Solar Photovoltaic (PV) Permit in Salmon, Idaho
Required for installing a rooftop or ground-mount photovoltaic system within Salmon city limits. Electrical work is NOT reviewed by the Lemhi County and City Building Department — it is a separate State of Idaho permit issued by the Division of Occupational and Professional Licenses (DOPL, formerly branded Division of Building Safety/DBS), which publishes a dedicated Solar/Renewable Energy fee formula. Any structural/roof-mount building-permit component is reviewed locally under the Lemhi County Fee Schedule's general valuation-based Building Permit table (no separate solar line item published there).
Verified 2026-07-20 · Source
When you need this permit
- State of Idaho DOPL electrical permit required for the PV system's electrical installation — purchased online at dbs.idaho.gov (redirects to dopl.idaho.gov); NOT issued by the Lemhi County and City Building Department
- Homeowner permit available only for work the property owner personally performs on their own primary/secondary residence, not for rental or commercial use; otherwise a licensed electrical contractor must pull the permit
- Solar/Renewable Energy box must be checked on the DOPL Electrical Permit Worksheet, with the total cost of the electrical system entered as the Job Value Amount
- Grid-Connected Renewable Energy systems require a plan check permit number FIRST (contact DOPL at 1-800-955-3044) before the installation permit can be purchased; Non-Grid-Connected systems require plan check included with the cost of the permit
- Any structural/roof-mount work is reviewed locally under the general valuation-based Lemhi County Fee Schedule Building Permit table if it rises to the level requiring a building permit — confirm with the Lemhi County and City Building Department (208-756-2815 ext. 1704) whether a given installation triggers this
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
DOPL Electrical Rough-In/Final
All electrical work performed under a DOPL permit must be inspected by the Division of Occupational and Professional Licensing; at 'Final' inspection the Scope of Work, valuation, and permit fees are verified against actual costs
See the full Salmon inspection guide — scheduling & re-inspection fees →
Tips
- Solar in Salmon involves TWO separate agencies: the State of Idaho DOPL for the electrical permit (dbs.idaho.gov / dopl.idaho.gov, not the local building department), and potentially the Lemhi County and City Building Department for any structural/roof-mount building-permit component.
- DOPL's solar fee formula is tiered by total system cost, not wattage: 2% of cost plus $60 up to $10,000; 1% of the amount over $10,000 plus $260 up to $100,000; 0.5% of the amount over $100,000 plus $1,160 above that.
- A grid-connected system needs a plan-check permit number from DOPL BEFORE you can purchase the installation permit — budget extra lead time for this step.
- The project value used for DOPL's fee calculation cannot be reduced by donated or self-supplied labor, material, or equipment — it is verified against actual cost at the Final inspection.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Salmon building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Salmon
Solar Photovoltaic (PV) Permit in other cities
Compare solar photovoltaic (pv) permit fees across Idaho →
Look up this fee in a different city →
Now live
Build your Salmon project checklist
Describe your project once and get every permit, document, and fee it triggers in Salmon — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →