This is PermitBase’s published record for Heyburn as of 2026-07-04. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.
Heyburn building permits
VerifiedHeyburn, Idaho — as published 2026-07-04.
Verified 2026-07-04 · Source
Codes adopted
Permit types & fees
Residential Home Permit (New Construction — Single Family, Duplex, Zero Lot Line, Townhouse)
VerifiedRequired for new single-family dwellings, duplexes, zero-lot-line homes, and townhouses (separate site-only permit required for townhouses) in the City of Heyburn. Governed by the 2018 IRC and 2018 IECC (with Idaho amendments) per the city's own Residential Home Permit Application. Manufactured and modular homes use a separate application.
Verified 2026-07-04 · Source
Requirements
- Permit application filled out and signed in its entirety — incomplete applications are not accepted
- Residential New Home Checklist attached and completed by the plan designer
- Manual J calculations required for all new construction (including outside air in calculations)
- Energy compliance documentation: prescriptive approach written on plans, or ResCheck performance method
- Construction plans designed per the designer's checklist (site plan, foundation/floor framing plan, floor plan/roof framing plan, energy conservation compliance)
- Engineering and calculations required for walls over 10 feet tall or non-prescriptive wall bracing
- Digital PDF plans (minimum 11"x17", maximum 24"x36"), readable for all displayed info/data; paper plans accepted but returned as a scanned PDF redset
- Curb, gutter, and sidewalk with new construction (deferral possible via notarized form + Warranty Deed if none exists adjacent)
- Fire department access road 20 feet wide, reaching within 150 feet of all exterior walls; turnaround required if access road exceeds 150 feet
- Separate permits required for electrical, plumbing, and mechanical installations
Required documents
- RequiredResidential Home Permit ApplicationCity of Heyburn's own application form, revised by the Building Department 6/22/23, per heyburn.id.gov (2023 Residential New Home Permit PDF).
- RequiredResidential New Home ChecklistDesigner-completed checklist covering site plan, foundation/floor framing plan, floor plan/roof framing plan, and energy conservation items; submitted with plans to the applicant, per the same PDF.
- RequiredManual J CalculationsRequired for all new construction, including outside air in calculations.
- RequiredEnergy Compliance Documentation (ResCheck or prescriptive)ResCheck current version, or a prescriptive-method site plan showing all R-values and types.
- OptionalEngineering & Calculations for Tall Walls/Non-Prescriptive BracingRequired only when walls exceed 10 feet or bracing is non-prescriptive; must be stamped by an Idaho licensed engineer or architect.
Fee schedule
| Fee type | Amount | Notes |
|---|
New or Addition Commercial Building Permit (Commercial/Non-Residential/Multi-Family)
VerifiedRequired for new complete buildings, additions, multi-family (3+ dwelling units), and shell buildings (with or without interior walls) in the City of Heyburn. A pre-submittal meeting is required on all new and addition commercial projects. Governed by the state-referenced 2018 IBC per Heyburn City Code 2-1-1(A).
Verified 2026-07-04 · Source
Requirements
- Pre-submittal meeting required on all new and addition commercial projects (call to schedule)
- Civil Site Plan (required separate from architectural site plan): legal description, property lines/setbacks, right-of-way details, fire department access (20 ft wide, 75,000-lb load capacity, within 150 ft of exterior walls), fire hydrants within 1000 feet, grading plan, utility services, parking layout, storm drainage design and calculations (stamped by Idaho Registered Civil Engineer or Landscape Architect), geotechnical report, water/sewer tap sizes, flood plain indication
- Architectural Site Plan (required in addition to civil site plan): structure locations/distances, IFC-regulated material storage areas, landscaping, exterior lighting, setbacks/easements, trash enclosure/mechanical screening, parking lot design per City Code Title 8 Chapter 9
- Code/Plan Analysis using the application's example Code Analysis form, separately for each building
- Com Check Energy Analysis prepared by an Idaho licensed architect or engineer
- Foundation Plan, Floor Plan, Structural Plans, and Foundation/Structural/Shear Engineering Calculations, all stamped by an Idaho Registered Engineer or Architect (calculations required for all new construction and additions; cannot be a deferred submittal for metal buildings, stair drawings, or permanently fixed furniture)
- Electrical Plans, Mechanical Plans & Ventilation Calculations, Plumbing Plans (with grease/sand interceptor sizing per Idaho State/Uniform Plumbing Code)
- Additional Handicap Accessibility Information per current IBC and ANSI A117.1
- Statement of special inspections per IBC 1704.1.1, with a final report submitted before start of work
- Completed Wastewater Survey and Sewer Capacity Fee Worksheet
- Health District letter of approval required prior to permit issuance for any building where food is prepared
Required documents
- RequiredNew or Addition Commercial Building Permit ApplicationCity of Heyburn's own application form (2023), per heyburn.id.gov.
- Required(New & Addition) Commercial/Non-Residential/Multi-Family Plan Review ChecklistDetailed civil site plan, architectural site plan, and building-systems checklist within the same application packet; design professional must check off that all requirements are provided on plans.
- RequiredSewer Capacity Fee WorksheetFixture-count worksheet (lavatories, water closets, etc.) used to calculate sewer capacity fees; included in the application packet.
- RequiredSample Plans Analysis FormTemplate listing occupancy class, construction type, occupant load, fire ratings, and exiting requirements to be reproduced on the applicant's own plans.
Fee schedule
| Fee type | Amount | Notes |
|---|
Sources & verification
Verified against official sources. Last reviewed 2026-07-04.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Heyburn building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.