This is PermitBase’s published record for Moscow as of 2026-08-02. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.
Moscow building permits
VerifiedMoscow, Idaho — as published 2026-08-02.
Verified 2026-07-04 · Source
Codes adopted
Permit types & fees
Residential Building Permit (New Single-Family Dwelling / Addition)
VerifiedRequired for new one- and two-family dwelling construction and additions within Moscow city limits, administered by the City of Moscow Building Safety Division. Building Permit Fees are based on ICC Building Valuations (February issue of the Building Safety Journal) on a bracketed fee table, with a separate Plan Review Fee for projects valued over $10,000.
Verified 2026-07-04 · Source
Requirements
- Site/plot plan required with all building permit applications (except simple re-roof permits), showing property lines, all structures, street, driveway, sidewalk, and location of proposed work
- Floor plans showing all door/window sizes and locations, room dimensions and uses
- For new dwellings/additions: foundation plan, floor framing plan, roof framing plan, electrical plan (meter, switch, outlet, and light locations), and two sets of wet-stamped structural/truss calculations if required
- Two complete paper sets of plans (or one electronic set, followed by two stamped paper sets after electronic approval) submitted to the Community Development Office
- Contractor must be registered with the State of Idaho; name and registration number required on the application
- Plan Review Fee (65% of Building Permit Fee, or 40% for duplicate plans) applies to projects over $10,000 in valuation; a $500 Plan Review Deposit is credited toward this fee
Required documents
- RequiredBuilding Permit ApplicationCity of Moscow application specifying scope of work, floor area, and contact for plan corrections; submitted to the Community Development Office, 504 S. Washington Street
- RequiredSite/Plot PlanOverhead view of the entire property showing property lines, structures, street, driveway, sidewalk, and proposed work location
- RequiredConstruction Drawings (Floor, Foundation, Framing, Roof, Electrical Plans)Required for new dwellings and additions; complexity scales with project size
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Total Valuation $1.00 to $2,000 (Fee Amount for First $500) | $27.50 | Plus $3.50 for each additional $100 or fraction thereof to and including $2,000. City of Moscow FY2026 Fee Schedule, Schedule C, page 5 |
| Total Valuation $2,001 to $25,000 (Fee Amount for First $2,000) | $79.50 | Plus $14.50 for each additional $1,000 or fraction thereof, to and including $25,000. City of Moscow FY2026 Fee Schedule |
| Total Valuation $25,001 to $50,000 (Fee Amount for First $25,000) | $413.00 | Plus $10.50 for each additional $1,000 or fraction thereof, to and including $50,000. City of Moscow FY2026 Fee Schedule |
| Total Valuation $50,001 to $100,000 (Fee Amount for First $50,000) | $675.50 | Plus $7.50 for each additional $1,000 or fraction thereof to and including $100,000. City of Moscow FY2026 Fee Schedule |
| Total Valuation $100,001 and up (Fee Amount for First $100,000) | $1,050.50 | Plus $6.00 for each additional $1,000 or fraction thereof. City of Moscow FY2026 Fee Schedule |
| Permit Issuance Fee | $32.75 | Charged with all permits except flat-fee, Commercial, and Institutional permits. City of Moscow FY2026 Fee Schedule, page 6 |
| Decks (per square foot addition to base ICC valuation) | $15.75 | Per square foot. City of Moscow FY2026 Fee Schedule, page 5 |
| Plan Review Fee (projects over $10,000 in valuation) | 65% of the Building Permit Fee (40% for duplicate plans) | City of Moscow FY2026 Fee Schedule, page 6 |
| Plan Review Deposit | $500.00 | Credited toward the Plan Review Fee. City of Moscow FY2026 Fee Schedule, page 6 |
| No Permit (failure to obtain permit before commencing work) | Fee equal to the Building Permit Fee | City of Moscow FY2026 Fee Schedule, page 6 |
Electrical Permit
VerifiedRequired for electrical installation, alteration, service change-out, or new circuit work within Moscow city limits, administered by the City of Moscow Building Safety Division under the locally adopted National Electrical Code (NEC).
Verified 2026-07-04 · Source
Requirements
- Electrical permit required for service change-outs, circuit extensions/additions, and new residential electrical service and wiring
- New residential (single- and two-family only) electrical service and wiring is fee-assessed per square foot
- Commercial electrical work (including multi-family dwellings, fraternities/sororities, and mobile park distribution wiring/pedestals) is fee-assessed on a contract-price bracket table
- Permit Issuance Fee charged with all permits except flat-fee, Commercial, and Institutional permits
Required documents
- RequiredElectrical Permit ApplicationSubmitted to the City of Moscow Community Development Office, 504 S. Washington Street
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Electrical Service Change Out | $73.75 | City of Moscow FY2026 Fee Schedule, Schedule C, page 7 |
| Extension or Addition of up to 6 Circuits | $48.00 | City of Moscow FY2026 Fee Schedule |
| Extension or Addition of More Than 6 Circuits | $73.75 | City of Moscow FY2026 Fee Schedule |
| Electric Furnaces, Heat Pumps, Air Conditioners, Unit Space Heaters, Ventilation Fans | $8.75 | Per appliance. City of Moscow FY2026 Fee Schedule |
| Domestic Water Pumps | $36.25 | City of Moscow FY2026 Fee Schedule |
| Commercial Contract Price $0 - $2,000 | $31.75 | Plus 4% of contract price up to $2,000. Includes multi-family dwellings, fraternities/sororities, distribution wiring/pedestals for mobile parks. City of Moscow FY2026 Fee Schedule |
| Commercial Contract Price $2,001 - $10,000 | $117.25 | Plus 3% of contract price over $2,000. City of Moscow FY2026 Fee Schedule |
| Commercial Contract Price $10,001 - $100,000 | $374.75 | Plus 2% of contract price over $10,000. City of Moscow FY2026 Fee Schedule |
| Commercial Contract Price Over $100,001 | $2,303.00 | Plus 1% of contract price over $100,000. City of Moscow FY2026 Fee Schedule |
| Permit Issuance Fee | $32.75 | City of Moscow FY2026 Fee Schedule, page 8 |
| Temporary Service | $23.25 | City of Moscow FY2026 Fee Schedule, page 8 |
| New Dwelling Unit Electrical Service and Wiring (Single/Two Family) | $0.13 | Per square foot. City of Moscow FY2026 Fee Schedule, page 8 |
| Electric Furnaces and Unit Space Heaters (new residential) | $6.25 | Per appliance. City of Moscow FY2026 Fee Schedule, page 8 |
Gas / Mechanical Permit
VerifiedRequired for gas and mechanical/HVAC installation, alteration, or repair within Moscow city limits, administered by the City of Moscow Building Safety Division. Commercial gas/mechanical work is fee-assessed on the same contract-price bracket table as electrical; residential gas-fueled appliance installs are billed by BTU rating.
Verified 2026-07-04 · Source
Requirements
- Gas/Mechanical permit required for air handlers, appliance vent installation/relocation/replacement, gas piping to fixtures/appliances, heating/refrigeration/cooling repairs and alterations, ventilation fans, and wood/pellet stoves
- Residential installs of gas-fueled furnaces, water heaters, boilers, fireplaces, and unit/space heaters are billed per appliance by BTU rating (0-180 thousand BTU vs. 181+ thousand BTU)
- Commercial gas/mechanical work (including multi-family dwellings, fraternities/sororities) is fee-assessed on the contract-price bracket table
Required documents
- RequiredGas/Mechanical Permit ApplicationSubmitted to the City of Moscow Community Development Office, 504 S. Washington Street
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Commercial Contract Price $0 - $2,000 | $31.75 | Plus 4% of contract price up to $2,000. City of Moscow FY2026 Fee Schedule, Schedule C, page 9 |
| Commercial Contract Price $2,001 - $10,000 | $117.25 | Plus 3% of contract price over $2,000. City of Moscow FY2026 Fee Schedule |
| Commercial Contract Price $10,001 - $100,000 | $374.75 | Plus 2% of contract price over $10,000. City of Moscow FY2026 Fee Schedule |
| Commercial Contract Price Over $100,000 | $2,303.00 | Plus 1% of contract price over $100,000. City of Moscow FY2026 Fee Schedule |
| Air Handlers | $20.25 | Per each air-handling unit, including ducts attached thereto. City of Moscow FY2026 Fee Schedule |
| Installation, Relocation or Replacement of Appliance Vent (not included in an appliance permit) | $12.75 | Each. City of Moscow FY2026 Fee Schedule |
| Gas Piping - Fixture or Appliance Outlets | $10.50 | Per outlet. City of Moscow FY2026 Fee Schedule |
| Permit Issuance Fee | $32.75 | City of Moscow FY2026 Fee Schedule |
| Repair, Alteration, or Addition to Heating/Refrigeration/Cooling Appliance | $26.75 | Each. City of Moscow FY2026 Fee Schedule |
| Ventilation Fan Connected to a Single Duct | $12.75 | Each. City of Moscow FY2026 Fee Schedule |
| Wood / Pellet Stoves | $23.25 | Each. City of Moscow FY2026 Fee Schedule |
| Residential Gas-Fueled Furnace/Water Heater/Boiler/Fireplace/Unit or Space Heater, 0-180 Thousand BTU | $39.25 | Per appliance. City of Moscow FY2026 Fee Schedule |
| Residential Gas-Fueled Furnace/Water Heater/Boiler/Fireplace/Unit or Space Heater, 181+ Thousand BTU | $49.00 | Per appliance. City of Moscow FY2026 Fee Schedule |
Electric Vehicle (EV) Charger Permit
VerifiedMoscow publishes no distinct EV-charger permit type or fee line — confirmed against the Building Safety Division page and the City of Moscow FY2026 Fee Schedule, neither of which contains an EV-charger/EVSE entry. A new circuit or outlet installed to serve a residential EV charger is fee-assessed under the general Electrical Permit's 'Extension or Addition of Circuits' category (a new dedicated EV circuit is typically one circuit, billed at the 'up to 6 circuits' rate); a panel/service upgrade for a higher-amperage Level 2 charger would instead fall under the Electrical Service Change Out fee.
Verified 2026-07-20 · Source
Requirements
- A new circuit or outlet for an EV charger requires an Electrical Permit under the City's locally adopted National Electrical Code (NEC)
- Fee-assessed under the 'Extension or Addition of up to 6 Circuits' category for a typical single dedicated EV charger circuit
- A panel/service upgrade (e.g., to support a Level 2 charger) is instead fee-assessed under the Electrical Service Change Out category
- Submitted to the City of Moscow Community Development Office, 504 S. Washington Street
- Permit Issuance Fee charged in addition to the circuit/service fee, except for flat-fee, Commercial, and Institutional permits
Required documents
- RequiredElectrical Permit ApplicationSubmitted to the City of Moscow Community Development Office; describe scope as new circuit/outlet or service change-out for EV charging
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Extension or Addition of up to 6 Circuits (applies to a typical new EV charger circuit) | $48.00 | City of Moscow FY2026 Fee Schedule, Schedule C — no distinct EV-charger fee line exists; this is the general fee category a new dedicated circuit falls under |
| Electrical Service Change Out (applies if a panel/service upgrade is needed for a Level 2 charger) | $73.75 | City of Moscow FY2026 Fee Schedule, Schedule C, page 7 |
| Permit Issuance Fee | $32.75 | City of Moscow FY2026 Fee Schedule, page 8 |
Demolition Permit
VerifiedRequired for demolition of structures within Moscow city limits, administered by the City of Moscow Building Safety Division, with distinct flat fees for Simple (non-structural alterations) versus Complex (structural or complete building demolition) demolitions.
Verified 2026-07-04 · Source
Requirements
- Simple Demolition applies to non-structural alterations
- Complex Demolition applies to structural alterations or complete building demolition
Required documents
- RequiredDemolition Permit ApplicationSubmitted to the City of Moscow Community Development Office, 504 S. Washington Street
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Simple Demolition (Non-Structural Alterations) | $69.50 | City of Moscow FY2026 Fee Schedule, Schedule C, page 6 |
| Complex Demolition (Structural or Complete Building Demolition) | $295.50 | City of Moscow FY2026 Fee Schedule |
Re-Roofing Permit
VerifiedRequired for re-roofing of residential structures (up to 4 units) within Moscow city limits; commercial re-roofs require a full Building Permit rather than this flat-fee category.
Verified 2026-07-04 · Source
Requirements
- Residential re-roofing (structures up to 4 units) uses the flat Re-Roofing Permit fee
- Commercial re-roofs require a full Building Permit (valuation-based fee table applies instead)
Required documents
- RequiredRe-Roofing Permit ApplicationSubmitted to the City of Moscow Community Development Office; simple re-roof permits are exempt from the site-plan requirement per the Homeowner's Guide
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Re-Roofing Permit (Residential Structures up to 4 Units) | $71.50 | Commercial re-roofs require full Building Permit. City of Moscow FY2026 Fee Schedule, Schedule C, page 6 |
| Permit Issuance Fee | $32.75 | City of Moscow FY2026 Fee Schedule |
Residential Solar Photovoltaic (PV) Permit
VerifiedRequired for installation of rooftop or ground-mounted solar photovoltaic systems within Moscow city limits. Moscow has no dedicated solar/PV permit application or fee line — solar installations are billed under the City's standard valuation-based Building Permit fee table (for the array/mounting/structural work) and the standard Electrical Permit fee table (for the electrical interconnection), administered by the Building Safety Division under the locally adopted IBC/IRC and NEC.
Verified 2026-07-20 · Source
Requirements
- Building Permit required for the array mounting/structural work, submitted to the Community Development Office, 504 S. Washington Street, or online via PermitTrax
- Electrical Permit required for the PV system wiring and interconnection, under the locally adopted National Electrical Code (NEC)
- Site/plot plan required showing the location of the proposed array on the structure or lot
- Contractor must be registered with the State of Idaho; registration number required on the application
- No dedicated Solar Permit Application or expedited solar-specific review track is published by the City of Moscow as of 2026-07-19 — solar/PV work is processed as a standard Building + Electrical Permit combination
Required documents
- RequiredBuilding Permit ApplicationCity of Moscow application; used for solar array/mounting/structural scope since there is no dedicated solar application
- RequiredElectrical Permit ApplicationCovers the PV system wiring and utility interconnection
- RequiredSite/Plot PlanShows the array location on the structure or lot
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee (valuation-based) | Per the Total Valuation bracket table (e.g., $79.50 for $2,001-$25,000, plus $14.50 per additional $1,000) | No solar-specific fee line found; billed under the same ICC-valuation Building Permit table as other construction. City of Moscow FY2026 Fee Schedule, Schedule C, page 5 |
| Electrical Permit Fee (interconnection wiring) | Per the Electrical Permit fee table (e.g., Extension/Addition of up to 6 Circuits $48.00, or Commercial contract-price bracket for larger systems) | No solar-specific electrical fee line found. City of Moscow FY2026 Fee Schedule, Schedule C, page 7 |
| Permit Issuance Fee | $32.75 | Charged with all permits except flat-fee, Commercial, and Institutional permits. City of Moscow FY2026 Fee Schedule |
| Plan Review Fee (projects over $10,000 in valuation) | 65% of the Building Permit Fee (40% for duplicate plans) | Applies if total project valuation exceeds $10,000. City of Moscow FY2026 Fee Schedule, page 6 |
Commercial Building Permit (New Construction)
VerifiedRequired for new commercial and multi-family building construction within Moscow city limits. There is no separate 'commercial permit' application — Moscow uses the same city-wide Permit Application (a checkbox distinguishes 'Commercial/Multi-Family Residential' from 'Residential (1 & 2 Family)') and the same ICC-valuation-based Building Permit Fee table used for residential permits, but requires larger plan sheets, additional site/civil/landscape/accessibility/energy documentation per the City's Minimum Plan Submittal Guidelines for Multi-Family and Commercial Plans, and carries its own, longer plan-review timeline ('Commercial New', under 15 business days for first review) on the City's Permit Processing Time Frames table.
