You are viewing the permanent link for the record currently in effect, published 2026-08-02.
Notus building permits
Notus, Idaho — as published 2026-08-02.
Reviewed 2026-07-08 · Source
Codes adopted
Permit types & fees
Residential Building Permit (New Construction, Additions, Remodels)
Required for new single-family residence construction, residential additions (including attached garages/carports), and residential remodels involving structural changes in the City of Notus. Issued by the City of Notus Building Department; plans are also routed through Planning and Zoning approval.
Reviewed 2026-07-08 · Source
Requirements
- New single-family residence construction requires a building permit and Planning & Zoning approval before Building Department approval
- Residential additions, including attached garages/carports, require a permit
- Residential remodels requiring structural changes require a permit
- Reroofing, free-standing sheds over 200 sq ft, box car units, installation of larger windows, and anything attached to the home (e.g., a patio cover) require a permit per the City's community guidance
- 3 complete sets of plans and specifications required, drawn to scale
- Flood plain determination required on application; elevation certificate required if property is in a flood plain
Required documents
- RequiredResidential Building Permit ApplicationCity of Notus Building Department application form (Revised 01/19); covers new single-family residence, residential addition, and residential remodel categories
- RequiredSite PlanMust include lot lines, private and public utilities, drainage, easements, and North arrow
- RequiredFoundation PlanIncluding reinforcement, ventilation, and frost walls for stoops and overhangs
- RequiredFloor PlanIncluding window and door sizes, ventilation, required exits, and lighting
- RequiredRoof, Wall, and Floor Framing PlanStructural framing details
- RequiredElevationsIncluding roof slope, attic ventilation, chimney, and building heights
- RequiredMechanical PlanHVAC and ducting systems
- RequiredBuilding SectionFoundation to roof
- RequiredEnergy Code Compliance Form (REScheck)Or show prescriptive compliance with the Idaho Energy Conservation Code
- OptionalElevation CertificateRequired only if the project site is within a flood plain
Fee schedule
| Fee type | Amount | Notes |
|---|
Solar Photovoltaic (PV) Permit
VerifiedRequired for rooftop or ground-mounted solar photovoltaic installation within Notus city limits. The City of Notus does not publish a dedicated solar/PV permit — the array/mounting/structural scope is permitted under the City's standard Residential Building Permit, while electrical work (PV wiring and utility interconnection) is issued through the State of Idaho, not the City. The City's own Forms-Apps-Permits page states plainly: 'Plumbing, Mechanical and Electrical permits are issued through State agencies.'
Verified 2026-07-19 · Source
Requirements
- Residential Building Permit required from the City of Notus Building Department for the array mounting/structural scope
- 3 complete sets of plans and specifications, drawn to scale, submitted with the application
- Electrical permit for the PV wiring/interconnection must be obtained separately from the Idaho Division of Occupational and Professional Licenses (DOPL) / Division of Building Safety, NOT from the City — per the City's own Forms-Apps-Permits page
- No dedicated Solar Permit Application or expedited solar-specific review track is published by the City of Notus or DOPL as of 2026-07-19
Required documents
- RequiredResidential Building Permit ApplicationCity of Notus Building Department application form (Revised 01/19), used for the array/structural scope since there is no dedicated solar application
- RequiredState of Idaho DOPL Electrical Permit Application (Contractor or Homeowner)Obtained directly from the Idaho Division of Occupational and Professional Licenses for the PV wiring/interconnection scope
- RequiredSite PlanMust include lot lines, private and public utilities, drainage, easements, and North arrow
Fee schedule
| Fee type | Amount | Notes |
|---|
EV Charger / EVSE Permit
VerifiedThe City of Notus does not publish a dedicated EV charger/EVSE permit, and does not issue electrical permits of any kind — the City's own Forms-Apps-Permits page states plainly that 'Plumbing, Mechanical and Electrical permits are issued through State agencies.' Installation of a Level 2 EV charger requires an electrical permit from the Idaho Division of Occupational and Professional Licenses (DOPL) / Electrical Board, the same statewide mechanism that covers all other electrical work in Notus (including solar PV interconnection). If any structural/mounting work or new panel enclosure triggers building-permit scope, that portion would fall under the City's standard Residential Building Permit.
Verified 2026-07-20 · Source
Requirements
- Electrical permit for EV charger wiring/circuit installation must be obtained from the Idaho DOPL Electrical Board, not the City of Notus — confirmed on the City's own Forms-Apps-Permits page
- Contractor Electrical Permit Application or Homeowner Electrical Permit Application (DOPL), purchased via DOPL's online ArcGIS-based permit system
- If the installation involves structural work (e.g., new panel enclosure, mounting structure) a City of Notus Residential Building Permit may also be required for that scope
- No EV-specific permit category, application, or fee schedule is published by the City of Notus or by Idaho DOPL as of 2026-07-20
Required documents
- RequiredState of Idaho DOPL Electrical Permit Application (Contractor or Homeowner)Obtained directly from the Idaho Division of Occupational and Professional Licenses for the EV charger circuit/wiring scope
- OptionalResidential Building Permit ApplicationCity of Notus Building Department application form, only if structural/mounting scope is involved
Fee schedule
| Fee type | Amount | Notes |
|---|
Commercial Building Permit (New Construction)
Required for new commercial building construction within Notus city limits. Issued by the City of Notus Building Department using the City's 'Commercial Building Permit Application' (Rev. 01/15), which also covers Tenant Improvement projects on the same form but with a separate, lighter document checklist. Plans are routed through Planning and Zoning approval in addition to Building Department review, the same two-step sequence used for residential permits.
