Skip to main content
PermitBase

This is PermitBase’s published record for Fruitland as of 2026-08-03. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.

Fruitland building permits

Verified

Fruitland, Idaho — as published 2026-08-03.

Verified 2026-07-07 · Source

Codes adopted

2018 International Building Code (IBC)2018 International Residential Code (IRC)2018 International Energy Conservation Code (IECC)2018 International Mechanical Code (IMC)2012 International Fuel Gas Code (IFGC)2015 International Fire Code (IFC)Current version of the Uniform Code for the Abatement of Dangerous BuildingsCurrent version of the Uniform Sign CodePlumbing and electrical permits/inspections are administered directly by the State of Idaho, not the City of Fruitland

Permit types & fees

Building Permit (New Construction, Additions, Remodels)

Verified

Required for new dwellings (single-family, townhouse, duplex), additions, remodels, and detached shop/storage buildings in Fruitland. Confirmed in the City's own 2025 Annual Building Report as the most frequently issued permit category (New Construction, Remodel, and Addition types tracked separately from the City's own 'Commercial' category — see the commercial-building-permit and commercial-tenant-improvement-permit entries for new commercial construction and commercial remodel/tenant-improvement work, which use a distinct Commercial Building Project Submittal Checklist).

Verified 2026-07-07 · Source

Requirements

  • New dwellings: two (2) sets of plans/specifications on a minimum 24 in. x 36 in. sheet, drawn to scale (minimum 1/20 for site plan), no markups — site plan, footing/foundation plan, floor plan, wall section, elevations (front/back/both sides), and a Manual J, Manual D, and Manual S compliance report
  • Additions/remodels/repairs: two (2) sets of plans/specifications — site plan showing existing and new structures with setbacks and dimensions, detailed materials list, detailed construction drawing, foundation elevations at top of foundation, north arrow
  • Idaho Code Chapter 22 of Title 55 requires excavators to call 811 or 1-800-342-1585 not less than 2 business days nor more than 10 business days before excavation begins
  • A separate City of Fruitland Mechanical Permit is required for HVAC installation; plumbing and electrical permits are obtained directly from the State of Idaho, not the City

Required documents

  • RequiredBuilding Permit ApplicationCity of Fruitland Building Department application (rev. 12/2022) — project address, owner, contractor (Idaho registration number and expiration required), architect/engineer, class of work, square footages, scope of work, and valuation
  • RequiredResidential Building Permit Submittal ChecklistLists required plan sheets for New Dwellings, Addition/Remodel/Repair, and Accessory Structures, plus the City's published Design Criteria and Codes Adopted
  • OptionalCommercial Building Project Submittal ChecklistParallel submittal checklist for commercial building projects
  • OptionalPlot Plan Example For Non-Habitable StructuresReference example for site/plot plan preparation

Fee schedule

Fee typeAmountNotes
Building Permit — total valuation $1.00–$500.00$23.50City of Fruitland Fee Schedule, adopted September 8, 2025 by Resolution No. 2025-08; valuation calculated using the February 2025 ICC Building Valuation Data
Building Permit — total valuation $501.00–$2,000.00$23.50 for the first $500.00, plus $3.05 for each additional $100.00 or fraction thereof, to and including $2,000.00
Building Permit — total valuation $2,001.00–$25,000.00$69.25 for the first $2,000.00, plus $14.00 for each additional $1,000.00 or fraction thereof, to and including $25,000.00
Building Permit — total valuation $25,001.00–$50,000.00$391.75 for the first $25,000.00, plus $10.10 for each additional $1,000.00 or fraction thereof, to and including $50,000.00
Building Permit — total valuation $50,001.00–$100,000.00$643.75 for the first $50,000.00, plus $7.00 for each additional $1,000.00 or fraction thereof, to and including $100,000.00
Building Permit — total valuation $100,001.00–$500,000.00$993.75 for the first $100,000.00, plus $5.60 for each additional $1,000.00 or fraction thereof, to and including $500,000.00
Building Permit — total valuation $500,001.00–$1,000,000.00$3,233.75 for the first $500,000.00, plus $4.75 for each additional $1,000.00 or fraction thereof, to and including $1,000,000.00
Building Permit — total valuation $1,000,001.00 and up$5,608.75 for the first $1,000,000.00, plus $3.65 for each additional $1,000.00 or fraction thereof
Plan Review$0.00City of Fruitland Fee Schedule effective September 8, 2025 — no plan review fee is charged
Fire and Life Safety Plan Review$0.00City of Fruitland Fee Schedule effective September 8, 2025; confirmed in City Code § 9-1-2(F) that no fee is charged for either type of commercial/industrial plan review
Re-Inspection$65.00City of Fruitland Fee Schedule effective September 8, 2025
Construction without a PermitAmount equal to twice the cost of the permit feeCity of Fruitland Fee Schedule effective September 8, 2025; codified as a civil penalty at City Code § 9-1-2(G), payable before a permit is issued