Verified 2026-08-02 · Source
Requirements
- Permit Application (city-wide Building Safety form) with 'Commercial/Multi-Family Residential' project type checked, nature of work marked 'New', and trade-contractor registration numbers listed
- Plans submitted electronically or as five (5) sets of paper plans, on sheets 18"x24" minimum (24"x36" recommended) — larger than the 11"x17" minimum required for One & Two Family projects
- Plans signed by the preparer; wet-stamped and signed by a licensed architect or engineer registered in Idaho when required
- Site/civil plans: property lines and setbacks, utility/sewer/fire-hydrant locations, a parking plan with tabulation of existing/proposed/required spaces, and dimensions of all architectural projections
- General notes on the plans covering occupancy classification, construction type, zoning district, parcel number/legal description, applicable codes, building height, and whether fire sprinklers will be installed
- Structural plans and, when deviating from conventional code provisions, wet-stamped structural calculations
- Accessibility plans showing compliance for accessible/adaptable units, accessible parking, accessible routes and building entrances, and accessible interior features (restrooms, drinking fountains, counters)
- A complete, dimensioned landscape design (required for all new Multi-Family/Commercial construction)
- An International Energy Conservation Code (IECC) compliance checklist with energy calculations
- Stormwater management plan required when new impervious surface totals 5,000 sq ft or more
- A geotechnical report may be required; shoring plans/calculations required for excavations over 4 feet deep or that remove lateral support from an adjacent structure, property, or right-of-way
- Separate permits required for electrical, mechanical, plumbing, fire sprinklers (State of Idaho Fire Marshal approved), fire alarm system, grading, demolition, retaining walls, right-of-way use, driveway aprons, floodplain development, and signs
- Contractor must be registered with the State of Idaho; registration number required on the application
- Certificate of Occupancy (with Life Safety Inspections) required before the completed building may be occupied
Required documents
- RequiredBuilding Permit Application (Full Permit)City-wide Community Development permit application; 'Commercial/Multi-Family Residential' project-type box checked, submitted to 504 S. Washington Street or online via PermitTrax
- RequiredSite/Civil PlansProperty lines, setbacks, utilities, parking tabulation, fire hydrant locations, and public improvements, per the Minimum Plan Submittal Guidelines for Multi-Family and Commercial Plans
- RequiredStructural, Floor, and Exterior Elevation PlansDimensioned plans for each floor/roof level; cross-sections in at least two orthogonal directions; wet-stamped structural calculations if deviating from conventional code provisions
- RequiredLandscape PlanComplete, dimensioned landscape design; required for all new Multi-Family/Commercial construction
- RequiredIECC Energy Conservation ChecklistVerifies compliance with the locally adopted International Energy Conservation Code; computer or point-method calculations
- OptionalStormwater Management PlanRequired when the project creates 5,000 sq ft or more of new impervious surface; must show drainage patterns, drainage devices, and erosion/sediment control
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Total Valuation $1.00 to $2,000 (Fee Amount for First $500) | $27.50 | Same ICC-valuation-based Building Permit Fee table applies to both residential and commercial construction. Plus $3.50 for each additional $100 or fraction thereof to and including $2,000. City of Moscow FY2026 Fee Schedule, Schedule C, page 5 |
| Total Valuation $2,001 to $25,000 (Fee Amount for First $2,000) | $79.50 | Plus $14.50 for each additional $1,000 or fraction thereof, to and including $25,000. City of Moscow FY2026 Fee Schedule |
| Total Valuation $25,001 to $50,000 (Fee Amount for First $25,000) | $413.00 | Plus $10.50 for each additional $1,000 or fraction thereof, to and including $50,000. City of Moscow FY2026 Fee Schedule |
| Total Valuation $50,001 to $100,000 (Fee Amount for First $50,000) | $675.50 | Plus $7.50 for each additional $1,000 or fraction thereof to and including $100,000. City of Moscow FY2026 Fee Schedule |
| Total Valuation $100,001 and up (Fee Amount for First $100,000) | $1,050.50 | Plus $6.00 for each additional $1,000 or fraction thereof. City of Moscow FY2026 Fee Schedule |
| Permit Issuance Fee | Not charged on Commercial permits | The FY2026 Fee Schedule states the $32.75 Permit Issuance Fee is 'Charged With all Permits Except Flat Fee and Commercial and Institutional Permits' — Commercial building permits are exempt from this separate line item. City of Moscow FY2026 Fee Schedule, Schedule C, page 6 |
| Plan Review Fee (projects over $10,000 in valuation, excluding Commercial Windows, Doors and Roofs) | 65% of the Building Permit Fee (40% for duplicate plans) | City of Moscow FY2026 Fee Schedule, page 6 |
| Plan Review Deposit | $500.00 | Credited toward the Plan Review Fee. City of Moscow FY2026 Fee Schedule, page 6 |
