Version history — Grangeville, Idaho
This is PermitBase’s own verified record for Grangeville, reconstructed from this dataset’s version-controlled history. Each version below reflects what our record stated as of that date — it is not a warranty of what Grangeville’s actual law was at that time.
Permanent link to today’s record
Look up a specific date
Pick a date and we’ll show you the record as it stood then.
All versions
- 2026-08-26Current record
- 2026-08-02Superseded
- Grangeville, Idaho — Residential Building Permit (New Construction, Additions, Alterations, Repairs) fee record added: Fire Inspection (business/commercial occupancy) ($50.00, plus $50.00 for each additional/follow-up inspection if non-compliance requires re-inspection)
- Grangeville, Idaho — Residential Building Permit (New Construction, Additions, Alterations, Repairs) fee record added: Application for Certificate of Compliance (change of land/structure use) (Not published in the Master Fee Schedule -- no fee line for 'Certificate of Compliance' appears anywhere in the 7-page schedule (checked the Zoning and General Administration sections specifically))
- 2026-07-20Superseded
- Grangeville, Idaho — Solar Photovoltaic (PV) Permit record added
- Grangeville, Idaho — EV Charger / Electric Vehicle Charging Station Permit record added
- 2026-07-07Initial record — coverage of Grangeville began