Reviewed 2026-08-02 · Source
Requirements
- New commercial building construction requires a City of Notus building permit and Planning & Zoning approval before Building Department approval
- 2 complete sets of plans and specifications required, drawn to scale (the commercial application specifies 2 sets, versus 3 sets required on the residential application)
- Idaho Contractor Name & Registration Number required on the application
- Flood plain determination required on application; elevation certificate required if property is in a flood plain
- Building Code Analysis required, covering construction type, occupant load, required exits, and fire sprinklers
- Applicant must specify building square footage; project use must be specified (if warehouse/storage, the materials to be stored must be specified)
Required documents
- RequiredCommercial Building Permit ApplicationCity of Notus Building Department application form (Revised 01/15); single form covering both 'New Commercial Building' and 'Tenant Improvement' project types with separate checklists
- RequiredBuilding Code AnalysisConstruction type, occupant load, required exits, fire sprinklers, etc.
- RequiredCover SheetPlan index, building type, and square footage
- RequiredSite PlanIncluding lot lines, private and public utilities, drainage, easements, and North arrow
- RequiredFoundation PlanIncluding reinforcement, ventilation, and frost walls for stoops and overhangs
- RequiredFloor PlanIncluding window and door sizes, ventilation, required exits, and lighting
- RequiredRoof, Wall, and Floor Framing PlanStructural framing details
- RequiredElevationsIncluding roof slope, attic ventilation, chimney, and building heights
- RequiredMechanical PlanHVAC and ducting systems
- RequiredDrainage PlansMust include calculations
- RequiredElectrical PlanSubmitted for plan review as part of the building permit packet; the electrical work permit itself is issued separately through Idaho state agencies (DOPL), per the City's own Forms-Apps-Permits page
- RequiredPlumbing PlanInterior and exterior schematic; submitted for plan review as part of the building permit packet, while the plumbing work permit itself is issued separately through Idaho state agencies (DOPL)
- RequiredLandscape PlanLandscape plan for the site
- RequiredEnergy Code Compliance Form (COM Check)Commercial energy code compliance documentation
- OptionalElevation CertificateRequired only if the project site is within a flood plain
Fee schedule
| Fee type | Amount | Notes |
|---|
Tenant Improvement (TI) Permit
Required for remodel/build-out work within an existing commercial building (tenant improvement) in Notus. Issued by the City of Notus Building Department using the same 'Commercial Building Permit Application' (Rev. 01/15) form used for new commercial construction, but under a distinct, lighter 'Tenant Improvement' checklist — since the underlying building shell, site, and foundation are presumed already permitted.
Reviewed 2026-08-02 · Source
Requirements
- Tenant Improvement (interior remodel/build-out of an existing commercial space) requires a City of Notus Commercial Building Permit Application under the 'Tenant Improvement' checklist section
- 2 complete sets of plans and specifications required, drawn to scale
- Applicant must state both project square footage AND project value ($) on the application — the 'Project Value' field is specific to the Tenant Improvement checklist and is not present on the 'New Commercial Building' checklist of the same form
- Idaho Contractor Name & Registration Number required on the application
- Building Code Analysis required, covering construction type, occupant load, required exits, and fire sprinklers
- Site Plan, Foundation Plan, Elevations, Drainage Plans, and Landscape Plan are NOT part of the Tenant Improvement checklist (unlike the New Commercial Building checklist on the same form), consistent with TI scope being interior work within an existing shell
Required documents
- RequiredCommercial Building Permit ApplicationCity of Notus Building Department application form (Revised 01/15); the same form used for new commercial construction, filled out under the 'Tenant Improvement' checklist section with Square Footage and Project Value fields
- RequiredCover SheetPlan index, building type, and square footage
- RequiredBuilding Code AnalysisConstruction type, occupant load, required exits, fire sprinklers, etc.
- RequiredFloor PlanIncluding window and door sizes, ventilation, required exits, and lighting
- RequiredRoof, Wall, and Floor Framing PlanStructural framing details
- RequiredMechanical PlanHVAC and ducting systems
- RequiredElectrical PlanSubmitted for plan review as part of the building permit packet; the electrical work permit itself is issued separately through Idaho state agencies (DOPL), per the City's own Forms-Apps-Permits page
- RequiredPlumbing PlanInterior and exterior schematic; submitted for plan review as part of the building permit packet, while the plumbing work permit itself is issued separately through Idaho state agencies (DOPL)
- RequiredEnergy Code Compliance Form (COMCheck)Commercial energy code compliance documentation
Fee schedule
| Fee type | Amount | Notes |
|---|
Sources & verification
Key facts verified against official sources. Last reviewed 2026-07-08.
Applications & forms
Online permit portal
Codes & ordinances
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Notus building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.