Heyburn building permits

Verified

Heyburn, Idaho — as published 2026-07-07.

Verified 2026-07-04 · Source

Codes adopted

2018 International Residential Code (IRC), with Idaho amendments — per Heyburn's own Residential Home Permit Application Plan Submittal Requirements: 'Plans to be designed to the 2018 IRC Code & 2018 IECC. (with Idaho amendments)' (heyburn.id.gov, 2023 Residential New Home Permit application, page 2).2018 International Energy Conservation Code (IECC), with Idaho amendments — same source as above.2018 International Building Code (IBC), with amendments — Heyburn City Code Title 2, Chapter 1, Section 2-1-1(A) adopts by reference 'the following recognized codes as currently adopted by the State of Idaho,' and the State of Idaho's own currently-published adopted-codes list (Idaho DOPL, 'Idaho Adopted Codes,' dopl.idaho.gov/wp-content/uploads/2025/06/2025-Updated-Idaho-Adopted-Codes.pdf) lists the 2018 IBC with amendments as the current state building code.2018 International Existing Building Code (IEBC) — per the same Idaho DOPL 'Idaho Adopted Codes' publication, incorporated into Heyburn's code by the automatic state-code-reference mechanism in Heyburn City Code 2-1-1(A).2018 International Mechanical Code (IMC) and 2018 International Fuel Gas Code (IFGC) — per the same Idaho DOPL 'Idaho Adopted Codes' publication.2017 Idaho State Plumbing Code (based on the 2015 Uniform Plumbing Code) — per the same Idaho DOPL 'Idaho Adopted Codes' publication.2023 National Electrical Code (NEC), with amendments — per the same Idaho DOPL 'Idaho Adopted Codes' publication.IMPORTANT — code-adoption mechanism: Heyburn City Code 2-1-1(A) (amd. Ord. 2026-721, 3-25-2026; Ord. 2026-722, 4-22-2026; codelibrary.amlegal.com/codes/heyburnid/latest/heyburn_id/0-0-0-15510) states verbatim: 'The following recognized codes as currently adopted by the State of Idaho are adopted as the official building codes of the City of Heyburn. Each code shall be deemed superseded by successive versions of such codes as they are adopted or approved by the State of Idaho effective on the 1st day of January the year following the date any such codes are made effective for the State of Idaho, unless a different date is required by state statute.' This means Heyburn's adopted editions track the State of Idaho's current adopted editions automatically, rather than being independently re-adopted by city ordinance edition-by-edition. The city's own 2023-dated Residential and Commercial permit application PDFs both independently confirm the 2018 IRC/2018 IECC editions currently in force, consistent with the state list.NOTE: No Heyburn-specific local amendment TEXT to the IRC/IBC (e.g., a snow-load or seismic design value table, or textual deviations from the model code sections) was found published separately from the state-level amendments referenced above, as of 2026-07-04. Omitted rather than invented.

Permit types & fees

Residential Home Permit (New Construction — Single Family, Duplex, Zero Lot Line, Townhouse)

Verified

Required for new single-family dwellings, duplexes, zero-lot-line homes, and townhouses (separate site-only permit required for townhouses) in the City of Heyburn. Governed by the 2018 IRC and 2018 IECC (with Idaho amendments) per the city's own Residential Home Permit Application. Manufactured and modular homes use a separate application.

Verified 2026-07-04 · Source

Requirements

  • Permit application filled out and signed in its entirety — incomplete applications are not accepted
  • Residential New Home Checklist attached and completed by the plan designer
  • Manual J calculations required for all new construction (including outside air in calculations)
  • Energy compliance documentation: prescriptive approach written on plans, or ResCheck performance method
  • Construction plans designed per the designer's checklist (site plan, foundation/floor framing plan, floor plan/roof framing plan, energy conservation compliance)
  • Engineering and calculations required for walls over 10 feet tall or non-prescriptive wall bracing
  • Digital PDF plans (minimum 11"x17", maximum 24"x36"), readable for all displayed info/data; paper plans accepted but returned as a scanned PDF redset
  • Curb, gutter, and sidewalk with new construction (deferral possible via notarized form + Warranty Deed if none exists adjacent)
  • Fire department access road 20 feet wide, reaching within 150 feet of all exterior walls; turnaround required if access road exceeds 150 feet
  • Separate permits required for electrical, plumbing, and mechanical installations

Required documents

  • RequiredResidential Home Permit ApplicationCity of Heyburn's own application form, revised by the Building Department 6/22/23, per heyburn.id.gov (2023 Residential New Home Permit PDF).
  • RequiredResidential New Home ChecklistDesigner-completed checklist covering site plan, foundation/floor framing plan, floor plan/roof framing plan, and energy conservation items; submitted with plans to the applicant, per the same PDF.
  • RequiredManual J CalculationsRequired for all new construction, including outside air in calculations.
  • RequiredEnergy Compliance Documentation (ResCheck or prescriptive)ResCheck current version, or a prescriptive-method site plan showing all R-values and types.
  • OptionalEngineering & Calculations for Tall Walls/Non-Prescriptive BracingRequired only when walls exceed 10 feet or bracing is non-prescriptive; must be stamped by an Idaho licensed engineer or architect.

