Codes adopted
Permit types & fees
Residential Building Permit
VerifiedRequired for new single-family dwellings, duplexes, and townhouses, plus additions, remodels, decks, fences, retaining walls, and patio covers within the City of Rupert. Issued and reviewed by the Minidoka County Building Department under the 2018 IRC, since Rupert does not operate a separate city building office.
Verified 2026-07-19 · Source
Requirements
- New single-family dwelling, duplex, or townhouse construction (not more than 3 stories above grade plane) within Rupert city limits
- Additions, remodels, decks, fences, retaining walls, and patio covers also require this permit
- Compliance with the 2018 International Residential Code and city zoning setbacks (5' side/rear property lines; 20' from road right-of-way edge)
- Separate permits required for electrical, plumbing, and HVAC/mechanical work
Required documents
- RequiredResidential Application PacketMinidoka County Building Department's own application form plus general information sheet, per the Residential Building Permit Guide.
- RequiredTwo (2) sets of plans, minimum 11"x17", to scaleMust include a Site Plan, Foundation Plan, Floor Plan, Roof Framing Plan, Wall Section/Connections detail, and Elevations (front, back, both sides), per the Residential Plan Review Submittal Checklist.
- OptionalFloodplain elevation certificateRequired only for projects within Minidoka County's designated flood plain areas, from a certified engineer or surveyor, per the Residential Plan Review Submittal Checklist.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee (Project-Valuation-Based) | Calculated from Project Value using the Building Department's fee schedule; no dollar-per-valuation-bracket table was found published online | Per the Residential and Commercial Building Permit Guides: "Project Value is used to calculate fees for the building permit. Project Value is the total value of the construction work for which the permit is issued, including overhead and profit as well as finish work, painting, roofing, electrical, plumbing, heating/air conditioning, elevators, fire extinguishing systems, other permanent equipment, and owner supplied items. Project value excludes land." A dollar-figure valuation table was chased across minidoka.id.us/185/Building-Permits, minidoka.id.us/352/Residential, minidoka.id.us/179/Building-and-Zoning, the county's DocumentCenter, the iWorQ Online Web Portal (minidokacounty.portal.iworq.net), and site-wide search, and was not found published as of 2026-07-19. Contact the Building Department at (208) 436-7183 or Building@minidokacounty.id.gov for a project-specific fee quote. |
Commercial / Multi-Family Building Permit
VerifiedRequired for non-residential (office, retail, industrial, storage) and multi-family structures within the City of Rupert, including new construction, remodels/additions, and modular buildings. Issued and reviewed by the Minidoka County Building Department under the 2018 IBC.
Verified 2026-07-19 · Source
Requirements
- New construction, remodel/addition, or modular building for office/professional, retail/business, industrial, storage, or multi-family use within Rupert city limits
- Compliance with the 2018 IBC, 2018 IMC, 2018 IFC, 2018 IFGC, 2018 IEBC, and 2018 IECC
- Legal description of the property must accompany new construction applications
- MSDS sheets required for each chemical if the proposed occupancy stores or processes chemicals
- Fire District review/approval and (for food-preparation occupancies) South Central Health District approval required before permit issuance
Required documents
- RequiredCommercial Application PacketMinidoka County Building Department's own application, Code Analysis form, and Change of Occupancy Worksheet (if applicable), per the Commercial Building Permit Guide.
- RequiredTwo (2) sets of plans (min. 24"x36") to the Building Department, plus one (1) set to the applicable Fire JurisdictionMust include Site Plan, Foundation Plan, Floor Plan, Elevations (N/S/E/W), Building Sections/Details, Room and Finish Schedules, Structural Plans, and Conservation Elements, per the Commercial Plan Review Submittal Checklist.
- RequiredCivil Site Plan (2 sets) and Erosion/Sediment Control narrative (2 sets)Required for all parcels; scale 1:10 to 1:60, minimum sheet size 24"x36", per the Commercial Plan Review Submittal Checklist.
- OptionalMetal building or modular structural engineering designsRequired, stamped and signed by a licensed Idaho engineer, for all pre-fabricated metal/steel buildings and modular building foundations (unless classified/issued as temporary), per the Commercial Plan Review Submittal Checklist.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee (Project-Valuation-Based) | Calculated from Project Value using the Building Department's fee schedule; no dollar-per-valuation-bracket table was found published online | Per the Commercial Building Permit Guide: "Project Value is used to calculate fees for the building permit... including overhead and profit as well as finish work, painting, roofing, electrical, plumbing, heating/air conditioning, elevators, fire extinguishing systems, other permanent equipment, and owner supplied items. Project value excludes land." No published dollar-figure valuation table was located as of 2026-07-19 despite the same chase performed for the Residential Building Permit (county website, DocumentCenter, iWorQ portal, site search). Contact the Building Department at (208) 436-7183 for a project-specific fee quote. |
Solar PV Permit (Building Permit + State-Issued Electrical)
VerifiedRequired for installation of rooftop or ground-mounted solar photovoltaic systems within the City of Rupert. The structural/roof-mounting scope is processed as a Residential (or Commercial) Building Permit by the Minidoka County Building Department, the building/permitting authority for Rupert, under the 2018 IRC/IBC. The electrical-connection scope is NOT issued by Minidoka County — per the County's own 'Permitting With Other Agencies' page, plumbing and electrical applications, permits, and inspections are processed and completed by the State of Idaho (DOPL), not the county.
Verified 2026-07-19 · Source
Requirements
- Structural/roof-mounting scope: submit the standard Minidoka County Residential (or Commercial, for non-residential/multi-family) Application Packet, since no dedicated solar-specific application or checklist is published separately from the general Residential/Commercial Building Permit Guides
- Two (2) sets of plans, minimum 11"x17", to scale, including a Site Plan and structural/roof-mounting details sufficient for the Building Official to evaluate the roof's capacity to support the added photovoltaic load
- Compliance with the 2018 IRC (or 2018 IBC for commercial/multi-family) and city zoning setbacks (5' side/rear property lines; 20' from road right-of-way edge within Rupert city limits)
- Electrical-connection scope: apply directly to the State of Idaho Division of Occupational and Professional Licenses (DOPL) at dopl.idaho.gov — NOT through Minidoka County, per the County's own 'Permitting With Other Agencies' page stating plumbing and electrical permits/inspections are processed by the State of Idaho
- Electrical work must be performed by an Idaho-licensed electrical contractor whose electrician holds (or is supervised by someone holding) the Solar Photovoltaic limited electrical license category (NABCEP certification or equivalent required), per IDAPA 24.39.10.153.09
- Grid-tied renewable energy systems require a mandatory DOPL electrical plan review before the installation permit can be purchased
Required documents
- RequiredResidential (or Commercial) Application Packet (structural/roof-mounting scope)Minidoka County Building Department's standard application packet; no dedicated solar-specific packet is separately published, so the general Residential/Commercial packet and submittal checklist apply
- RequiredIdaho DOPL Electrical Permit Application (Alternative Energy / Solar PV)State of Idaho DOPL electrical permit application, applied for separately from the county's Building Department; covers the grid-tied or off-grid electrical connection scope
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Minidoka County Building Permit Fee (structural/roof-mounting scope, Project-Valuation-Based) | Calculated from Project Value using the Building Department's fee schedule; no dollar-per-valuation-bracket table was found published online | Same honest gap already documented for the Residential and Commercial Building Permit entries in this file — Minidoka County states fees are calculated from 'Project Value' but has not published the underlying rate table online (checked minidoka.id.us/185/Building-Permits, minidoka.id.us/352/Residential, the DocumentCenter, and the iWorQ portal). Contact the Building Department at (208) 436-7183 or Building@minidokacounty.id.gov for a project-specific fee quote. |
| Idaho DOPL Electrical Permit — 'Other Installation' fee schedule (applies to solar/renewable energy since no dedicated PV fee line is published) | Wiring cost up to $10,000: $60 plus 2% of total wiring cost; $10,000-$100,000: $260 plus 1% of the amount over $10,000; over $100,000: $1,160 plus 0.5% of the amount over $100,000 | Idaho Electrical Board Rules, IDAPA 24.39.10, Rule 500 (Permits and Inspections), current administrative rule text (adminrules.idaho.gov/rules/current/24/243910.pdf). Statewide fee schedule, since Minidoka County does not administer electrical permitting. |
| DOPL Electrical Plan Review (required for grid-tied renewable energy systems before permit purchase) | $65 minimum for one hour or less, plus $65 per additional hour | IDAPA 24.39.10, Rule 500 plan review fee |
EV Charger / EVSE Permit (State-Issued Electrical)
VerifiedInstalling a Level 2 (240V) or other electric vehicle charging station within the City of Rupert requires an electrical permit from the State of Idaho Division of Occupational and Professional Licenses (DOPL) — Minidoka County does not administer electrical permitting at all, per the county's own 'Permitting With Other Agencies' page (the same finding already documented for Rupert's solar-pv-permit entry in this file). Idaho's electrical fee schedule (IDAPA 24.39.10, Rule 500) has no EV-charger-specific line item; the installation is billed under the statewide 'Other Installation' wiring-cost-based fee, the same schedule used for any dedicated-circuit electrical alteration.
