EV Charger / EVSE Permit — Post Falls, Idaho · Requirements sheet
Verified 2026-07-20 · Source: https://www.postfalls.gov/DocumentCenter/View/815/Fee-Schedule-PDF
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
EV Charger / EVSE Permit in Post Falls, Idaho
The City of Post Falls has no EV-charger-specific permit type or fee line — confirmed by direct review of the City's Fee Schedule (rev 10-1-2025), which contains no EV charger, electric vehicle, or EVSE line item anywhere. An EV charger circuit is filed as ordinary residential electrical work, governed by the 2023 NEC as adopted by the City, and billed under the 'Existing Residence/Modular, Manufactured, or Mobile Home/Detached Shop/Garage' fee category — the same flat fee (one circuit included, plus per-additional-circuit charge) used for any other existing-home electrical addition.
Verified 2026-07-20 · Source
When you need this permit
- Electrical permit required for the EV charger circuit installation, filed as ordinary residential electrical work
- Governed by the 2023 NEC as adopted by the City of Post Falls
- Apply through the Community Development Portal; may be submitted alongside or after a Building Permit application if applicable
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough-In
EVSE circuit wiring, box placement, and service connections before walls are closed
- 2
Final
Charger installed, panel labeled, protections verified per the 2023 NEC
See the full Post Falls inspection guide — scheduling & re-inspection fees →
Tips
- There is no dedicated EV-charger permit fee line in Post Falls — a new EVSE circuit at an existing home is billed as ordinary 'Existing Residence' electrical work: $65.00 (one circuit included) plus $10.00 per additional branch circuit.
- Failure to obtain a permit before starting work results in a fee equal to double the standard permit fee, per the City's Fee Schedule.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Post Falls building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Post Falls
EV Charger / EVSE Permit in other cities
Compare ev charger / evse permit fees across Idaho →
Look up this fee in a different city →
Related guides
Now live
Build your Post Falls project checklist
Describe your project once and get every permit, document, and fee it triggers in Post Falls — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →