When you need this permit
- Complete roof replacement (tear-off and re-roof)
- Re-roofing overlay
- Replacement of siding or stucco on existing house
Required documents
- Req
Residential Reroof Permit Application
Nampa Building Department reroof application; available at cityofnampa.us/DocumentCenter/View/18246
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Residential Reroof — building permit (valuation-based) | Per Exhibit A valuation table; residential re-roofs typically fall in $22.20–$65.40 range for most projects | Nampa Exhibit A Schedule of Permit Fees (Dec 2021) |
| Plan Review Fee | 65% of the building permit fee | Assessed at intake |
| Reinspection (after first reinspection for same item) | $55.00 flat fee | — |
Review timeline
7–7 business days
Nampa’s published plan-review target
Inspection process
- 1
Final
Completed roof — verify flashing, drip edge, underlayment, and proper installation per approved plans
Tips
- Nampa's plan review target for residential re-roofs is 7 working days per the published Plan Review Processing Time Frames (Aug 2024).
- Nampa's design criteria: ground snow load 20 PSF, roof snow load not less than 25 PSF — roofing materials must be rated accordingly.
- Apply through the CSS online portal or in person for fastest processing.
Frequently asked questions
- Do I need a permit to replace my roof in Nampa?
- Yes. Nampa requires a permit for re-roofing (both overlays and full tear-off/re-roof). Apply through the CSS online portal at nampaid-energovpub.tylerhost.net or in person at 500 12th Ave S.
Sources & verification
Verified against official sources. Last reviewed 2026-06-29.
- Nampa Building Safety & Code Department — official building department
- Residential Reroof Permit Application
- Residential FAQ — When do I need a permit?
- Nampa Exhibit A — Schedule of Permit Fees (Dec 21, 2021)
- Plan Review Processing Time Frames (Aug 14, 2024)
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Nampa building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Nampa
Related guides
Get the AI compliance checklist
Upload your project scope, get a jurisdiction-specific checklist of everything you need. Coming soon.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.