Electric Vehicle (EV) Charger / EVSE Permit — Colstrip, Montana · Requirements sheet
Verified 2026-07-20 · Source: https://bsd.dli.mt.gov/building-codes-permits/permit-applications/electrical-permits/ResidentialELEPermitFillable.pdf
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Electric Vehicle (EV) Charger / EVSE Permit in Colstrip, Montana
Colstrip has no dedicated EV charger/EVSE permit type. