Grangeville building permits
VerifiedGrangeville, Idaho — as published 2026-07-07.
Verified 2026-07-08 · Source
Codes adopted
Permit types & fees
Residential Building Permit (New Construction, Additions, Alterations, Repairs)
VerifiedRequired for new single-family residential construction, additions, alterations, and repairs within the City of Grangeville and its Area of Impact. Issued by Grangeville City Hall; plan review and inspections performed under contract by a Nez Perce County building official.
Verified 2026-07-08 · Source
Requirements
- All new residential construction, additions, alterations, and repairs within City limits or the Grangeville Area of Impact require a building permit
- Submit a completed Building Permit & Plan Review Application to the City Clerk at City Hall, 225 West North Street
- Provide two sets of plans (18" x 24" or 24" x 36") for review, including a plot/site plan drawn to scale
- Residential projects must include a foundation plan (footings, stem wall, depth, rebar layout), front and one side elevation, framing type, roof system and snow-load rating, and cladding/roofing materials
- Exempt: detached single-story accessory structures/sheds under 200 sq ft; decks under 200 sq ft and under 30 inches above grade not attached to the dwelling
- If the project includes a bathroom or other plumbing, a separate Idaho DOPL state plumbing permit is required (plumbing is not city-issued)
- Permit becomes null and void if work is not commenced within 180 days, or is suspended/abandoned for 180 days after commencement
Required documents
- RequiredBuilding Permit & Plan Review Application (2024)Official City of Grangeville application form; includes project valuation, building area, contractor registration declaration, and applicant certification
- RequiredBuilding Plot PlanSite plan example showing property lines, setbacks, and structure placement, drawn to scale
- RequiredResidential Construction Plan PackageFoundation plan, elevation drawings (front + one side), framing details, roof system/snow-load rating, cladding and roofing materials; full building plans required for substantial remodels or new construction
- OptionalBuilding Permit — Pole Barn Construction GuideSupplemental plan guide for pole-barn/pole-building accessory structures, including framing, footing depth, and bracing details
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee — valuation under $1,201 | $15.00 | City of Grangeville Master Fee Schedule (Resolution #309, Exhibit A), effective 10/21/2025, Building Permit Fee Schedule table |
| Building Permit Fee — valuation $1,201–$100,000 | Graduated table ranging from $47.90 (at $1,201–$1,300) up to $993.75 (at $99,001–$100,000); see full valuation table | Master Fee Schedule, Building Permit Fee Schedule table, effective 10/21/2025 |
| Building Permit Fee — valuation $100,001–$500,000 | $993.75 for the first $100,000, plus $5.60 for each additional $1,000 or fraction thereof | Master Fee Schedule, effective 10/21/2025 |
| Building Permit Fee — valuation $500,001–$1,000,000 | $3,233.75 for the first $500,000, plus $4.75 for each additional $1,000 or fraction thereof | Master Fee Schedule, effective 10/21/2025 |
| Building Permit Fee — valuation $1,000,001 and up | $5,608.75 for the first $1,000,000, plus $3.65 for each additional $1,000 or fraction thereof | Master Fee Schedule, effective 10/21/2025 |
| Plan Review Fee | 40% of the corresponding Building Permit Fee (listed as a separate column for every valuation tier) | Master Fee Schedule, Building Permit Fee Schedule table, effective 10/21/2025 |
| Work started without a building permit | Building permit fee is doubled | Master Fee Schedule, Building Permits section, effective 10/21/2025 |
Solar Photovoltaic (PV) Permit
VerifiedRequired for installation of rooftop or ground-mount solar photovoltaic systems within Grangeville city limits and its Area of Impact. Requires a City Building Permit (structural/racking, valuation-based per the City's Master Fee Schedule) plus a State of Idaho electrical permit (wiring/interconnection) issued by the Division of Occupational and Professional Licenses (DOPL, formerly Division of Building Safety) -- Grangeville does not run its own electrical permitting program. The state's own Contractor Electrical Permit Worksheet has a dedicated checkbox and valuation-based fee formula for 'Solar, Renewable Energy, power generation, power production, or energy storage systems.'
