EV Charger / EVSE Installation Permit — Belgrade, Montana · Requirements sheet
Verified 2026-07-20 · Source: https://www.belgrademt.gov/490/Master-Fee-Schedule
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
EV Charger / EVSE Installation Permit in Belgrade, Montana
Belgrade has no separate EV charger/EVSE permit category. A dedicated circuit for a home Level 2 EV charger is billed under the City of Belgrade Master Fee Schedule's existing Electrical Permit line items for added circuits or change of service, issued directly by the City of Belgrade Building Department (Belgrade is a Montana DLI-certified local jurisdiction for electrical permitting).
Verified 2026-07-20 · Source
When you need this permit
- Electrical permit required for installing a new dedicated circuit, receptacle, or hardwired connection for an EV charger — governed by the 2020 NEC as adopted by the City of Belgrade
- No distinct 'EV charger' or 'EVSE' line item appears on the City's published Master Fee Schedule; the applicable line item is the general Single Family Interior/Exterior Wire or Rewire fee category based on the number of circuits/equipment added, or the Residential Change of Service fee category if the electrical service/panel must be upsized to support the charger
- Apply through the Cityworks Portal (cityworks.belgrademt.gov/publicaccess/login)
- If a new accessory structure (e.g., detached garage/carport) houses the charger, the Private Property Accessory Building electrical fee category applies instead of the wire/rewire category
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough-In / Electrical Final
Same inspection sequence as any electrical permit: wiring/box placement before walls closed, then final device/panel verification per 2020 NEC
See the full Belgrade inspection guide — scheduling & re-inspection fees →
Tips
- Belgrade does not publish a distinct EV charger/EVSE fee line — apply for a standard electrical permit through the Cityworks Portal and select the wire/rewire or change-of-service category matching your project scope.
- The Master Fee Schedule's 'Alternate Energy Source' add-on ($65) is listed for solar/wind generation equipment; it was not found to explicitly cover EV charging equipment, so it should not automatically be assumed to apply — confirm with the Building Department at (406) 388-3560 if in doubt.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Belgrade building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Belgrade
EV Charger / EVSE Installation Permit in other cities
Compare ev charger / evse installation permit fees across Montana →
Look up this fee in a different city →