Required for installing an electric vehicle charging station (Level 2 or DC fast charger) within Sidney city limits. Because Sidney is not electrical-certified, the electrical installation is a State of Montana Electrical Permit, issued directly by the Montana DLI Building Codes Bureau (Sidney's own line on the DLI certified-jurisdiction roster shows 'B' only, no 'E'), not a City permit. The Building Codes Bureau's BCP-1 fee schedule has no dedicated EV-charger/EVSE line item; a dedicated EV charger circuit is billed under the same 'Interior/Exterior Wire or Rewire' per-circuit fee tiers documented in this file's electrical-permit entry (the closest matching category for adding one or more new circuits/pieces of equipment to an existing service), or under the applicable panel/service-upgrade tier if the installation requires a service change.

Verified 2026-07-20 · Source

When you need this permit

  • State of Montana Electrical Permit required for the EV charger's dedicated circuit and any panel/service work — issued by the DLI Building Codes Bureau in Helena, not the City of Sidney
  • Work must be performed by a Montana-licensed electrical contractor (Residential or Commercial Electrical Permit) OR by the homeowner personally on their own owner-occupied home under a Homeowner Electrical Permit Owner-builder
  • No dedicated 'EV Charger'/'EVSE' checkbox exists on the BCP-1 Application for Residential/Commercial Electrical Permit; a single new dedicated circuit for a Level 2 charger is entered under the 'Interior/Exterior Wire or Rewire' per-circuit fee category
  • If the EV charger installation requires a new or upgraded electrical service/panel, that scope is billed under the same electrical permit's amperage-tiered service-change fee lines documented in this file's electrical-permit entry
  • A separate City of Sidney Building Permit would only apply if the EV charger installation includes new structural work (e.g., a new carport/accessory building) — a standalone circuit to an existing structure would not trigger the City's building-permit process
  • Apply online at https://aca-prod.accela.com/bcb/ or mail the paper BCP-1 application with payment to: Department of Labor & Industry, Building Codes Bureau, PO Box 200517, Helena, MT 59620-0517

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Interior/Exterior Wire or Rewire — 1 additional circuit or piece of equipmentBCP-1 (Rev. 11/25) — the closest documented fee category for a single new dedicated EV charger circuit added to an existing service, since no dedicated EV-charger fee line exists on the state's schedule
$45
Interior/Exterior Wire or Rewire — 2-3 additional circuits or pieces of equipmentBCP-1 (Rev. 11/25) — applicable if the EV charger installation includes additional circuits/equipment beyond the charger itself
$70
Residential Change of Service — exterior meter base, interior/exterior main disconnect onlyBCP-1 (Rev. 11/25) — applicable only if a service change is needed to support the charger's load
$45
Requested Inspection, per hourBCP-1 (Rev. 11/25)
$60 (plus $30 for each additional 30 minutes or fraction thereof beyond one hour, plus travel time)

Review timeline

Plan reviewTypical estimate — confirm current times with the Sidney building department
~0–0 business days

How long did your EV Charger / EVSE Permit permit actually take in Sidney?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough-In

    Must be requested with 48 hours' notice before covering up work, if applicable

  2. 2

    Final

    Charger mounted, connections verified, panel labeled, system energized; requires 48 hours' notice

See the full Sidney inspection guide — scheduling & re-inspection fees →

Tips

  • Sidney is NOT on Montana's certified-jurisdiction list for electrical — an EV charger's electrical permit there is a STATE permit issued by the Building Codes Bureau in Helena, not by the City.
  • There is no dedicated EV-charger fee line on the BCP-1 schedule; expect the charge to be computed under the same per-circuit 'Interior/Exterior Wire or Rewire' tiers used for any new circuit — $45 for one additional circuit/piece of equipment, $70 for 2-3.
  • A homeowner may wire their own EV charger circuit at their owner-occupied home under a Homeowner Electrical Permit; all other work requires a Montana-licensed electrical contractor. Owner-builder
  • A City of Sidney Building Permit is only needed if the EV charger installation includes new structural work (e.g., a carport) — a standalone circuit to an existing garage or driveway would not trigger the City's separate building-permit process.

