You are viewing the permanent link for the record currently in effect, published 2026-07-07.
Salmon building permits
VerifiedSalmon, Idaho — as published 2026-07-07.
Verified 2026-07-08 · Source
Codes adopted
Permit types & fees
Residential Building Permit (New Construction)
VerifiedRequired for new single-family residential construction within Salmon city limits. Salmon has its own codified building-permit requirement (City Code Chapter 151), but permit intake, plan review, and inspection are performed jointly with Lemhi County through the shared Lemhi County and City Building Department using a City-specific application form.
Verified 2026-07-08 · Source
Requirements
- Building permit and plan review approval required for all new residential construction inside Salmon city limits
- Submit the City of Salmon Building Permit Application (distinct from the county application) in person or electronically at 200 Fulton St, Suite 204
- Site plan required for any application involving exterior work, showing setbacks, septic/drain field locations, and driveway access
- Approved access permit required from Lemhi County Road & Bridge (or ITD for state highways) before addressing can be assigned, for new accesses
- Applicant must determine Ground Snow Load via ASCE Hazard Tool and ensure truss design matches
- Plumbing, electrical, and HVAC/mechanical work is permitted separately through Idaho DOPL, not this department
Required documents
- RequiredCity of Salmon Building Permit ApplicationCity-specific application form (distinct from the county's building permit application), revised October 9, 2025, issued by the Lemhi County and City Building Department
- RequiredSite PlanRequired for any application with exterior work; must show setbacks from lot lines, streets, and waterways, plus septic/drain field/replacement area locations, per IRC (2018) 107.2.6
- RequiredConstruction DrawingsFoundation plan, floor plan, floor framing plan, roof framing plan, building bracing plan, and building cross sections per the application's 'Requirements for ALL Construction Plans' checklist
- RequiredAdditional Construction Checklist itemsFor new homes, additions, or heated accessory buildings: heating/cooling/ventilation plan, safety (egress, smoke/CO detectors, stair details), and energy code compliance (prescriptive or performance method)
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit — valuation $1 to $500 | $24 | Lemhi County Fee Schedule, Exhibit A (eff. 10/28/2024), based on IRC Appendix L valuation table. No separate City of Salmon fee schedule was found; the joint Building/Planning & Zoning Department administers city and county permits under this same schedule — both the City and County permit application forms direct payment to 'Lemhi County.' |
| Building Permit — valuation $501 to $2,000 | $24 for the first $500, plus $3 for each additional $100 or fraction thereof | — |
| Building Permit — valuation $2,001 to $40,000 | $69 for the first $2,000, plus $11 for each additional $1,000 or fraction thereof | — |
| Building Permit — valuation $40,001 to $100,000 | $487 for the first $40,000, plus $9 for each additional $1,000 or fraction thereof | — |
| Building Permit — valuation $100,001 to $500,000 | $1,027 for the first $100,000, plus $7 for each additional $1,000 or fraction thereof | — |
| Building Permit — valuation $500,001 to $1,000,000 | $3,827 for the first $500,000, plus $5 for each additional $1,000 or fraction thereof | — |
| Building Permit — valuation $1,000,001 to $5,000,000 | $6,327 for the first $1,000,000, plus $3 for each additional $1,000 or fraction thereof | — |
| Building Permit — valuation $5,000,001 and over | $18,327 for the first $5,000,000, plus $1 for each additional $1,000 or fraction thereof | — |
| Re-Inspection Fee | $47.00 per occurrence; $47.00/hour if inspection exceeds one hour | Lemhi County Fee Schedule, Exhibit A (eff. 10/28/2024) |
| Partial Inspection Fee | $47.00; $47.00/hour if inspection exceeds one hour | Lemhi County Fee Schedule, Exhibit A (eff. 10/28/2024) |
Solar Photovoltaic (PV) Permit
VerifiedRequired for installing a rooftop or ground-mount photovoltaic system within Salmon city limits. Electrical work is NOT reviewed by the Lemhi County and City Building Department — it is a separate State of Idaho permit issued by the Division of Occupational and Professional Licenses (DOPL, formerly branded Division of Building Safety/DBS), which publishes a dedicated Solar/Renewable Energy fee formula. Any structural/roof-mount building-permit component is reviewed locally under the Lemhi County Fee Schedule's general valuation-based Building Permit table (no separate solar line item published there).
Verified 2026-07-20 · Source
Requirements
- State of Idaho DOPL electrical permit required for the PV system's electrical installation — purchased online at dbs.idaho.gov (redirects to dopl.idaho.gov); NOT issued by the Lemhi County and City Building Department
- Homeowner permit available only for work the property owner personally performs on their own primary/secondary residence, not for rental or commercial use; otherwise a licensed electrical contractor must pull the permit
- Solar/Renewable Energy box must be checked on the DOPL Electrical Permit Worksheet, with the total cost of the electrical system entered as the Job Value Amount
- Grid-Connected Renewable Energy systems require a plan check permit number FIRST (contact DOPL at 1-800-955-3044) before the installation permit can be purchased; Non-Grid-Connected systems require plan check included with the cost of the permit
- Any structural/roof-mount work is reviewed locally under the general valuation-based Lemhi County Fee Schedule Building Permit table if it rises to the level requiring a building permit — confirm with the Lemhi County and City Building Department (208-756-2815 ext. 1704) whether a given installation triggers this
Required documents
- RequiredDOPL Homeowner or Contractor Electrical Permit ApplicationMust be accompanied by the DOPL Electrical Permit Worksheet (Fee Schedule) to calculate and transfer the total fee
- RequiredDOPL Electrical Permit Worksheet (Fee Schedule)Used to calculate the Solar/Renewable Energy fee from the total cost of the electrical system
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| State of Idaho DOPL Electrical Permit — Solar/Renewable Energy (up to $10,000 system cost) | (Total cost of electrical system x 0.02) + $60 | DOPL Electrical Permit Worksheet (Fee Schedule), 'Other Installations including Solar/Renewable Energy' section — identical formula on both the Homeowner Application (rev. 8/17/2022) and Contractor Application worksheets |
| State of Idaho DOPL Electrical Permit — Solar/Renewable Energy ($10,001 to $100,000 system cost) | ((Total cost of electrical system - $10,000) x 0.01) + $260 | — |
| State of Idaho DOPL Electrical Permit — Solar/Renewable Energy (over $100,001 system cost) | ((Total cost of electrical system - $100,000) x 0.005) + $1,160 | — |
| Plan Check Fee (grid-connected renewable energy, required before permit purchase) | $65.00 per hour | — |
| Local building permit (structural/roof-mount, if triggered) | Follows the general Lemhi County Fee Schedule, Exhibit A valuation table (e.g., $69 for the first $2,000 of valuation plus $11 per additional $1,000, for the $2,001-$40,000 tier) | No solar-specific line item found on the Lemhi County Fee Schedule; same table used for the jurisdiction's residential-building-permit entry |
EV Charger / EVSE Permit
VerifiedRequired for installing an electric vehicle charging station (Level 2 or DC fast charger) within Salmon city limits. As with solar, electrical work is NOT reviewed by the Lemhi County and City Building Department — it is a separate State of Idaho permit issued by the Division of Occupational and Professional Licenses (DOPL, formerly Division of Building Safety). DOPL's Electrical Permit Worksheet has no dedicated EV-charger/EVSE fee line; a dedicated EV charger circuit is billed under the same 'Other Installations including Solar/Renewable Energy' cost-based tier used for this file's solar-pv-permit entry, since that category is DOPL's general bucket for installation types not separately itemized elsewhere on the worksheet (new dedicated branch circuits, feeders, sub-panels, etc.).
Verified 2026-07-20 · Source
Requirements
- State of Idaho DOPL electrical permit required for the EV charger's electrical installation (dedicated circuit/branch circuit and any panel work) — purchased online at dbs.idaho.gov (redirects to dopl.idaho.gov); NOT issued by the Lemhi County and City Building Department
- Homeowner permit available only for work the property owner personally performs on their own primary/secondary residence, not for rental or commercial use; otherwise a licensed electrical contractor must pull the permit
- No dedicated 'EV Charger'/'EVSE' checkbox exists on the DOPL Electrical Permit Worksheet; the installation is entered under the 'Other Installations' cost-based fee tier, with the total cost of the electrical work entered as the Job Value Amount
- Any panel upgrade or service change needed to support the charger's circuit is submitted and priced as part of the same electrical permit
- Idaho state law (2023) prohibits local governments from mandating EV charging infrastructure in new construction and preempts local EV-infrastructure ordinances — Salmon/Lemhi County have no local EV-specific permitting mandate beyond the standard DOPL electrical permit
Required documents
- RequiredDOPL Homeowner or Contractor Electrical Permit ApplicationSame application used for the jurisdiction's solar-pv-permit entry; must be accompanied by the DOPL Electrical Permit Worksheet (Fee Schedule) to calculate and transfer the total fee for the EV charger circuit under the 'Other Installations' tier
- RequiredDOPL Electrical Permit Worksheet (Fee Schedule)Used to calculate the 'Other Installations' fee from the total cost of the EV charger's electrical work
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| State of Idaho DOPL Electrical Permit — Other Installations (up to $10,000 system cost) | (Total cost of electrical work x 0.02) + $60 | DOPL Electrical Permit Worksheet (Fee Schedule), 'Other Installations including Solar/Renewable Energy' section — same formula documented in this file's solar-pv-permit entry; no separate EV-charger line item exists, so an EV charger circuit is billed under this general tier |
| State of Idaho DOPL Electrical Permit — Other Installations ($10,001 to $100,000 system cost) | ((Total cost of electrical work - $10,000) x 0.01) + $260 | — |
| Local building permit (if the installation requires structural work, e.g. new outbuilding/carport) | Follows the general Lemhi County Fee Schedule, Exhibit A valuation table (e.g., $69 for the first $2,000 of valuation plus $11 per additional $1,000, for the $2,001-$40,000 tier) | Only triggered if the EV charger installation requires a structural/building-permit component; no EV-specific line item exists on the Lemhi County Fee Schedule |
Sources & verification
Verified against official sources. Last reviewed 2026-07-08.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Salmon building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.