EV Charger / EVSE Installation Permit in Belgrade, Montana

Belgrade has no separate EV charger/EVSE permit category. A dedicated circuit for a home Level 2 EV charger is billed under the City of Belgrade Master Fee Schedule's existing Electrical Permit line items for added circuits or change of service, issued directly by the City of Belgrade Building Department (Belgrade is a Montana DLI-certified local jurisdiction for electrical permitting).

Verified 2026-07-20 · Source

When you need this permit

  • Electrical permit required for installing a new dedicated circuit, receptacle, or hardwired connection for an EV charger — governed by the 2020 NEC as adopted by the City of Belgrade
  • No distinct 'EV charger' or 'EVSE' line item appears on the City's published Master Fee Schedule; the applicable line item is the general Single Family Interior/Exterior Wire or Rewire fee category based on the number of circuits/equipment added, or the Residential Change of Service fee category if the electrical service/panel must be upsized to support the charger
  • Apply through the Cityworks Portal (cityworks.belgrademt.gov/publicaccess/login)
  • If a new accessory structure (e.g., detached garage/carport) houses the charger, the Private Property Accessory Building electrical fee category applies instead of the wire/rewire category

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Single Family Interior/Exterior Wire or Rewire — 1 additional circuit or piece of equipment (typical for a dedicated EV charger circuit added to an existing panel with capacity)City of Belgrade Master Fee Schedule, Electrical Permits table — general fee category, not EV-specific; applies to any single additional circuit or equipment hookup
$45
Residential Change of Service — disconnect with feeder and distribution panel board (applies if panel upgrade is needed to support EV charger load)City of Belgrade Master Fee Schedule, Electrical Permits table
$75
Alternate Energy Source (solar, wind, etc.) add-onCity of Belgrade Master Fee Schedule, Electrical Permits table — included for reference only; EV chargers are not explicitly listed under this 'alternate energy source' category, which appears to target on-site generation (solar/wind) rather than vehicle charging load
$65, added to the base fee above

Review timeline

Plan review
Not published — contact the department

How long did your EV Charger / EVSE Installation Permit permit actually take in Belgrade?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough-In / Electrical Final

    Same inspection sequence as any electrical permit: wiring/box placement before walls closed, then final device/panel verification per 2020 NEC

See the full Belgrade inspection guide — scheduling & re-inspection fees →

Tips

  • Belgrade does not publish a distinct EV charger/EVSE fee line — apply for a standard electrical permit through the Cityworks Portal and select the wire/rewire or change-of-service category matching your project scope.
  • The Master Fee Schedule's 'Alternate Energy Source' add-on ($65) is listed for solar/wind generation equipment; it was not found to explicitly cover EV charging equipment, so it should not automatically be assumed to apply — confirm with the Building Department at (406) 388-3560 if in doubt.

Frequently asked questions

Yes — a dedicated circuit for a home EV charger requires a standard City of Belgrade electrical permit, billed under the Master Fee Schedule's general wire/rewire or change-of-service fee categories (from $45 for a single additional circuit). No separate EV-specific permit or fee category is published.

In Belgrade, the published Single Family Interior/Exterior Wire or Rewire — 1 additional circuit or piece of equipment (typical for a dedicated EV charger circuit added to an existing panel with capacity) is: $45. Additional published fees: Residential Change of Service — disconnect with feeder and distribution panel board (applies if panel upgrade is needed to support EV charger load) — $75; Alternate Energy Source (solar, wind, etc.) add-on — $65, added to the base fee above. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Belgrade does not publish a plan-review timeline for this permit. Contact City of Belgrade Building Department at (406) 388-3564 for current turnaround.

You'll need: Electrical Permit Application. See the required-documents checklist on this page for details on each.

Belgrade requires 1 inspection(s) for an ev charger / evse installation permit, in order: Rough-In / Electrical Final. Schedule each through City of Belgrade Building Department ((406) 388-3564).

Apply through City of Belgrade Building Department at 91 East Central Avenue, Belgrade, MT 59714. Phone: (406) 388-3564, email: mjohnson@belgrademt.gov. Office hours: Community & Economic Development public counter, 91 E. Central Ave., Monday-Friday 9:00 AM - 3:00 PM (Permits and Licensing Division: 406-388-3560). Building Department general line: 406-388-3760. Chief Building Official Lucas Sobeck: 406-388-3564.. Official information: https://www.belgrademt.gov/166/Building.