Frequently asked questions

Sidney requires an ev charger / evse permit for: State of Montana Electrical Permit required for the EV charger's dedicated circuit and any panel/service work — issued by the DLI Building Codes Bureau in Helena, not the City of Sidney; Work must be performed by a Montana-licensed electrical contractor (Residential or Commercial Electrical Permit) OR by the homeowner personally on their own owner-occupied home under a Homeowner Electrical Permit; No dedicated 'EV Charger'/'EVSE' checkbox exists on the BCP-1 Application for Residential/Commercial Electrical Permit; a single new dedicated circuit for a Level 2 charger is entered under the 'Interior/Exterior Wire or Rewire' per-circuit fee category; If the EV charger installation requires a new or upgraded electrical service/panel, that scope is billed under the same electrical permit's amperage-tiered service-change fee lines documented in this file's electrical-permit entry; A separate City of Sidney Building Permit would only apply if the EV charger installation includes new structural work (e.g., a new carport/accessory building) — a standalone circuit to an existing structure would not trigger the City's building-permit process; Apply online at https://aca-prod.accela.com/bcb/ or mail the paper BCP-1 application with payment to: Department of Labor & Industry, Building Codes Bureau, PO Box 200517, Helena, MT 59620-0517. If your project isn't listed, confirm with City of Sidney Fire Marshal / Building Inspector — Kale Rasmussen; city-certified for Building (B), ALL project types (residential and commercial), within Sidney city limits ONLY. Electrical and Plumbing permits of ANY project type within Sidney city limits are issued directly by the Montana Department of Labor & Industry Building Codes Bureau (Sidney holds no state certification in those trades), as is Mechanical/HVAC. at 406.433.1122 before starting work.

No. The Building Codes Bureau's BCP-1 fee schedule has no dedicated EV-charger/EVSE line item. A single new EV charger circuit is billed under the 'Interior/Exterior Wire or Rewire — 1 additional circuit or piece of equipment' fee ($45), or the applicable service-change tier if a panel/service upgrade is also needed.

Plan review for an ev charger / evse permit in Sidney typically runs 0–0 business days. This is an estimate, not a published figure — confirm current review times with City of Sidney Fire Marshal / Building Inspector — Kale Rasmussen; city-certified for Building (B), ALL project types (residential and commercial), within Sidney city limits ONLY. Electrical and Plumbing permits of ANY project type within Sidney city limits are issued directly by the Montana Department of Labor & Industry Building Codes Bureau (Sidney holds no state certification in those trades), as is Mechanical/HVAC. at 406.433.1122.

You'll need: Application for Residential Electrical Permit. Depending on your project, Sidney may also ask for: Application for Homeowner Electrical Permit. See the required-documents checklist on this page for details on each.

Sidney requires 2 inspection(s) for an ev charger / evse permit, in order: Rough-In, Final. Schedule each through City of Sidney Fire Marshal / Building Inspector — Kale Rasmussen; city-certified for Building (B), ALL project types (residential and commercial), within Sidney city limits ONLY. Electrical and Plumbing permits of ANY project type within Sidney city limits are issued directly by the Montana Department of Labor & Industry Building Codes Bureau (Sidney holds no state certification in those trades), as is Mechanical/HVAC. (406.433.1122).

Apply through City of Sidney Fire Marshal / Building Inspector — Kale Rasmussen; city-certified for Building (B), ALL project types (residential and commercial), within Sidney city limits ONLY. Electrical and Plumbing permits of ANY project type within Sidney city limits are issued directly by the Montana Department of Labor & Industry Building Codes Bureau (Sidney holds no state certification in those trades), as is Mechanical/HVAC. at 1105 3rd St NW, Sidney, MT 59270. Phone: 406.433.1122, email: buildingofficial@cityofsidneymt.com; firemarshal@cityofsidneymt.com. Office hours: Not published on the City of Sidney Fire Marshal / Building Inspector pages; call 406.433.1122 or email buildingofficial@cityofsidneymt.com. Fax: 406.433.7509.. Official information: https://cityofsidneymt.com/fire-building.