Verified 2026-07-20 · Source
Requirements
- City Building Permit & Plan Review Application submitted to Grangeville City Hall for the structural/racking scope; plan review and inspections performed under contract by a Nez Perce County building official
- Electrical wiring/interconnection scope requires a State of Idaho DOPL Contractor Electrical Permit (or Homeowner Electrical Permit if self-installed) -- not a City permit, since Grangeville has no electrical-permit program of its own
- On the DOPL Electrical Permit Worksheet, check the 'Solar, Renewable Energy, power generation, power production, or energy storage systems' box under 'Other Installations including Commercial/Industrial/Solar/Renewable Energy' and enter the total cost of the electrical system
- Renewable energy installations require a plan check prior to final inspection, per the DOPL Electrical Permit Worksheet
- As of January 1, 2023, all DOPL permits must be purchased online at dbs.idaho.gov rather than by mailed paper application
Required documents
- RequiredCity of Grangeville Building Permit & Plan Review Application (2024)For the structural/racking scope, submitted to City Hall
- RequiredIdaho DOPL Contractor (or Homeowner) Electrical Permit ApplicationState application with an Electrical Permit Worksheet (Fee Schedule) that includes a dedicated Solar/Renewable Energy checkbox and valuation-based fee formula
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| City Building Permit Fee — valuation under $1,201 | $15.00 | City of Grangeville Master Fee Schedule (Resolution #309, Exhibit A), effective 10/21/2025 -- no dedicated solar/photovoltaic building fee line exists; billed under this general valuation table for the structural/racking scope |
| City Plan Review Fee | 40% of the corresponding Building Permit Fee | Master Fee Schedule, effective 10/21/2025 |
| State DOPL Electrical Permit — Solar/Renewable Energy, up to $10,000 system cost | (total system cost x 0.02) + $60 | Idaho DOPL Contractor Electrical Permit Worksheet (Fee Schedule), 'Other Installations including Commercial/Industrial/Solar/Renewable Energy' section, Rev. 8/17/2022 |
| State DOPL Electrical Permit — Solar/Renewable Energy, $10,001-$100,000 system cost | ((system cost - $10,000) x 0.01) + $260 | Idaho DOPL Contractor Electrical Permit Worksheet, Rev. 8/17/2022 |
| State DOPL Electrical Permit — Solar/Renewable Energy, over $100,001 system cost | ((system cost - $100,000) x 0.005) + $1,160 | Idaho DOPL Contractor Electrical Permit Worksheet, Rev. 8/17/2022; renewable energy installations require a plan check prior to final inspection |
EV Charger / Electric Vehicle Charging Station Permit
VerifiedInstalling a Level 2 (240V) EV charger circuit at an existing residence in Grangeville is electrical work, and since Grangeville has no electrical-permit program of its own, it requires a State of Idaho DOPL Contractor (or Homeowner) Electrical Permit -- the same statewide authority that issues the electrical permit for solar installations. Idaho's DOPL Electrical Permit Worksheet (Fee Schedule, Rev. 8/17/2022) has no dedicated 'EV charger,' 'EVSE,' or 'electric vehicle' checkbox -- confirmed by direct text search of the current worksheet PDF, which does have a dedicated checkbox for 'Solar, Renewable Energy, power generation, power production, or energy storage systems' but none for EV charging. A standalone EV charger circuit added to an existing home is instead billed under the worksheet's general 'Existing Residence' branch-circuit line item, not the Other-Installations/Renewable-Energy valuation formula used for solar.
Verified 2026-07-20 · Source
Requirements
- Electrical work must be permitted through the State of Idaho DOPL, not the City of Grangeville -- the City issues only structural/building permits, and an EV charger circuit with no new structure does not require a City Building Permit at all
- On the DOPL Electrical Permit Worksheet, a new dedicated EV charger circuit added to an existing single-family residence falls under the 'Existing Residence -- Modular, Manufactured or Mobile Homes -- Detached Shop' line item: a $65 base fee plus $10 per additional branch circuit beyond the one included in the base fee
- There is no Solar/Renewable-Energy-style checkbox or valuation-based formula for EV chargers on the state worksheet -- do not check that box for a standalone EV charger installation, since EVSE is treated as ordinary branch-circuit wiring, not power generation/storage
- As of January 1, 2023, all DOPL permits must be purchased online at dbs.idaho.gov rather than by mailed paper application
- A homeowner installing their own EV charger circuit (not through a contractor) may instead use the DOPL Homeowner Electrical Permit Application
Required documents
- RequiredIdaho DOPL Contractor (or Homeowner) Electrical Permit ApplicationState application with an Electrical Permit Worksheet (Fee Schedule); no EV-specific checkbox exists -- use the 'Existing Residence' branch-circuit line item for a standalone charger circuit
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Existing Residence -- new branch circuit (e.g., a single new EV charger circuit) | $65 base fee + $10 per additional branch circuit (one circuit included in the $65 base) | Idaho DOPL Contractor Electrical Permit Worksheet (Fee Schedule), Rev. 8/17/2022, 'Existing Residence — Modular, Manufactured or Mobile Homes — Detached Shop' line -- no distinct 'EV charger'/'EVSE' line item exists on the statewide worksheet, confirmed by direct text search of the current PDF. A single new EV charger circuit at an existing home would be $65 + $10 = $75. |
| Requested Inspection (Findings or Inspector Consultation) | $65.00 per hour | Idaho DOPL Contractor Electrical Permit Worksheet, Rev. 8/17/2022 |
| Small Works (work not exceeding $500 in cost, no change in service connections) | $10.00 | Idaho DOPL Contractor Electrical Permit Worksheet, Rev. 8/17/2022 -- not applicable to installations requiring or requesting inspection, so unlikely to apply to a typical EV charger circuit which does require inspection |
Sources & verification
Verified against official sources. Last reviewed 2026-07-08.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Grangeville building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.