Verified 2026-07-20 · Source
Requirements
- Idaho DOPL Electrical Permit Application filed directly with the state — apply online at dopl.idaho.gov, not through Minidoka County, since the county's Building Department (which serves Rupert) handles only structural/building permits, not electrical
- Permit must be purchased before work commences; payment of the total permit fee is required prior to final inspection
- Electrical work must be performed by an Idaho-licensed electrical contractor, or by the homeowner on their own single-family residence where permitted under Idaho Electrical Board rules
- No structural/building permit is separately required from Minidoka County for a standalone EV charger circuit unless the install includes new construction (e.g., a new detached garage or carport to house the charger)
Required documents
- RequiredIdaho DOPL Electrical Permit ApplicationState of Idaho DOPL electrical permit application; no dedicated EV-charger/EVSE application exists, so the general electrical permit application covers a charger circuit installation
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Idaho DOPL Electrical Permit — 'Other Installation' fee schedule (applies to an EV charger circuit since no dedicated EVSE fee line is published) | Wiring cost up to $10,000: $60 plus 2% of total wiring cost; $10,000-$100,000: $260 plus 1% of the amount over $10,000; over $100,000: $1,160 plus 0.5% of the amount over $100,000 | Idaho Electrical Board Rules, IDAPA 24.39.10, Rule 500 (Permits and Inspections) — same statewide fee schedule already verified for Rupert's solar-pv-permit entry in this file; DOPL administers all electrical permitting statewide since Minidoka County does not. |
Manufactured Home Permit
VerifiedRequired for manufactured/mobile home, modular, and double-wide placement within the City of Rupert. Only Class A manufactured homes are permitted within city limits where single-family residences are allowed; Class B and C homes are restricted to unincorporated county areas and mobile home parks. Issued and reviewed by the Minidoka County Building Department.
Verified 2026-07-19 · Source
Requirements
- Manufactured, modular, double-wide, or other factory-built home placement within Rupert city limits
- Must qualify as a Class A manufactured home under the county's zoning-use table if placed on an individual residential lot within city limits (multisectional, minimum 20' wide, minimum 1,000 total sq ft, permanent foundation, constructed after June 15, 1976)
- Homes manufactured before June 15, 1976 that are being relocated must have a Mobile Home Compliance Rehabilitation Certificate from the Idaho Division of Building Safety before a permit application, per Idaho Code 44-2503
- Proof of ownership and proof that property taxes are current, per the Manufactured Home Permit Guide
- Separate electrical, plumbing, and HVAC permits required — excluded from the placement fee
Required documents
- RequiredManufactured Home Application PacketMinidoka County Building Department's own application, per the Manufactured Home Permit Guide.
- RequiredTwo (2) sets of plans, minimum 11"x17", to scaleSite Plan, Foundation/Blocking-and-Anchoring Plan, Floor Plan, Skirting Details, and Elevations, per the Manufactured Home Review Submittal Checklist.
- OptionalExterior photos of all sidesRequired for used/existing homes; not applicable to new homes, per the Manufactured Home Review Submittal Checklist.
- RequiredLegal documents showing ownership, make, model, and yearPer the Manufactured Home Review Submittal Checklist.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Single-wide section placement | $150 | Per Minidoka County's Manufactured Homes page (minidoka.id.us/183/Manufactured-Homes). |
| Multiple-section placement | $200 | Per Minidoka County's Manufactured Homes page (minidoka.id.us/183/Manufactured-Homes). |
| Concrete foundation | Additional cost, varies by home size — specific dollar figure not published | Minidoka County's Manufactured Homes page states a concrete foundation carries an additional cost that varies by home size, without publishing a specific dollar figure as of 2026-07-19. |
Sources & verification
Verified against official sources. Last reviewed 2026-07-19.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Rupert building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.