Helena building inspections
VerifiedInspection sequence, scheduling, and re-inspection fees for building permits in Helena, Montana.
Verified 2026-07-02 · Source
How to schedule
Inspections are requested through the building department below.
- Address
- 316 N. Park Avenue, Room 435, Helena, MT 59623
- Phone
- (406) 447-8438
- Office hours
- City County Building, 316 N Park Ave, Helena, MT 59623; applications and permits also processed online via Civic Access (helenamt.gov/business/civic-access/)
- Website
- Official site
Inspection sequence
Applies to: Accessory Dwelling Unit (ADU) Permit
- 1
Foundation
Before concrete pour
- 2
Framing
After framing complete, before insulation or wall cover
- 3
MEP Rough-In
Electrical, plumbing, mechanical rough-in before walls closed (separate trade permits required)
- 4
Final
Approved final inspection required before occupancy
- 1
Foundation / Footing
Before concrete pour; may be scheduled under a separate Foundation Permit ahead of the full building permit
- 2
Framing
After framing complete, before insulation or wall cover; verifies fire-resistive construction assemblies identified on the building code analysis sheet
- 3
Mechanical / Plumbing / Electrical Rough-In
Rough-in of HVAC, plumbing, and electrical systems before walls closed
- 4
Final
Required approved final inspection prior to Certificate of Occupancy and occupying the structure
Applies to: Residential Building Permit (One- and Two-Family Dwelling — New Construction)
- 1
Foundation / Footings
Before concrete pour; footings minimum 42 inches below grade or otherwise frost-protected
- 2
Framing
After framing complete, before insulation or wall cover; verifies wall bracing per 105 mph wind speed and Seismic Design Category D0
- 3
Insulation / Energy
Insulation and IECC Climate Zone 6 compliance before drywall
- 4
Final
Required approved final inspection prior to moving in and occupying the dwelling
Applies to: Plumbing Permit
- 1
Underground / Under-slab
Before concrete pour — pipe slope, materials, cleanouts
- 2
Rough-In
After pipes installed, before walls closed
- 3
Final
All fixtures connected, no leaks, proper venting verified
Applies to: Residential Addition / Remodel / Alteration Permit
- 1
Foundation (if new footings)
Before concrete pour, if the addition includes new foundation work
- 2
Framing
After framing complete, before insulation or wall cover
- 3
Final
Approved final inspection required before occupying the addition
Applies to: Deck Permit
- 1
Footing
Before concrete pour, for post/pier footings
- 2
Framing / Final
Ledger connection (if any), joist framing, railing, and stair compliance
Applies to: Electrical Permit
- 1
Rough-In
Wiring and conduit installed before walls closed
- 2
Final
All devices installed, panel labeled, system energized
Applies to: EV Charger / EVSE Permit
- 1
Rough-In
Wiring and conduit installed before walls closed, where applicable
- 2
Final
Charger circuit, disconnect, and breaker protections verified per 2020 NEC before energizing
Applies to: Fire Sprinkler & Fire Alarm System Permit
- 1
Rough-In / Underground
Underground supply piping, riser location, and rough sprinkler/alarm device placement verified before concealment; underground runs beyond roughly 10 feet under the slab require special precautions or relocation per NFPA 13 Section 10.6
- 2
Final Inspection and Testing
Functional testing of the completed fire sprinkler or fire alarm system; upon completion, as-built plans must be placed at the fire alarm control panel or sprinkler riser room for emergency personnel and future inspections
Applies to: Mechanical / HVAC Permit
- 1
Rough-In / Equipment
Equipment installation and ductwork before walls closed
- 2
Final
Equipment operational, combustion air and venting verified
Applies to: Solar Photovoltaic (PV) Permit
- 1
Rough Electrical
Conduit runs, wire sizing, and disconnect placement verified before energizing
- 2
Final Inspection
Racking/roof-penetration attachment, electrical connections, and interconnection point verified
Final inspection only: Change of Occupancy Permit, Roofing Permit (Reroof)
Re-inspection fees
Building permit fee for occupancy change (Change of Occupancy Permit) · City of Helena 2020 Book of Fees (Exhibit A, Community Development Fees — Building Division), line item 'Building permit fee… Show full citationHide
Building permit fee for occupancy change (Change of Occupancy Permit) · City of Helena 2020 Book of Fees (Exhibit A, Community Development Fees — Building Division), line item 'Building permit fee for occupancy change,' described as 'Permit for change of occupancy'; reconstructed from the PDF's column layout (Fee Amount: 'whichever is greater'; Fee Basis: 'Per hour Includes supervision, overhead, equipment, hourly wages'; Minimum: $56.00) — the same $56.00/hour minimum figure independently appears for several other hourly-billed Building Division review categories in the same table (e.g., re-inspection, additional plan review), which corroborates this reading, but no Maximum cap is listed for this specific line item in the source documentSources & verification
Verified against official sources. Last reviewed 2026-07-02.
Applications & forms
Codes & ordinances
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Helena building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Helena building permits
Get alerts for Helena
We'll email you when Helena's fees, documents, or codes change — not often.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.