Solar Photovoltaic (PV) Permit in Belgrade, Montana
VerifiedRequired for installation of rooftop solar photovoltaic systems in Belgrade. Requires both a Building Permit (structural/CAD review per the City's Solar Checklist) and an Electrical Permit with the Alternate Energy Source add-on. Governed by 2020 NEC, 2021 IBC, and 2021 IRC.
Verified 2026-07-03 · Source
When you need this permit
- CAD submittal must include plaques, equipment elevation drawings, neutral pass-thru, NG (Neutral-Ground) bond, production meter, disconnect, and separate PDF pages per component, per the City of Belgrade Solar Checklist
- Applicable codes: Electrical work under 2020 NEC; Building under 2021 IBC; Residential under 2021 IRC
- Engineering submittal must include a structural engineer stamp, engineering calculations, a one-line diagram, and a wet stamp
- Fire setback requirements: eaves 3 feet on one side; ridges 1.5 feet; hips 1.5 feet; valleys 1.5 feet
- Electrical Permit must include the $65 Alternate Energy Source add-on on top of the applicable base electrical fee
Required documents
- Required
Solar Checklist
City of Belgrade Solar Plan Submittal Requirements — CAD requirements and engineering requirements checklist
- Required
Building/Electrical Permit Application
Submitted online through the Cityworks Portal
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit (valuation-based, project cost used as valuation) | Valuation x 0.0076, plus Plan Review at Valuation x 0.0024 | City of Belgrade Master Fee Schedule, BUILDING CODE table; no dedicated solar-specific building fee line exists |
| Alternate Energy Source add-on (Electrical Permit) | $65, added to the applicable base electrical fee (e.g., a private accessory building or residential rewire fee category) | City of Belgrade Master Fee Schedule, Electrical Permits table |
Review timeline
Not published
Belgrade does not publish a plan-review timeline — contact the building department for current turnaround.
Inspection process
- 1
Electrical Rough-In
Conduit runs, wire sizing, neutral-ground bonding, and disconnect placement before energizing
- 2
Electrical Final
Panel mounting, racking attachment, roof penetration sealing, production meter, and interconnection point verified
Tips
- Solar installations must be submitted with separate PDF pages per the City's CAD requirements — plaques, equipment elevation drawings, neutral pass-thru, NG bond, production meter, and disconnect all need their own page.
- Fire setbacks for rooftop solar arrays are notably tight: 1.5 feet from ridges, hips, and valleys, and 3 feet from eaves on one side.
- No dedicated solar permit fee line exists on the Master Fee Schedule — solar is billed through the standard Building Permit (valuation-based) plus the Electrical Permit's $65 Alternate Energy Source add-on.
Frequently asked questions
- What permits do I need for solar panels in Belgrade?
- You need a Building Permit (reviewed against the City's Solar Checklist, covering CAD and engineering requirements) plus an Electrical Permit with the $65 Alternate Energy Source add-on fee. Source: City of Belgrade Solar Checklist and Master Fee Schedule.
Sources & verification
Verified against official sources. Last reviewed 2026-07-03.
- City of Belgrade Building Department — official building department
- Solar Checklist (PDF) | City of Belgrade
- Inspections, Checklists, and Fees | City of Belgrade
- Master Fee Schedule | City of Belgrade
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Belgrade building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Belgrade
Solar Photovoltaic (PV) Permit in other cities
Compare solar photovoltaic (pv) permit fees across Montana →
Project checklist — coming soon
Describe your project once and get every permit, document, and fee it triggers in Belgrade — in one checklist. Leave your email and we'll tell you when it's ready.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.