How to schedule
Inspections are requested through the building department below.
- Address
- 1105 3rd St NW, Sidney, MT 59270
- Phone
- 406.433.1122
- Office hours
- Not published on the City of Sidney Fire Marshal / Building Inspector pages; call 406.433.1122 or email buildingofficial@cityofsidneymt.com. Fax: 406.433.7509.
- Website
- Official site
Published scheduling rules
- A plumbing inspection must be requested and conducted before any plumbing work is covered (Plumbing Permit)
Inspection sequence
Applies to: Fire Sprinkler / Fire Alarm Permit
- 1
Fire Suppression System Inspection
Conducted as part of the Building Permit inspection process for any building with an automatic fire suppression system; engineer-prepared drawings/specifications are reviewed before installation
- 2
Fire Alarm Electrical Rough-In
Must be requested with 48 hours' notice before covering up wiring, per this file's electrical-permit entry
- 3
Fire Alarm Electrical Final
All devices installed, system energized; requires 48 hours' notice
Applies to: Mechanical / HVAC Permit
- 1
Gas Piping Pressure Test
Required before concealing gas piping; 48 hours' notice required
- 2
Rough-In
Ductwork and mechanical equipment rough-in before walls closed
- 3
Final
Equipment operational, combustion air and venting verified
Applies to: Solar Photovoltaic (PV) Permit
- 1
City Building Inspection
Structural/roof-mount or ground-mount foundation compliance
- 2
State Electrical Rough-In
Must be requested with 48 hours' notice before covering up work
- 3
State Electrical Final
All devices installed, system energized; requires 48 hours' notice
Applies to: Electrical Permit
- 1
Rough-In
Must be requested with 48 hours' notice before covering up work
- 2
Final
All devices installed, panel labeled, system energized; requires 48 hours' notice
Applies to: EV Charger / EVSE Permit
- 1
Rough-In
Must be requested with 48 hours' notice before covering up work, if applicable
- 2
Final
Charger mounted, connections verified, panel labeled, system energized; requires 48 hours' notice
Applies to: Plumbing Permit
- 1
Rough-In
Must be requested and conducted before covering any portion of plumbing work
- 2
Final
All fixtures connected, no leaks, proper venting verified
Sources & verification
Verified against official sources. Last reviewed 2026-07-04.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Sidney building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Sidney building permits
Get alerts for Sidney
We'll email you when Sidney's fees, documents, or codes change — not often.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.