Columbia Falls building inspections

Verified

Inspection sequence, scheduling, and re-inspection fees for building permits in Columbia Falls, Montana.

Verified 2026-07-03 · Source

How to schedule

Inspections are requested through the building department below.

Address
130 6th St West, Columbia Falls, MT 59912
Phone
(406) 892-4391
Office hours
City Hall, 130 6th St West, Columbia Falls, MT 59912. Building/Planning/Public Works Clerk: Caleb Sobczak, (406) 892-4432, sobczakc@cityofcolumbiafalls.com. All building, electrical, mechanical, and plumbing permit applications begin at City Hall by contacting the Building Clerk; actual building inspections are scheduled directly with the City of Whitefish Building Department, (406) 863-2410, buildingdept@cityofwhitefish.gov, under a contractual inspection-services agreement between the two cities. Source: City of Columbia Falls Building Inspection & Code Enforcement page, cityofcolumbiafalls.org/1204/Building-Inspection-Code-Enforcement

Published scheduling rules

  • All building inspections must be scheduled directly with the City of Whitefish Building Department at (406) 863-2410 or buildingdept@cityofwhitefish.gov, with a minimum of 24 hours' notice and the project address on hand — Columbia Falls does not perform its own inspections in-house despite being the certified/permitting jurisdiction. (Residential Building Permit (New Construction / Addition / Remodel / Repair))
  • Inspections are scheduled directly with the City of Whitefish Building Department, (406) 863-2410, with 24 hours' minimum notice. (Residential Addition / Remodel / Repair Permit)

Inspection sequence

Applies to: Residential Building Permit (New Construction / Addition / Remodel / Repair)

  1. 1

    Sonotubes/Piers/Columns

    String line or letter of survey required before pour

  2. 2

    Footings

    String line or letter of survey required before concrete pour

  3. 3

    Walls

    Foundation wall inspection

  4. 4

    Foundation Waterproofing / Underslab Heating / Underslab Plumbing

    Before backfill and slab pour

  5. 5

    Concrete Slab

    Slab inspection prior to pour completion

  6. 6

    Shear Wall Nailing

    Prior to covering shear panels

  7. 7

    Rough Framing

    Framing complete, prior to insulation/drywall

  8. 8

    Rough Electrical / Rough Mechanical / Rough Plumbing

    Trade rough-ins prior to insulation/drywall

  9. 9

    Insulation

    Insulation values verified against plan (exterior walls, foundation, crawl space, roof/ceiling)

  10. 10

    Drywall Nailing

    Prior to taping/finishing; townhome/duplex common-wall assemblies require additional fire-rated drywall inspections per the Required Inspections List

  11. 11

    Final Mechanical (meter tag) / Final Fire (fire suppression & alarm tests) / Final Electrical (commercial only) / Final Building Inspection

    Final inspections prior to occupancy

Applies to: Plumbing Permit

  1. 1

    Underslab Plumbing

    Before concrete pour — verify pipe slope, materials, and cleanouts; scheduled with the City of Whitefish Building Department

  2. 2

    Rough Plumbing

    After pipes installed, before walls closed

  3. 3

    Final Building Inspection

    All fixtures connected, no leaks, verified at final

Applies to: Residential Addition / Remodel / Repair Permit

  1. 1

    Footing/Foundation

    Required before concrete pour for addition footings, scheduled with the City of Whitefish Building Department

  2. 2

    Rough Framing / Rough Electrical / Rough Mechanical / Rough Plumbing

    Structural framing and trade rough-ins, connections to existing structure

  3. 3

    Final Building Inspection

    All work complete per approved plans

Applies to: Electrical Permit

  1. 1

    Rough Electrical

    Wiring, box placement, and service connections before walls are closed; scheduled with the City of Whitefish Building Department, minimum 24 hours' notice

  2. 2

    Final Electrical (commercial only per the Required Inspections List)

    Devices installed, panel labeled, protections verified per 2020 NEC

Applies to: Mechanical / HVAC Permit

  1. 1

    Rough Mechanical

    Ductwork and mechanical equipment rough-in before walls closed; scheduled with the City of Whitefish Building Department

  2. 2

    Final Mechanical (meter tag)

    Equipment operational, verified at final per the Required Inspections List

Applies to: Solar Photovoltaic (PV) Permit

  1. 1

    Rough Electrical

    Conduit runs, wire sizing, and disconnect placement before energizing; scheduled with the City of Whitefish Building Department

  2. 2

    Final Building Inspection

    Panel mounting, racking attachment, roof penetration sealing, electrical connections, and inverter verified

Columbia Falls building permits

Get alerts for Columbia Falls

We'll email you when Columbia Falls's fees, documents, or codes change — not often.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.