Belgrade, Montana has adopted: Montana has a mandatory statewide building code administered by the Montana Department of Labor & Industry (DLI) Building Codes Bureau, amended by the Administrative Rules of Montana (ARM) Title 24, Chapter 301. Cities, counties, and towns may become 'certified' to locally administer permitting and inspection for all or part of the code (building, plumbing, electrical, mechanical, swimming pool, etc.); non-certified areas/trades fall under direct state administration by the DLI Building Codes Bureau. Source: Montana DLI Building Codes Bureau, Certified Local Government Program list (bsd.dli.mt.gov/_docs/building-codes-permits/certified-city.pdf) and Current Codes page (bsd.dli.mt.gov/building-codes-permits/current-codes).; Belgrade is a Montana DLI-certified jurisdiction for Building (B), Plumbing (P), Electrical (E), Mechanical (M), and Swimming Pool (SP) within Belgrade city limits — the full certification set (matching Billings), not a partial split. Certified building official on file with DLI: Lucas Sobeck, (406) 388-3560/388-3564. Source: Montana DLI Building Codes Bureau, Montana Certified Local Government Program list (PDF, updated 04/22/2026), bsd.dli.mt.gov/_docs/building-codes-permits/certified-city.pdf; City of Belgrade has adopted (as of 8/8/2022, per the City's Building FAQ) the 2021 editions of the International Residential Code (IRC), International Building Code (IBC), International Mechanical Code (IMC), International Fuel Gas Code (IFGC), International Existing Building Code (IEBC), Uniform Plumbing Code (UPC), International Energy Conservation Code (IECC), and International Swimming Pool and Spa Code (ISPSC); the 2017 ICC A117.1 Standard for Accessible and Usable Buildings and Facilities; and the 2020 National Electrical Code (NEC). Source: City of Belgrade Building FAQ, 'What building code year has the City of Belgrade most recently adopted?' (belgrademt.gov/Faq.aspx?QID=135); 2021 International Residential Code (IRC) — applies to single-family, two-family, and townhouse dwellings; effective statewide per ARM 24.301.154. Source: City of Belgrade Adopted Codes (PDF), belgrademt.gov/DocumentCenter/View/1228/Adopted-Codes; 2021 International Building Code (IBC) — commercial; per ARM 24.301.146; 2021 International Mechanical Code (IMC) — residential and commercial; per ARM 24.301.172; 2021 International Fuel Gas Code (IFGC) — residential and commercial; per ARM 24.301.173; 2021 International Energy Conservation Code (IECC) — residential and commercial; per ARM 24.301.161. Appendix RB (Solar Ready Provisions) adopted for commercial; 2020 National Electrical Code (NEC) — per ARM 24.301.401; 2021 Uniform Plumbing Code (UPC) (IAPMO) — per ARM 24.301.301 (Montana uses the Uniform Plumbing Code, not the International Plumbing Code); 2021 International Existing Building Code (IEBC) — commercial; per ARM 24.301.171; 2021 International Swimming Pool and Spa Code (ISPSC) — commercial; per ARM 24.301.175; Belgrade is DLI-certified for swimming pool (SP) permitting; ICC A117.1-2017 Standard for Accessible and Usable Buildings and Facilities — commercial; per ARM Subchapter 24.301.9; 2012 International Fire Code — per ARM Rule 23.12.601 (state fire code edition; City of Belgrade Building Department coordinates with the Belgrade Fire Department, and per the City's Inspections page, fire inspections within Belgrade city limits are now handled directly through the City's Building Department due to a recent state rule change); IRC Appendix Q (Tiny Houses) — adopted statewide per ARM; Design Live Loading, Snow Load, Frost Depth, Wind Speed, Weathering, and Seismic Design Category are set out in the City of Belgrade Design Criteria document (see localAmendments) — these are notably more stringent than nearby Billings, reflecting Belgrade's local site conditions; Source: City of Belgrade Adopted Codes (PDF), https://www.belgrademt.gov/DocumentCenter/View/1228/Adopted-Codes; City of Belgrade Design Criteria (PDF), https://www.belgrademt.gov/DocumentCenter/View/1016/Design-Criteria. Local amendments apply — see the Belgrade overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-20.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Belgrade building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.