Solar PV Permit in Butte-Silver Bow, Montana
Required for installation of rooftop or ground-mounted solar photovoltaic systems in Butte-Silver Bow. The structural/racking portion is permitted as a Building Permit under BSB's locally adopted IBC/IRC (no separate published fee-schedule document), while the electrical/interconnection portion is permitted directly by the State of Montana Building Codes Program, since Butte-Silver Bow is not a certified local electrical jurisdiction. The State's Electrical Inspection Fee rule (ARM 24.301.461) sets a specific flat fee for commercial or residential renewable-energy installations (photovoltaic, wind, hydro).
Verified 2026-08-17 · Source
When you need this permit
- Building Permit required for the structural/racking portion, assessed under BSB's locally adopted IBC/IRC fee provisions (valuation-based, per the adopted I-Codes' default Section 109 fee schedule); no separate public fee-schedule table could be located
- Electrical Permit required for PV wiring/interconnection, issued directly by the State of Montana Building Codes Program (Business Standards Division, DLI), since BSB is not a certified local electrical jurisdiction
- A licensed electrical contractor must apply for the electrical permit selecting 'solar' on the application if the system is grid-tied; a non-electrician installer may instead obtain an 'alternate energy permit' and provide solar specifications, per the State's Alternative Energy Information guidance
- Homeowners may obtain a homeowner electrical permit for single-family interior/exterior wiring, but grid-tied systems still require a licensed electrical contractor to perform the interconnection wiring
- Ground-mounted systems are treated as accessory structures subject to BSB zoning setback, height, and lot-coverage requirements
- Submit to the Butte-Silver Bow Building & Code Enforcement Division, Butte Municipal Building, 155 W. Granite Street, Butte, MT 59701
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Butte-Silver Bow Municipal Code Sec. 15.04.060 ("Table No. Show full citationHide
Butte-Silver Bow Municipal Code Sec. 15.04.060 ("Table No. 1-A amended-Building permit fee"), Title 15 Article I Chapter 15.04 (BUILDING CODE), hosted on library.municode.com. Code current through Ordinance No. 2025-03, passed 2025-10-01 (Supp. No. 42). Table No. 1-A is a standalone, codified fee schedule. Plan review is separate: Sec. 15.04.070 sets it at 50 percent of the building permit fee for commercial and industrial work and 25 percent for single-family. Cross-check that this is the right source: the $75.00/hour re-inspection fee cited for this jurisdiction matches Sec. 15.04.065 verbatim.Review timeline
Inspection process
See the full Butte-Silver Bow inspection guide — scheduling & re-inspection fees →
Tips
- Butte-Silver Bow's electrical permitting for solar goes straight to the State of Montana Building Codes Program, not the local BSB Building & Code Enforcement Division — only the structural/racking Building Permit is handled locally.
- Montana's state electrical fee schedule has a genuinely dedicated $65 flat fee specifically for commercial or residential renewable-energy (photovoltaic, wind, hydro) installations, distinct from its amperage-based service-change fee tiers.
- If the system is grid-tied, a licensed electrical contractor must perform the interconnection wiring even if a homeowner or non-electrician installer handles other portions of the project.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-08-17.
Fee schedules
Applications & forms
Codes & ordinances
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Butte-Silver Bow building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Butte-Silver Bow's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Butte-Silver Bow yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Butte-Silver Bow lands. Privacy.
Other permits in Butte-Silver Bow
Solar PV Permit in other cities
Compare solar pv permit fees across Montana →
Look up this fee in a different city →
Now live
Build your Butte-Silver Bow project checklist
Describe your project once and get every permit, document, and fee it triggers in Butte-Silver Bow — in one checklist. Free, for any city and any number of projects.
Get started →