Fee schedule

Fee typeAmountNotes

New or Addition Commercial Building Permit (Commercial/Non-Residential/Multi-Family)

Verified

Required for new complete buildings, additions, multi-family (3+ dwelling units), and shell buildings (with or without interior walls) in the City of Heyburn. A pre-submittal meeting is required on all new and addition commercial projects. Governed by the state-referenced 2018 IBC per Heyburn City Code 2-1-1(A).

Verified 2026-07-04 · Source

Requirements

  • Pre-submittal meeting required on all new and addition commercial projects (call to schedule)
  • Civil Site Plan (required separate from architectural site plan): legal description, property lines/setbacks, right-of-way details, fire department access (20 ft wide, 75,000-lb load capacity, within 150 ft of exterior walls), fire hydrants within 1000 feet, grading plan, utility services, parking layout, storm drainage design and calculations (stamped by Idaho Registered Civil Engineer or Landscape Architect), geotechnical report, water/sewer tap sizes, flood plain indication
  • Architectural Site Plan (required in addition to civil site plan): structure locations/distances, IFC-regulated material storage areas, landscaping, exterior lighting, setbacks/easements, trash enclosure/mechanical screening, parking lot design per City Code Title 8 Chapter 9
  • Code/Plan Analysis using the application's example Code Analysis form, separately for each building
  • Com Check Energy Analysis prepared by an Idaho licensed architect or engineer
  • Foundation Plan, Floor Plan, Structural Plans, and Foundation/Structural/Shear Engineering Calculations, all stamped by an Idaho Registered Engineer or Architect (calculations required for all new construction and additions; cannot be a deferred submittal for metal buildings, stair drawings, or permanently fixed furniture)
  • Electrical Plans, Mechanical Plans & Ventilation Calculations, Plumbing Plans (with grease/sand interceptor sizing per Idaho State/Uniform Plumbing Code)
  • Additional Handicap Accessibility Information per current IBC and ANSI A117.1
  • Statement of special inspections per IBC 1704.1.1, with a final report submitted before start of work
  • Completed Wastewater Survey and Sewer Capacity Fee Worksheet
  • Health District letter of approval required prior to permit issuance for any building where food is prepared

Required documents

  • RequiredNew or Addition Commercial Building Permit ApplicationCity of Heyburn's own application form (2023), per heyburn.id.gov.
  • Required(New & Addition) Commercial/Non-Residential/Multi-Family Plan Review ChecklistDetailed civil site plan, architectural site plan, and building-systems checklist within the same application packet; design professional must check off that all requirements are provided on plans.
  • RequiredSewer Capacity Fee WorksheetFixture-count worksheet (lavatories, water closets, etc.) used to calculate sewer capacity fees; included in the application packet.
  • RequiredSample Plans Analysis FormTemplate listing occupancy class, construction type, occupant load, fire ratings, and exiting requirements to be reproduced on the applicant's own plans.

Fee schedule

Fee typeAmountNotes

Solar Photovoltaic (PV) Permit

Verified

Required for installation of rooftop or ground-mount solar photovoltaic systems within Heyburn city limits. Requires a City Building Permit (structural/racking, valuation-based on Project Value per the City's Residential Home Permit Application) plus a State of Idaho electrical permit (wiring/interconnection) issued by the Division of Occupational and Professional Licenses (DOPL) -- Heyburn's own Residential Home Permit Application states directly that 'Additional permits are required for electrical, plumbing and mechanical installations,' and electrical work in Heyburn is handled by the state, not the City. The state's Contractor Electrical Permit Worksheet has a dedicated checkbox and valuation-based fee formula for 'Solar, Renewable Energy, power generation, power production, or energy storage systems.'

Verified 2026-07-20 · Source

Requirements

  • City Residential Home Permit Application submitted to the Building Department for the structural/racking scope; fee is based on the applicant-certified Project Value (defined by the City as including overhead, profit, finish work, electrical, plumbing, and owner-supplied items)
  • Per the City's own application form: 'Additional permits are required for electrical, plumbing and mechanical installations' -- confirming the wiring/interconnection scope needs a separate permit
  • Electrical wiring/interconnection scope requires a State of Idaho DOPL Contractor Electrical Permit (or Homeowner Electrical Permit if self-installed), not a City permit
  • On the DOPL Electrical Permit Worksheet, check the 'Solar, Renewable Energy, power generation, power production, or energy storage systems' box under 'Other Installations including Commercial/Industrial/Solar/Renewable Energy' and enter the total cost of the electrical system
  • All City building permit applications and permits expire 180 days from date of receipt/issuance/last inspection, per the City's Residential Home Permit Application notice
  • Renewable energy installations require a plan check prior to final inspection, per the DOPL Electrical Permit Worksheet

