Roof Permit in McCall, Idaho

Required for reroofing and roof-related work in McCall. Governed by the Resolution 24-11 fee schedule (roof permit fee based on 50% of project valuation) and Ordinance 988 roof-covering and snow-country amendments.

Verified 2026-07-07 · Source

When you need this permit

  • Reroofing (tear-off or overlay) of any structure in the city
  • Roof covering must meet Class B or higher fire-retardant rating (Class A if wood shakes/shingles are used)
  • Self-adhering polymer-modified bitumen ice barrier underlayment required on the entire roof, unless prohibited by the manufacturer's installation instructions
  • Roof and attic vents must resist intrusion of flame and embers

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Roof Permit — building permit feeResolution 24-11 Comprehensive Fee Schedule, eff. July 25, 2024 — 'Roof Permit: Permit Fee Use 50% of the valuation of the project to calculate the permit fee'
Calculated using 50% of project valuation against the standard Building Permit fee table (Resolution 24-11): $23.50 (up to $500) through $5,608.75 + $3.65/$1,000 (over $1,000,000)
Plan Review FeeResolution 24-11
65% of the calculated Building Permit fee
Re-inspection
$85 per additional inspection

Review timeline

Plan reviewMcCall’s published plan-review target
2–2 business days

How long did your Roof Permit permit actually take in McCall?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Underlayment

    Ice barrier/underlayment installed and verified before roof covering is applied

  2. 2

    Final

    Completed roof covering verified for compliance with Class B/A fire rating and snow-country requirements

See the full McCall inspection guide — scheduling & re-inspection fees →

Tips

  • Invoices are typically issued within 48 hours after the roof permit application is submitted.
  • The application becomes null and void if not pursued in good faith within 180 days of the submittal date.
  • If the interior side setback is less than 10 feet and the roof slopes toward that property line, the roof must be designed to hold and/or shed snow to prevent accumulation on the adjoining property (MCC 3.3.041).
  • Schedule inspections with the Building Official at least 24-48 hours in advance by calling (208) 634-8648.

Frequently asked questions

McCall requires a roof permit for: Reroofing (tear-off or overlay) of any structure in the city; Roof covering must meet Class B or higher fire-retardant rating (Class A if wood shakes/shingles are used); Self-adhering polymer-modified bitumen ice barrier underlayment required on the entire roof, unless prohibited by the manufacturer's installation instructions; Roof and attic vents must resist intrusion of flame and embers. If your project isn't listed, confirm with City of McCall Building Department (Community & Economic Development) at (208) 634-7142 before starting work.

In McCall, the published Roof Permit — building permit fee is: Calculated using 50% of project valuation against the standard Building Permit fee table (Resolution 24-11): $23.50 (up to $500) through $5,608.75 + $3.65/$1,000 (over $1,000,000). Additional published fees: Plan Review Fee — 65% of the calculated Building Permit fee; Re-inspection — $85 per additional inspection. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

You will typically receive your invoice within 48 hours after submitting the Roof Permit application through the online portal.

You'll need: Roof Permit Application; Construction Plan Form. See the required-documents checklist on this page for details on each.

Two: an Underlayment inspection (before the roof covering goes on) and a Final inspection.

Apply through City of McCall Building Department (Community & Economic Development) at 216 East Park Street, McCall, ID 83638. Phone: (208) 634-7142, email: rsantiago-govier@mccall.id.us. Office hours: Mon–Fri, City Hall business hours (contact Permit Technician at (208) 634-7052 for scheduling). Official information: https://www.mccall.id.us/228/Building-Department.

McCall, Idaho has adopted: 2018 International Building Code (IBC); 2020 IRC — Idaho Residential Code (based on the 2018 IRC), Parts I, II, III, IX as amended, with Appendices A, B, C, D, and R (Tiny Homes); 2020 IECC — Idaho Energy Conservation Code (residential portion amended); 2018 International Existing Building Code (IEBC); 2017 National Electrical Code (NEC); 2017 Idaho State Plumbing Code (based on the 2015 Uniform Plumbing Code); 2018 International Mechanical Code (IMC); 2018 IRC Parts V (Mechanical) and VI (Fuel Gas); 2018 International Fuel Gas Code (IFGC); 2018 International Fire Code (IFC); 2009 ICC/ANSI A117.1 Accessible and Usable Buildings and Facilities; 2010 ADA Standards for Accessible Design; 1991 Uniform Code for Abatement of Dangerous Buildings; McCall City Code Title 2 (Building Regulations), Chapter 1 — Applicable Codes, as amended by Ordinance 988 (eff. 4/27/2020). Local amendments apply — see the McCall overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-07.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the McCall building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.