Post Falls building inspections

Verified

Inspection sequence, scheduling, and re-inspection fees for building permits in Post Falls, Idaho.

Verified 2026-07-03 · Source

How to schedule

Inspections are requested through the building department below.

Address
1st Floor of City Hall, 408 N Spokane St, Post Falls, ID 83854
Phone
(208) 773-8708
Office hours
8:00 a.m. to 5:00 p.m., Monday through Friday. Dedicated Building Inspections line: (208) 457-3334 — leave permit number, job address, inspection type, and desired inspection date; requests left after midnight the night before cannot be scheduled for the following day.

Published scheduling rules

  • To request an inspection, call the dedicated Building Inspections line at (208) 457-3334 with permit number, job address, inspection type, and desired date; requests left after midnight cannot be scheduled for the next day. (Residential Building Permit (New Construction))

Inspection sequence

Applies to: Accessory Dwelling Unit (ADU) Permit

  1. 1

    Foundation

    Before concrete pour, per standard Residential Building Permit inspection sequence

  2. 2

    Framing

    Structural framing per approved plans

  3. 3

    Mechanical/Electrical/Plumbing Rough-In

    Verifies the ADU's independent electrical, kitchen, and sanitary facilities are properly roughed in

  4. 4

    Final

    Confirms independent electricity, kitchen, and sanitary facilities; parking space; setback and lot-coverage compliance; and only one street-visible entrance

Applies to: Residential Building Permit (New Construction)

  1. 1

    Foundation

    Before concrete pour — footing/foundation cross-sections, reinforcement, anchor bolts, and embedment depth per approved plans; frost depth minimum 24 inches

  2. 2

    Framing

    Floor, wall, and roof framing per plans; braced wall panels; egress windows; one-hour fire separation between house and garage; smoke/CO detector rough-in

  3. 3

    Mechanical/Electrical/Plumbing Rough-In

    Ductwork, wiring, and piping rough-in before wall closure

  4. 4

    Final

    All work complete per approved plans; smoke/CO detectors interconnected and installed per code; furnace/water heater location and fuel type verified; attic and crawlspace access confirmed

Applies to: Plumbing Permit

  1. 1

    Underground/Slab

    Before concrete pour — pipe slope, materials, and cleanouts

  2. 2

    Rough-In

    After pipes are installed, before walls are closed

  3. 3

    Final

    All fixtures connected, water heater verified, cleanouts exposed, no leaks

Applies to: Residential Addition / Remodel / Alteration Permit

  1. 1

    Footing/Foundation

    Required before concrete pour for deck posts, garage foundations, or addition footings

  2. 2

    Framing

    Structural framing and connections to the existing structure per plans

  3. 3

    Final

    All work complete per approved plans

Applies to: Electrical Permit

  1. 1

    Rough-In

    Wiring, box placement, and service connections before walls are closed

  2. 2

    Final

    Devices installed, panel labeled, protections verified per the 2023 NEC

Applies to: EV Charger / EVSE Permit

  1. 1

    Rough-In

    EVSE circuit wiring, box placement, and service connections before walls are closed

  2. 2

    Final

    Charger installed, panel labeled, protections verified per the 2023 NEC

Applies to: Mechanical / HVAC Permit

  1. 1

    Rough-In

    Ductwork and mechanical equipment rough-in before walls closed; gas piping pressure test before concealment

  2. 2

    Final

    Equipment operational; exhaust vents verified; gas appliance clearances and shutoff valves verified

Applies to: Solar Photovoltaic (PV) Permit

  1. 1

    Rough Electrical

    Conduit runs, wire sizing, and disconnect placement before energizing, per NEC Article 690

  2. 2

    Final

    Panel mounting, racking attachment, roof penetration sealing, electrical connections, inverter, and interconnection point verified

Re-inspection fees

Electrical PermitReinspection · City of Post Falls Fee Schedule, rev 10-1-2025
Fee equal to the permit fee

Sources & verification

Verified against official sources. Last reviewed 2026-07-03.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Post Falls building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Post Falls building permits

Get alerts for Post Falls

We'll email you when Post Falls's fees, documents, or codes change — not often.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.