Residential Addition / Remodel Permit in Nampa, Idaho
Required for additions, remodels, and structural alterations to existing one- and two-family dwellings in Nampa. Covers room additions, garage conversions, basement finishes, deck construction, and structural modifications.
Verified 2026-06-29 · Source
When you need this permit
- Finishing an attic, garage, or basement to create living space
- Adding a room, garage, carport, or attached structure
- Moving, removing, or adding walls
- Decks more than 12 inches above grade
- Retaining walls 4 feet or more in height (bottom of footing to top of wall), or 2-foot retaining walls with a slope/surcharge
- Build or enclose a patio cover, porch, or carport
- Replacement of windows or doors where the opening is structurally modified
Required documents
- Req
Residential Addition Building Permit Application & Checklist (Oct 2024)
Official Nampa addition permit application; available at cityofnampa.us/DocumentCenter/View/18792
- Opt
Residential Remodel Permit Application & Checklist (Oct 2024)
For remodel scope; available at cityofnampa.us/DocumentCenter/View/18793
- Req
Construction Drawings
Plans showing scope of work, dimensions, structural details, and connection to existing structure
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit — valuation-based per Exhibit A Table | $22.20 (≤$500); $22.20 + $2.88/$100 ($501–$2,000); $65.40 + $13.23/$1,000 ($2,001–$25,000); $369.69 + $9.55/$1,000 ($25,001–$50,000); etc. | Nampa Exhibit A Schedule of Permit Fees (Dec 2021) |
| Plan Review Fee | 65% of the building permit fee | Assessed at intake |
| Plumbing extras (additions/remodels) — fixtures | $36.00 base + $15.00 per fixture | Nampa Exhibit A — Miscellaneous Fees for Plumbing sub-trade permits |
| Electrical extras (additions/remodels) — each circuit extension | $36.00 base + $15.00 per circuit extension | Nampa Exhibit A — Miscellaneous Fees for Electrical sub-trade permits |
| Mechanical extras (additions/remodels) — equipment | $36.00 base + $15.00 per piece of mechanical equipment | Nampa Exhibit A — Miscellaneous Fees for Mechanical sub-trade permits |
| Reinspection (after first reinspection for same item) | $55.00 flat fee | — |
Review timeline
10–10 business days
Nampa’s published plan-review target
Inspection process
- 1
Framing / Structural
After framing complete, before walls covered — verify structure, connections, blocking, egress
- 2
MEP Rough-In
Electrical, plumbing, and mechanical rough-ins before wall cover — may require separate trade permits
- 3
Insulation
Insulation and vapor barrier before drywall (if conditioned space added)
- 4
Final
All work complete per approved plans; Certificate of Completion issued
Tips
- Nampa's plan review target for residential additions is 10 working days per the published Plan Review Processing Time Frames (Aug 2024).
- Decks more than 12 inches above grade require a permit. Decks 30 inches or more above adjacent grade require guardrails per the 2018 IRC.
- Retaining walls 4 feet or more in height (footing bottom to wall top) require a permit. A 2-foot retaining wall with a slope or surcharge also requires a permit and structural engineering.
- Interior finishes (painting, floor covering, cabinets, countertops) are generally exempt from permit requirements unless framing is exposed or plumbing is relocated.
- Low-voltage outdoor lighting does not require an electrical permit; 110-volt outdoor lighting does.
Frequently asked questions
- Does a deck require a permit in Nampa?
- Yes, if the deck is more than 12 inches above grade. Apply for a Residential Addition permit through the CSS online portal or in person at 500 12th Ave S.
- Do I need a permit to finish my basement in Nampa?
- Yes, if the project creates living space or involves framing, electrical, plumbing, or mechanical work. Interior work such as paint, flooring, cabinets, and countertops is generally exempt.
Sources & verification
Verified against official sources. Last reviewed 2026-06-29.
- Nampa Building Safety & Code Department — official building department
- Residential Addition Building Permit Application & Checklist (Oct 2024)
- Residential Remodel Permit Application & Checklist (Oct 2024)
- Residential FAQ | City of Nampa
- Nampa Exhibit A — Schedule of Permit Fees (Dec 21, 2021)
- Plan Review Processing Time Frames (Aug 14, 2024)
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Nampa building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Nampa
Get the AI compliance checklist
Upload your project scope, get a jurisdiction-specific checklist of everything you need. Coming soon.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.