Sidney, Montana has adopted: Montana has a mandatory statewide building code administered by the Montana Department of Labor & Industry (DLI) Building Codes Bureau, amended by the Administrative Rules of Montana (ARM) Title 24, Chapter 301. Cities, counties, and towns may become 'certified' to locally administer permitting and inspection for all or part of the code; non-certified trades fall under direct state administration by the DLI Building Codes Bureau. Source: Montana DLI Building Codes Bureau, Certified City, County and Town Programs (bsd.dli.mt.gov/building-codes-permits).; Sidney is a Montana DLI-certified jurisdiction for Building (B), ALL project types, within CITY LIMITS ONLY; certified official on file with DLI: Kale Rasmussen, 480-9113 (city phone format as printed in the roster; the City of Sidney's own published number for the same official is 406.433.1122). Verified directly by fetching and text-extracting the DLI Building Codes Bureau's 'MONTANA CERTIFIED LOCAL GOVERNMENT PROGRAM' roster PDF (updated 04/22/2026): the roster carries TWO SEPARATE line items — 'Richland County | B | Kale Rasmussen | 480-9113 | County except Sidney' and 'Sidney | B | Kale Rasmussen | 480-9113 | City Limits'. This confirms Sidney's own certification is a DISTINCT, SEPARATE entry from Richland County's countywide program, not a subset or duplicate listing — the same certified official (Kale Rasmussen, who is also Richland County's building inspector per richland.org/building.html) administers both programs, but the County's own certification explicitly EXCLUDES Sidney ('County except Sidney'), and Sidney has its own independent 'City Limits' certification. Source: https://bsd.dli.mt.gov/_docs/building-codes-permits/certified-city.pdf; Unlike several Montana B-only-certified cities (e.g., Hardin, Anaconda-Deer Lodge, Colstrip) whose certification is explicitly 'B (residential only)', Sidney's DLI roster entry lists plainly 'B' with no residential-only qualifier — matching the pattern of Choteau/Conrad/Cutbank/Glasgow/Lewistown/Red Lodge, i.e. Sidney's local Building certification covers BOTH residential and commercial building permitting within city limits. Corroborated directly by the City's own published forms: cityofsidneymt.com/fire-building/page/building-permit-applications lists both a 'Residential Building Permit Application' and a two-part 'Commercial Building Permit Application' as separate City-issued forms, each captioned 'WITHIN THE CITY LIMITS OF THE CITY OF SIDNEY.' Source: DLI roster PDF; https://cityofsidneymt.com/fire-building/page/building-permit-applications; Electrical and Mechanical/HVAC permitting are NOT locally certified in Sidney — the DLI roster's Sidney line lists only 'B' (no 'E' or 'M' code), meaning Electrical and Mechanical permits of any project type within Sidney city limits route DIRECTLY to the Montana DLI Building Codes Bureau for state administration, exactly as in a non-certified jurisdiction. Plumbing is likewise not covered by Sidney's own DLI code letter, and is independently confirmed as state-administered by the City's own Residential and Commercial Building Permit Application forms, both of which include a checklist item 'State Plumber Permit (required)' and 'State Electrical Permit (required)' under the Contractor section — direct documentary evidence, from the City's own application forms, that plumbing and electrical permits for construction within Sidney are STATE permits, not city-issued. Source: DLI roster PDF; City of Sidney Residential Building Permit Application PDF; Commercial Building Permit Application PDF; Per the Montana DLI Building Codes Bureau's Current Codes page (statewide effective date June 11, 2022, applicable uniformly to all certified and state-enforced jurisdictions): 2021 IBC, 2021 IRC, 2021 IEBC, 2021 IMC, 2021 IFGC, 2021 IECC, 2021 ISPSC, 2021 UPC, 2020 NEC, 2017 ICC A117.1 Accessibility. Source: bsd.dli.mt.gov/building-codes-permits/current-codes. Local amendments apply — see the Sidney overview page for the full list.

No. Electrical permits in Sidney, including for EV charger/EVSE installations, are State Electrical Permits issued by the Montana DLI Building Codes Bureau in Helena, not the City — Sidney's own line on the DLI certified-jurisdiction roster shows 'B' (Building) only, no 'E' (Electrical).