Salmon building permits
VerifiedDepartment contacts, adopted codes, permit types, fees, and gotchas for Salmon, Idaho.
Last verified 2026-07-08 · Source · Embed this page’s badge · Version history
Building department
- Address
- 200 Fulton St, Suite 204, Salmon, ID 83467
- Phone
- (208) 756-2815 ext. 1704
- Office hours
- Mon–Fri (hours not published online; confirm with department)
- Website
- Official site
Inspection guide
See how inspections work in Salmon — sequence, scheduling & re-inspection fees.
Codes adopted
Idaho adopts a statewide baseline building code set under the Idaho Building Code Act (Idaho Code Title 39, Chapter 41) and IDAPA rules administered by the Idaho Division of Occupational and Professional Licenses (DOPL). Effective January 1, 2021, the statewide baseline includes the 2018 International Building Code (IBC), 2020 Idaho Residential Code (based on the 2018 IRC Parts I–III and IX with Idaho amendments), 2020 Idaho Energy Conservation Code (based on the 2018 IECC with Idaho amendments), 2018 International Existing Building Code (IEBC), 2018 International Mechanical Code (IMC), 2018 International Fuel Gas Code (IFGC), and 2018 International Fire Code (IFC). The National Electrical Code is adopted separately by the Idaho Electrical Board (IDAPA 24.39.10), not bundled with the building code: Idaho enforces the 2023 NEC, effective July 1, 2024 (the state used the 2017 NEC with amendments before that and skipped the 2020 edition). Local jurisdictions must enforce the state baseline and may adopt amendments only where those amendments are at least as stringent as the state-adopted editions; local amendments may not be less restrictive. Enforcement is local — each city or county issues permits and performs inspections. Always confirm the current adopted edition and any local amendments with your specific jurisdiction before submitting plans.
- Currently adopted International Residential Code (IRC) — building permit fee valuation table keyed to IRC Appendix L (per Lemhi County Fee Schedule, Exhibit A, eff. 10/28/2024)
- Currently adopted International Building Code (IBC) family of codes, adopted by reference under Salmon City Code Chapter 151 (Building Regulations; Construction), § 151.01 'Adoption of codes by reference'
- State-regulated trades (electrical, plumbing, HVAC/mechanical) are permitted directly through Idaho DOPL, not the local building department
Permit types & fees
Residential Building Permit (New Construction)
Required for new single-family residential construction within Salmon city limits. Salmon has its own codified building-permit requirement (City Code Chapter 151), but permit intake, plan review, and inspection are performed jointly with Lemhi County through the shared Lemhi County and City Building Department using a City-specific application form.
Solar Photovoltaic (PV) Permit
Required for installing a rooftop or ground-mount photovoltaic system within Salmon city limits. Electrical work is NOT reviewed by the Lemhi County and City Building Department — it is a separate State of Idaho permit issued by the Division of Occupational and Professional Licenses (DOPL, formerly branded Division of Building Safety/DBS), which publishes a dedicated Solar/Renewable Energy fee formula. Any structural/roof-mount building-permit component is reviewed locally under the Lemhi County Fee Schedule's general valuation-based Building Permit table (no separate solar line item published there).
EV Charger / EVSE Permit
Required for installing an electric vehicle charging station (Level 2 or DC fast charger) within Salmon city limits. As with solar, electrical work is NOT reviewed by the Lemhi County and City Building Department — it is a separate State of Idaho permit issued by the Division of Occupational and Professional Licenses (DOPL, formerly Division of Building Safety). DOPL's Electrical Permit Worksheet has no dedicated EV-charger/EVSE fee line; a dedicated EV charger circuit is billed under the same 'Other Installations including Solar/Renewable Energy' cost-based tier used for this file's solar-pv-permit entry, since that category is DOPL's general bucket for installation types not separately itemized elsewhere on the worksheet (new dedicated branch circuits, feeders, sub-panels, etc.).
New residential construction activity
New privately-owned residential construction onlyHousing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).
- Latest month (2026-05)
- No data reported
- Trailing 12 months
- No data reported
- Year to date
- No data reported
- Latest full year
- No data reported
Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-05 vintage. Census survey data — separate from the permit-requirements verification above. All Idaho building activity
Tips & gotchas
- Salmon is legally its own permitting authority (City Code Chapter 151 — Building Regulations; Construction), but shares staff and office space with Lemhi County via the 'Lemhi County and City Building Department' at 200 Fulton St, Suite 204 — always use the City-specific application form, not the County form, for in-city work.
- No distinct City of Salmon fee schedule exists online; both city and county permits are billed from the same Lemhi County Fee Schedule (Exhibit A) valuation table, and both application forms direct payment to 'Lemhi County.'
- Frost depth is 36 inches per the local design-criteria table — verify footing depth accordingly.
- Electrical, plumbing, and HVAC/mechanical permits go through Idaho DOPL directly (208-334-3233), not this local department.
- No published review-timeline SLA or processing-timeframe report exists for this jurisdiction — confirm current turnaround by phone.
- New driveway/access points onto county or state roads require a separate access permit (Lemhi County Road & Bridge, or ITD for state highways) before an address can be assigned.