Commercial Building Permit (New Construction)

Verified

Required for new commercial and industrial construction in Fruitland. Uses the same City of Fruitland Building Permit Application (with the 'Commercial' checkbox in Class of Work) and the same valuation-based fee table as the residential-building-permit entry, but is tracked under its own 'Commercial' permit series (COM tracking numbers, e.g., COM2025-00001) in the City's own 2025 Annual Building Report — separate from the residential/general 'Building Permit' series (BLD numbers) — and requires the City's distinct Commercial Building Project Submittal Checklist plus a mandatory, but fee-free, construction and fire/life-safety plan review under City Code § 9-1-2(F).

Verified 2026-08-03 · Source

Requirements

  • Completed Building Permit Application with the 'Commercial' box checked under Class of Work
  • Three (3) copies of construction drawings and accompanying documents stamped by a registered design professional, each on a minimum 24 in. x 36 in. sheet drawn to scale — foundation plan, floor plan, exterior elevations, exterior wall envelope, means of egress, stair information, and code analysis (the building official may require additional documents prepared by a registered design professional)
  • Professional Services Contract with a $1,500.00 deposit, per the Commercial Building Project Submittal Checklist — corresponds to the City's Planning and Zoning Department 'Professional Contract Service Deposit' fee line, under which all City Engineer/Attorney review costs are billed to the applicant at cost (plus a $5.00 re-billing fee), per the FY2026 Fee Schedule
  • Two (2) copies of Schedule of Special Inspections (may be included on drawings), and two (2) copies of a Geotechnical Report if required
  • Site plan showing location of proposed and existing structures, fire hydrants, easements, distances to lot lines, north arrow, and established street/finished grades as applicable
  • As applicable to the project: ITD/Road District approval, fire protection system plans, ComCheck/2018 IECC energy code compliance documentation, drainage plan and calculations, landscape plan, parking and loading plan, structural drawings and calculations, and two (2) sets of specifications
  • No building permit for a commercial or industrial structure may be issued until the City conducts both a construction plan review and a separate fire/life-safety plan review (fire alarm systems, Fire Code compliance, fire sprinkler systems, overhead pressure tests, rough-in, fire suppression systems, hose connections, commercial hood fire systems, firewalls, etc.) — both reviews are required, but neither carries a fee, per City Code § 9-1-2(F)(1)-(2)
  • Applications for which no permit is issued within 180 days of the date of receipt expire, and submitted plans/data may be returned to the applicant or destroyed; the building official may grant one extension of up to 180 additional days on request showing circumstances beyond the applicant's control; any further extension requires City Council approval, and renewing an expired application requires resubmitting plans and paying a new plan review fee (City Code § 9-1-2(F)(3))
  • Idaho Code Chapter 22 of Title 55 requires excavators to call 811 or 1-800-342-1585 not less than 2 nor more than 10 business days before excavation begins