Required documents

  • RequiredCity of Heyburn Residential Home Permit ApplicationFor the structural/racking scope, submitted to cdd@heyburncity.org or the online permitting portal
  • RequiredIdaho DOPL Contractor (or Homeowner) Electrical Permit ApplicationState application with an Electrical Permit Worksheet (Fee Schedule) that includes a dedicated Solar/Renewable Energy checkbox and valuation-based fee formula

Fee schedule

Fee typeAmountNotes
City Building Permit Fee (Project-Value-based)The City's Residential Home Permit Application states Project Value 'is used to calculate fees for the building permit' but the application form itself contains no printed dollar-figure fee table, consistent with this corpus's existing residential-building-permit entry for Heyburn, which documents this same unresolved gap. No dedicated solar/photovoltaic building fee line is published. Contact the Building Department at 208-679-8158 (option 2) for a current quote.
State DOPL Electrical Permit -- Solar/Renewable Energy, up to $10,000 system cost(total system cost x 0.02) + $60Idaho DOPL Contractor Electrical Permit Worksheet (Fee Schedule), Rev. 8/17/2022 -- a state fee, not collected by the City of Heyburn
State DOPL Electrical Permit -- Solar/Renewable Energy, $10,001-$100,000 system cost((system cost - $10,000) x 0.01) + $260Idaho DOPL Contractor Electrical Permit Worksheet, Rev. 8/17/2022
State DOPL Electrical Permit -- Solar/Renewable Energy, over $100,001 system cost((system cost - $100,000) x 0.005) + $1,160Idaho DOPL Contractor Electrical Permit Worksheet, Rev. 8/17/2022; renewable energy installations require a plan check prior to final inspection

EV Charger / EVSE Permit

Verified

Heyburn has no dedicated EV charger or EVSE permit and no distinct fee line item for electric vehicle charging equipment. Unlike solar/renewable-energy installations (which require both a City structural Building Permit and a State electrical permit), a standard EV charger is not a power-generation or energy-storage system and involves no structural/racking work, so it does not trigger the City's Residential Home Permit. The wiring/circuit work is billed as a standard electrical installation under the State of Idaho DOPL Contractor (or Homeowner) Electrical Permit, since Heyburn's own permit application states directly that 'Additional permits are required for electrical, plumbing and mechanical installations' and the City has no electrical-permit program of its own -- using the general 'Other Installations including Commercial/Industrial/Solar/Renewable Energy' valuation-based fee formula (the same formula used for solar, just without the Solar/Renewable Energy checkbox).

Verified 2026-07-20 · Source

Requirements

  • No City of Heyburn building permit is required for a standard wall-mounted or pedestal EV charger installation -- only electrical work is involved
  • Electrical permit issued by the State of Idaho Division of Occupational and Professional Licenses (DOPL), not the City -- Heyburn has no electrical-permit program of its own
  • On the DOPL worksheet, EV charger circuits fall under 'OTHER INSTALLATIONS including COMMERCIAL/INDUSTRIAL/SOLAR/RENEWABLE ENERGY' -- the worksheet states this category 'shall apply to any and all electrical installations not specifically mentioned elsewhere on this form,' and EV/EVSE circuits have no dedicated line item, so they fall under this catch-all
  • Do NOT check the 'Solar, Renewable Energy, power generation, power production, or energy storage systems' box on the DOPL worksheet for a straight EV charger install -- the fee formula is identical either way

Required documents

  • RequiredIdaho DOPL Contractor (or Homeowner) Electrical Permit ApplicationState application with the Electrical Permit Worksheet (Fee Schedule); EV charger circuit work is priced under the 'Other Installations' valuation-based formula

Fee schedule

Fee typeAmountNotes
State DOPL Electrical Permit -- Other Installations, up to $10,000 system cost(total cost of system x 0.02) + $60Idaho DOPL Contractor Electrical Permit Worksheet (Fee Schedule), Rev. 8/17/2022 -- same formula tier used for solar/renewable energy; no dedicated EV/EVSE line item exists on the state form. This is a state fee, not collected by the City of Heyburn.
State DOPL Electrical Permit -- Other Installations, $10,001-$100,000 system cost((total cost of system - $10,000) x 0.01) + $260Idaho DOPL Contractor Electrical Permit Worksheet, Rev. 8/17/2022

Sources & verification

Verified against official sources. Last reviewed 2026-07-04.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Heyburn building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-07-04)View current record →All versions →

Permalink: /idaho/minidoka-county/heyburn/as-of/2026-07-07/

Snapshot date: 2026-07-07

Commit: ba8b972

Reproducible from PermitBase’s version-controlled dataset, commit ba8b972.