New Residence in City Limits — McCall, Idaho · Requirements sheet
Verified 2026-07-07 · Source: https://www.mccall.id.us/231/Building-Permit-Application-Information
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
New Residence in City Limits in McCall, Idaho
Required for construction of a new single-family dwelling within McCall city limits. Covers structural construction, plan review, and coordination with Public Works for water/sewer connections.
Verified 2026-07-07 · Source
When you need this permit
- Applies to all new single-family dwellings within McCall city limits (a separate 'New Residence in Impact Area' process existed but the City stopped accepting Impact Area applications as of November 30, 2025)
- Structures greater than 3,500 square feet within city limits must include plans prepared by an Idaho-licensed architect (or an out-of-state architect with an Idaho practice agreement)
- Single-family residences exceeding 5,000 total square feet require Planning and Zoning Commission Design Review (minimum 45-day review period after a complete application, plus a pre-application conference and public hearing)
- Submit application, plans, and required forms through the online Permit Application Portal (app.govwell.com/mccall-id)
- A Public Works Permit application and Water Infrastructure Sizing Worksheet must be submitted for any project needing a City water/sewer connection
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 7 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Foundation/Footings
Before concrete pour — footing size, rebar, and ventilation verified against approved plans
- 2
Framing
Structural framing, wall bracing/shear walls, and roof framing verified
- 3
Final
All work complete per approved plans, ready for occupancy
See the full McCall inspection guide — scheduling & re-inspection fees →
Tips
- Both the old and new (GovWell) permit portals were temporarily active during 2026 transition; new applications should use the GovWell system at app.govwell.com/mccall-id.
- Invoices are emailed within 2-3 business days of application; plans are not reviewed until the Plan Review Fee is paid.
- Allow 4 business weeks for permit issuance overall; this can extend during the busy summer season or if submitted documentation is incomplete.
- Water connection fees (ERUs, meter size, meter purchase) are determined separately by the City Water Department after the Public Works Permit application is reviewed, and must be paid before permit issuance.
- The City stopped accepting 'New Residence in Impact Area' applications as of November 30, 2025 — impact-area residential applications should contact the Building Department directly for current process.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-07.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the McCall building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in McCall
Compare new residence in city limits fees across Idaho →
Look up this fee in a different city →