Required documents

  • RequiredBuilding Permit ApplicationSame City of Fruitland form used for all building permits (rev. 12/2022); 'Commercial' checkbox used under Class of Work
  • RequiredCommercial Building Project Submittal ChecklistCity of Fruitland Building Department checklist (rev. 05/2022) listing required commercial submittal items: stamped construction drawings, Professional Services Contract ($1,500 deposit), special inspections schedule, geotechnical report, site/drainage/landscape/parking plans, ComCheck energy compliance, and specifications

Fee schedule

Fee typeAmountNotes
Building Permit (valuation-based)Same valuation table as the general Building Permit — see residential-building-permit entry (e.g., $23.50 minimum up to $500 valuation)
City of Fruitland Fee Schedule, adopted September 8, 2025 (Resolution No. Show full citation

City of Fruitland Fee Schedule, adopted September 8, 2025 (Resolution No. 2025-08); no separate commercial valuation table exists — confirmed by direct inspection of the full published Fee Schedule PDF and cross-checked against real COM-series permit fees in the 2025 Annual Building Report (e.g., COM2025-00001: $600,000 valuation, $3,708.75 fee — matches the standard table exactly)

Plan Review (construction)$0.00City Code § 9-1-2(F)(1) — no fee for commercial/industrial construction plan review; confirmed on the FY2026 Fee Schedule
Fire and Life Safety Plan Review$0.00City Code § 9-1-2(F)(2); confirmed on the FY2026 Fee Schedule
Professional Contract Service Deposit$1,500.00 deposit; all City Engineer/Attorney review costs billed to the applicant at cost, plus a $5.00 re-billing fee
Listed as a required item ('Professional Services Contract - $1500 Deposit') on the Commercial Building Project Submittal Checklist; Show full citation

Listed as a required item ('Professional Services Contract - $1500 Deposit') on the Commercial Building Project Submittal Checklist; the underlying fee is published as 'Professional Contract Service Deposit' under the Planning and Zoning Department section of the FY2026 Fee Schedule

Commercial Tenant Improvement Permit (Remodel of Existing Commercial Space)

Verified

Fruitland does not issue a separate tenant improvement (TI) permit product. TI/remodel work in existing commercial space is filed as a 'Remodel' Type of Work under the same Commercial building permit (COM tracking series) as new commercial construction — using the same Building Permit Application ('Commercial' box checked, with the Remodel scope described), the same Commercial Building Project Submittal Checklist, and the same valuation-based fee table. Confirmed against a real 2025 permit record: COM2025-00004 (1800 N Whitley Drive, Stag Construction/Layton Anderson, issued 4/23/2025) is explicitly tagged Type of Use: Commercial, Type of Work: Remodel, Type of Permit: 'Tenant Improvements,' with a $100,000 valuation and a $993.75 fee that matches the standard valuation table exactly — proving 'Tenant Improvements' is a recognized internal tracking tag, not a distinct permit application or fee line. A second real record, COM2025-00002 (509 NW 16th Street, $20,000 valuation, Remodel, Type of Permit 'Commercial Building'), shows smaller commercial remodels are sometimes tagged 'Commercial Building' rather than 'Tenant Improvements,' reinforcing that these are internal labels on one underlying permit product, not separate permits.

Verified 2026-08-03 · Source

Requirements

  • Completed Building Permit Application with the 'Commercial' box checked under Class of Work and the 'Remodel' box checked, with a description of the scope of work
  • Same Commercial Building Project Submittal Checklist required for new commercial construction applies to remodel/TI scope: three (3) stamped sets of construction drawings (foundation plan, floor plan, exterior elevations, exterior wall envelope, means of egress, stair information, code analysis, as applicable to the scope), and a Professional Services Contract with a $1,500.00 deposit
  • Other checklist items marked 'if required' (Schedule of Special Inspections, Geotechnical Report, fire protection system, ITD/Road District approval, drainage/landscape/parking plans) are evaluated by the building official against the actual scope of the TI project
  • ComCheck/2018 IECC energy code compliance documentation
  • No permit for a commercial or industrial structure, including a remodel of one, may be issued until the City conducts both a construction plan review and a fire/life-safety plan review — both required, both fee-free, per City Code § 9-1-2(F)(1)-(2)
  • Applications for which no permit is issued within 180 days of the date of receipt expire, per City Code § 9-1-2(F)(3)