| Certificate of Occupancy (Existing Commercial Buildings, Includes Life Safety Inspections) | $79.00 | Also printed as 'Occupancy Permit $79.00' directly on the City's Change of Occupancy Application form; required before a new or altered commercial space may be occupied. City of Moscow FY2026 Fee Schedule, Schedule C, page 6 |
| Multi-Family/Commercial Site Plan Review or Parking Lot Development/Modification Review | $148.50 | Plus $5.90 per parking space. City of Moscow FY2026 Fee Schedule, Schedule C, page 11 |
| Engineering Inspection (Subdivision, PUD, Commercial, and Multi-Family Residential) | 1.25% of Public Improvement Construction Cost as Verified by City | City of Moscow FY2026 Fee Schedule, Schedule C, page 8 |
| Fire Sprinkler Inspection and Plan Review (if fire sprinklers are installed) | $142.75 | Plus $2.00 per sprinkler head. City of Moscow FY2026 Fee Schedule, Schedule C, page 12 |
Commercial Tenant Improvement / Alteration Permit
VerifiedMoscow does not publish a distinct 'Tenant Improvement' permit product, application, or fee line — confirmed against the City's Permit Application (a single form used for all project types), the FY2026 Fee Schedule, and the Minimum Plan Submittal Guidelines for Multi-Family and Commercial Plans. TI/remodel work inside an existing commercial building is processed as a standard Building Permit (Nature of Work: 'Remodel'), billed on the same ICC-valuation-based fee table as new construction, and classified for review-timeline purposes as either 'Commercial Non-Structural Alteration' or 'Commercial Structural Alteration' depending on scope. If the tenant or the use of the space is changing, a separate Change of Occupancy Application (with its own $79.00 Occupancy Permit fee) is also required.
Verified 2026-08-02 · Source
Requirements
- Building Permit Application (city-wide form) with 'Commercial/Multi-Family Residential' project type checked and 'Remodel' checked under Nature of Work
- Floor plans identifying the existing and intended use of every affected room, with door/window schedules and a legend distinguishing existing from new construction
- General notes addressing occupancy classification, construction type, applicable codes, and whether fire sprinklers are affected
- Structural plans and wet-stamped structural calculations required only when the scope includes structural alterations (e.g., removal or modification of load-bearing walls or other structural elements)
- Accessibility-plan compliance (accessible routes, restrooms, and building features) applies to commercial alteration projects per the Minimum Plan Submittal Guidelines for Multi-Family and Commercial Plans
- If the tenant or the permitted use of the space is changing, a separate Change of Occupancy Application must be submitted and approved by Zoning, Building, and Fire before the space may legally be occupied under the new use
- Fire Alarm/Sprinkler System permits are separate (State of Idaho Fire Marshal approved) if the TI scope affects fire-protection systems
- Contractor must be registered with the State of Idaho; registration number required on the application
Required documents
- RequiredBuilding Permit Application (Full Permit)Same city-wide application used for new commercial construction, with 'Remodel' checked as the Nature of Work
- OptionalChange of Occupancy ApplicationRequired only if the tenant or the use/occupancy classification of the space is changing; requires Zoning, Building, and Fire sign-off before issuance; carries its own $79.00 Occupancy Permit fee
- RequiredFloor Plans (Existing and Proposed)Identifies existing vs. new construction and the existing/intended use of every affected room
- OptionalStructural Plans/CalculationsRequired only if the scope includes structural alterations; must be wet-stamped by a licensed architect or engineer registered in Idaho
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee (valuation-based) | Per the Total Valuation bracket table (e.g., $79.50 for $2,001-$25,000, plus $14.50 per additional $1,000) | Same ICC-valuation-based Building Permit Fee table used for new commercial construction and residential permits; no separate TI fee line exists. City of Moscow FY2026 Fee Schedule, Schedule C, page 5 |
| Permit Issuance Fee | Not charged on Commercial permits | City of Moscow FY2026 Fee Schedule, Schedule C, page 6 |
| Plan Review Fee (projects over $10,000 in valuation, excluding Commercial Windows, Doors and Roofs) | 65% of the Building Permit Fee (40% for duplicate plans) | City of Moscow FY2026 Fee Schedule, page 6 |
| Occupancy Permit / Certificate of Occupancy (Existing Commercial Buildings, Includes Life Safety Inspections) | $79.00 | Confirmed both in the FY2026 Fee Schedule, Schedule C, page 6, and printed directly on the City's Change of Occupancy Application form ('Occupancy Permit $79.00'); applies when the tenant or use of an existing commercial building changes |
Sources & verification
Verified against official sources. Last reviewed 2026-07-04.
Fee schedules
Checklists & handouts
Codes & ordinances
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Moscow building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.