 · Source
Requirements
- New single-family residence construction requires a building permit and Planning & Zoning approval before Building Department approval
- Residential additions, including attached garages/carports, require a permit
- Residential remodels requiring structural changes require a permit
- Reroofing, free-standing sheds over 200 sq ft, box car units, installation of larger windows, and anything attached to the home (e.g., a patio cover) require a permit per the City's community guidance
- 3 complete sets of plans and specifications required, drawn to scale
- Flood plain determination required on application; elevation certificate required if property is in a flood plain
Required documents
- RequiredResidential Building Permit ApplicationCity of Notus Building Department application form (Revised 01/19); covers new single-family residence, residential addition, and residential remodel categories
- RequiredSite PlanMust include lot lines, private and public utilities, drainage, easements, and North arrow
- RequiredFoundation PlanIncluding reinforcement, ventilation, and frost walls for stoops and overhangs
- RequiredFloor PlanIncluding window and door sizes, ventilation, required exits, and lighting
- RequiredRoof, Wall, and Floor Framing PlanStructural framing details
- RequiredElevationsIncluding roof slope, attic ventilation, chimney, and building heights
- RequiredMechanical PlanHVAC and ducting systems
- RequiredBuilding SectionFoundation to roof
- RequiredEnergy Code Compliance Form (REScheck)Or show prescriptive compliance with the Idaho Energy Conservation Code
- OptionalElevation CertificateRequired only if the project site is within a flood plain
Fee schedule
| Fee type | Amount | Notes |
|---|
Solar Photovoltaic (PV) Permit
VerifiedRequired for rooftop or ground-mounted solar photovoltaic installation within Notus city limits. The City of Notus does not publish a dedicated solar/PV permit — the array/mounting/structural scope is permitted under the City's standard Residential Building Permit, while electrical work (PV wiring and utility interconnection) is issued through the State of Idaho, not the City. The City's own Forms-Apps-Permits page states plainly: 'Plumbing, Mechanical and Electrical permits are issued through State agencies.'
Verified 2026-07-19 · Source
Requirements
- Residential Building Permit required from the City of Notus Building Department for the array mounting/structural scope
- 3 complete sets of plans and specifications, drawn to scale, submitted with the application
- Electrical permit for the PV wiring/interconnection must be obtained separately from the Idaho Division of Occupational and Professional Licenses (DOPL) / Division of Building Safety, NOT from the City — confirmed directly on the City's own Forms-Apps-Permits page
- No dedicated Solar Permit Application or expedited solar-specific review track is published by the City of Notus or DOPL as of 2026-07-19
Required documents
- RequiredResidential Building Permit ApplicationCity of Notus Building Department application form (Revised 01/19), used for the array/structural scope since there is no dedicated solar application
- RequiredState of Idaho DOPL Electrical Permit Application (Contractor or Homeowner)Obtained directly from the Idaho Division of Occupational and Professional Licenses for the PV wiring/interconnection scope
- RequiredSite PlanMust include lot lines, private and public utilities, drainage, easements, and North arrow
Fee schedule
| Fee type | Amount | Notes |
|---|
EV Charger / EVSE Permit
VerifiedThe City of Notus does not publish a dedicated EV charger/EVSE permit, and does not issue electrical permits of any kind — the City's own Forms-Apps-Permits page states plainly that 'Plumbing, Mechanical and Electrical permits are issued through State agencies.' Installation of a Level 2 EV charger requires an electrical permit from the Idaho Division of Occupational and Professional Licenses (DOPL) / Electrical Board, the same statewide mechanism that covers all other electrical work in Notus (including solar PV interconnection). If any structural/mounting work or new panel enclosure triggers building-permit scope, that portion would fall under the City's standard Residential Building Permit.
Verified 2026-07-20 · Source
Requirements
- Electrical permit for EV charger wiring/circuit installation must be obtained from the Idaho DOPL Electrical Board, not the City of Notus — confirmed on the City's own Forms-Apps-Permits page
- Contractor Electrical Permit Application or Homeowner Electrical Permit Application (DOPL), purchased via DOPL's online ArcGIS-based permit system
- If the installation involves structural work (e.g., new panel enclosure, mounting structure) a City of Notus Residential Building Permit may also be required for that scope
- No EV-specific permit category, application, or fee schedule is published by the City of Notus or by Idaho DOPL as of 2026-07-20
Required documents
- RequiredState of Idaho DOPL Electrical Permit Application (Contractor or Homeowner)Obtained directly from the Idaho Division of Occupational and Professional Licenses for the EV charger circuit/wiring scope
- OptionalResidential Building Permit ApplicationCity of Notus Building Department application form, only if structural/mounting scope is involved
Fee schedule
| Fee type | Amount | Notes |
|---|
Sources & verification
Key facts verified against official sources. Last reviewed 2026-07-08.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Notus building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.