Required documents

  • RequiredBuilding Permit ApplicationSame City of Fruitland form used for all building permits (rev. 12/2022); 'Commercial' and 'Remodel' checkboxes used together for tenant improvement/remodel scope
  • RequiredCommercial Building Project Submittal ChecklistSame checklist used for new commercial construction (rev. 05/2022); the building official determines which 'if required' items apply to a given TI/remodel scope

Fee schedule

Fee typeAmountNotes
Building Permit (valuation-based)Same valuation table as the general Building Permit — see residential-building-permit entry (e.g., $993.75 for the first $100,000.00 of valuation)
City of Fruitland Fee Schedule, adopted September 8, 2025 (Resolution No. Show full citation

City of Fruitland Fee Schedule, adopted September 8, 2025 (Resolution No. 2025-08); no separate tenant-improvement or remodel-specific fee line exists — confirmed by direct inspection of the full published Fee Schedule PDF and cross-checked against the real COM2025-00004 permit ($100,000 valuation, $993.75 fee, Type of Permit 'Tenant Improvements')

Plan Review (construction)$0.00City Code § 9-1-2(F)(1)
Fire and Life Safety Plan Review$0.00City Code § 9-1-2(F)(2)
Professional Contract Service Deposit$1,500.00 deposit; all City Engineer/Attorney review costs billed to the applicant at cost, plus a $5.00 re-billing feeListed on the Commercial Building Project Submittal Checklist, which applies to commercial remodel/TI scope as well as new construction; underlying fee published under the Planning and Zoning Department section of the FY2026 Fee Schedule

Siting Permit (Accessory Structures)

Verified

Flat-fee permit for accessory structures such as sheds, portable canopies, portable automobile canopies, shelters, and storage containers, as identified on the City's own 'Building Permit Required When...' notice. Confirmed in the 2025 Annual Building Report, where shed permits (e.g., BLD2025-00001, BLD2025-00003) were issued at the exact $25.00 flat fee published on the Fee Schedule.

Verified 2026-07-07 · Source

Requirements

  • Applies to accessory structures: sheds, swimming pools, portable canopies, portable automobile canopies, shelters, and storage containers, per the City's News & Notices guidance on when a building/siting permit is required
  • Site plan showing location of existing and proposed structures, dimensions from structures to property lines, and dimensions between structures
  • Detailed list of materials to be used on the project
  • Detailed drawing of how the project will be constructed
  • North arrow indicated

Required documents

  • RequiredBuilding Permit ApplicationSame City of Fruitland form used for all building permits; 'Misc/Storage building' checkbox used for accessory structure scope

Fee schedule

Fee typeAmountNotes
Siting Permit$25.00City of Fruitland Fee Schedule, adopted September 8, 2025 (Resolution No. 2025-08); matches the exact fee charged on shed permits in the City's 2025 Annual Building Report (e.g., BLD2025-00001, BLD2025-00003, BLD2025-00019, BLD2025-00026)

Mechanical Permit

Verified

Required for HVAC and mechanical equipment installation, separate from the City's Building Permit and from the State of Idaho's electrical/plumbing permitting programs. Fee is based on new-construction living-area square footage, or a flat per-equipment fee for existing residences.

Verified 2026-07-07 · Source

Requirements

  • New single-family dwelling: fee based on living space square footage, including all buildings with HVAC being constructed on the property
  • New multifamily dwelling: contractors only
  • Existing residence/modular/manufactured/mobile home/detached shop: flat fee plus per-equipment charge, capped at the 'new' square footage fee
  • Commercial/industrial: fee based on total cost of the contracted mechanical system

Required documents

  • RequiredMechanical Permit ApplicationCity of Fruitland Building Department application

Fee schedule

Fee typeAmountNotes
New Single-Family Dwelling — up to 1,500 sq. ft.$130.00City of Fruitland Fee Schedule, adopted September 8, 2025 (Resolution No. 2025-08)
New Single-Family Dwelling — 1,501 to 2,500 sq. ft.$195.00
New Single-Family Dwelling — 2,501 to 3,500 sq. ft.$260.00
New Single-Family Dwelling — 3,501 to 4,500 sq. ft.$325.00
New Single-Family Dwelling — over 4,500 sq. ft.$325.00 plus $65.00 for each additional 1,000 sq. ft. or portion thereof
New Multifamily Dwelling — duplex apartment$260.00
New Multifamily Dwelling — 3 or more multifamily units$130.00 per building plus $65.00 per unit
Existing Residence/Modular/Manufactured or Mobile Home/Detached Shop$65.00 plus $10.00 per piece of HVAC equipment installed (fee shall not exceed the applicable 'new' square footage fee)
Commercial/Industrial — up to $10,000 contracted system costTotal cost of contracted system × 0.02, plus $60.00
Commercial/Industrial — $10,001 to $100,000 contracted system cost(Total cost of contracted system − $10,000) × 0.01, plus $260.00
Commercial/Industrial — over $100,001 contracted system cost(Total cost of contracted system − $100,000) × 0.005, plus $1,160.00
Technical Service$65.00 per hour
Plan Check$65.00 per hour
Requested Inspection — Gas Line$65.00
Fireplace/Solid Fuel Burning Appliance$65.00

Manufactured Home Installation Permit

Verified

Required for installing/blocking and tying down a manufactured, mobile, or modular home in Fruitland. Tracked as its own permit category ('Manufactured Home') in the City's 2025 Annual Building Report, with 'Block & Tie Down' as the recorded type of work.

Verified 2026-07-07 · Source

Requirements

  • Applies to manufactured, mobile, and modular home installations, including block-and-tie-down work
  • Confirmed as a distinct permit tracking category separate from the general Building Permit in the City's own permit records

Required documents

  • RequiredBuilding Permit ApplicationCity of Fruitland application, with class of work/scope describing the manufactured home installation

Fee schedule

Fee typeAmountNotes
Manufactured Home Installation$150.00City of Fruitland Fee Schedule, adopted September 8, 2025 (Resolution No. 2025-08); matches the exact fee charged on real Manufactured Home permits (e.g., MFH2025-00002 through MFH2025-00006) in the City's 2025 Annual Building Report

Residential Solar Photovoltaic (PV) Permit

Verified

Rooftop or ground-mount residential solar PV installation in Fruitland splits across two authorities, following the same building/electrical split used for all other trades in this file: the racking/mounting structural scope is billed as a City of Fruitland Building Permit (standard valuation table, since the City's Master Fee Schedule has no solar-specific line item), while the electrical/interconnection scope is a state-issued permit from the Idaho Division of Occupational and Professional Licenses (DOPL, formerly the Division of Building Safety) Electrical Bureau — Fruitland does not administer its own electrical permits. DOPL's own rules (IDAPA 24.39.10) direct that solar/renewable-energy installations not otherwise itemized be billed under the electrical fee schedule's 'Other Installation (Including Industrial and Commercial) Permit' category, and grid-connected systems require a separate Plan Check.

Verified 2026-07-20 · Source

Requirements

  • Racking/mounting structural scope: City of Fruitland Building Permit Application with site plan and structural details, reviewed against the 2018 IBC/IRC as adopted by the City
  • Electrical/interconnection scope: state electrical permit purchased through DOPL's online permit system, billed under the 'Other Installation' fee schedule (IDAPA 24.39.10, Section 0206) since no solar-specific line item exists
  • Grid-connected/tied systems require a separate Plan Check with DOPL, billed at $65 minimum for the first hour ($65 per additional hour or portion), per IDAPA 24.39.10, Section 0613
  • Installer must hold an Idaho electrical contractor license (Solar Photovoltaic DC Systems or Solar Photovoltaic micro-inverter/AC Systems classification, or a general electrical contractor license, per IDAPA 24.39.10 Section 09) — a licensed Idaho electrical contractor does not need an additional solar-specific license to perform solar installations
  • Idaho Code Chapter 22 of Title 55 requires calling 811 not less than 2 nor more than 10 business days before any excavation (relevant for ground-mount installations)

Required documents

  • RequiredCity of Fruitland Building Permit ApplicationSame City form used for all building permits; no separate solar-specific version exists. Used for the structural/racking scope.
  • RequiredState of Idaho Electrical Permit (DOPL)Purchased online through DOPL's electrical permit system, billed under the 'Other Installation' fee category since Idaho publishes no solar-specific electrical permit line item

Fee schedule

Fee typeAmountNotes
City Building Permit — structural/racking scope (valuation-based)Same valuation table as the general Building Permit — see residential-building-permit entry (e.g., $23.50 minimum up to $500 valuation)City of Fruitland Fee Schedule, adopted September 8, 2025 (Resolution No. 2025-08); no separate solar/PV line item exists — confirmed by direct keyword search of the full published Fee Schedule PDF.
State Electrical Permit — 'Other Installation' fee (wiring cost not exceeding $10,000)$60 plus 2% of total wiring costIDAPA 24.39.10, Section 0206.a — the Idaho electrical fee schedule's catch-all category that solar/renewable-energy installations are billed under, since no dedicated solar line item exists in the rule.
State Electrical Permit — 'Other Installation' fee (wiring cost $10,000-$100,000)$260 plus 1% of wiring cost in excess of $10,000IDAPA 24.39.10, Section 0206.b
State Plan Check Fee (grid-connected/tied systems)$65 minimum for the first hour; $65 for each additional hour or portion thereofIDAPA 24.39.10, Section 0613 — required for grid-connected renewable energy installations; homeowners performing their own grid-connected renewable energy work must also participate in and pay for this plan check.

EV Charger / EVSE Permit

Verified

Required for installation of a residential or commercial electric vehicle charging station (EVSE) in Fruitland. As with all electrical work in this jurisdiction (see solar-pv-permit and mechanical-permit entries), the City of Fruitland does not administer electrical permits at all — a standalone EVSE circuit is a state-issued permit from the Idaho Division of Occupational and Professional Licenses (DOPL) Electrical Bureau, billed under DOPL's 'Other Installation' catch-all fee schedule since no EV/solar-specific line item exists in the rule. No separate City of Fruitland permit is required for an EVSE circuit alone (unlike solar PV, which also has a City structural/racking permit component) unless the installation is bundled with new construction, an addition, or a panel/service scope the City otherwise regulates.

Verified 2026-07-20 · Source

Requirements

  • State electrical permit purchased through DOPL's online permit system, billed under the 'Other Installation' fee schedule (IDAPA 24.39.10, Section 0206) since no EV-charger-specific line item exists
  • Installer must hold a valid Idaho electrical contractor license (a general electrical contractor license is sufficient; no EV-specific license classification exists), per IDAPA 24.39.10 Section 09
  • Idaho Code Chapter 22 of Title 55 requires calling 811 not less than 2 nor more than 10 business days before any excavation, relevant if trenching is needed to reach a detached garage or carport charging location
  • If the EVSE installation is bundled with new construction, an addition, or requires a City-regulated panel/service scope, confirm with the City of Fruitland Building Department (208-452-4946) whether an additional City permit applies

Required documents

  • RequiredState of Idaho Electrical Permit (DOPL)Purchased online through DOPL's electrical permit system, billed under the 'Other Installation' fee category since Idaho publishes no EV-charger-specific electrical permit line item

Fee schedule

Fee typeAmountNotes
State Electrical Permit — 'Other Installation' fee (wiring cost not exceeding $10,000)$60 plus 2% of total wiring cost
IDAPA 24.39.10, Section 0206.a — the Idaho electrical fee schedule's catch-all category that an EVSE circuit is billed under, since no dedicated EV-charger line item exists in the rule. Show full citation

IDAPA 24.39.10, Section 0206.a — the Idaho electrical fee schedule's catch-all category that an EVSE circuit is billed under, since no dedicated EV-charger line item exists in the rule. Same category documented on this jurisdiction's solar-pv-permit entry for the electrical/interconnection scope of a solar installation.

State Electrical Permit — 'Other Installation' fee (wiring cost $10,000-$100,000)$260 plus 1% of wiring cost in excess of $10,000IDAPA 24.39.10, Section 0206.b — applies if the EVSE installation is bundled with a larger electrical scope (e.g., a significant panel/service upgrade).

Sign Permit

Verified

Required for permanent sign installation in Fruitland, administered under the adopted Uniform Sign Code. Fee is based on sign square footage plus an additional building-permit-style fee based on value; confirmed in the City's 2025 Annual Building Report tracking wall signs, monument signs, and projecting signs.

Verified 2026-07-07 · Source

Requirements

  • Applies to new sign installation (wall signs, monument signs, projecting signs, per real 2025 permit records)
  • Fee calculated per square foot of sign area, plus an additional building permit fee based on the sign's value
  • Administered under the City's adopted Uniform Sign Code

Required documents

  • RequiredSign Permit ApplicationCity of Fruitland Building Department application, prepared by the Zoning Administrator

Fee schedule

Fee typeAmountNotes
Sign Permit$0.50 per square foot of the sign, plus an additional building permit fee based on the valueCity of Fruitland Fee Schedule, adopted September 8, 2025 (Resolution No. 2025-08)

Temporary Occupancy Permit

Verified

Allows temporary occupancy of a structure before a final certificate of occupancy/completion is issued.

Verified 2026-07-07 · Source

Requirements

  • Application submitted to the City of Fruitland Building Department
  • Available as a standalone form on the Building Department's Applications/Forms page

Required documents

  • RequiredTemporary Occupancy ApplicationCity of Fruitland Building Department application

Fee schedule

Fee typeAmountNotes
Temporary Occupancy Permit$50.00City of Fruitland Fee Schedule, adopted September 8, 2025 (Resolution No. 2025-08)

Building Permit Extension

Verified

First and second 180-day extensions of an active building permit, codified at Fruitland City Code § 9-1-2. The first extension is issued without charge if any portion of the project is complete at expiration; a second extension may be issued if a substantial (25%+) portion of the work is complete.

Verified 2026-07-07 · Source

Requirements

  • First extension: issued without charge if any portion of the project is completed at the time the original 180-day permit expires
  • Second extension: issued only if, after expiration of the first extension, a substantial portion (25% or more of the projected project) of the work is completed
  • If the second extension also expires without completion, the project is deemed abandoned and the site must be restored to its original condition, unless the applicant obtains City Council approval after a hearing to continue

Required documents

  • RequiredBuilding Permit Extension ApplicationCity of Fruitland Building Department application

Fee schedule

Fee typeAmountNotes
First Extension$0.00 (no charge)Fruitland City Code § 9-1-2(C) — issued without charge if any portion of the project is complete at expiration

Sources & verification

Verified against official sources. Last reviewed 2026-07-07.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Fruitland building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-08-02)Later version (2026-08-13) →View current record →All versions →

Permalink: /idaho/payette-county/fruitland/as-of/2026-08-03/

Snapshot date: 2026-08-03

Commit: 265915f

Reproducible from PermitBase’s version-controlled dataset, commit 265915f.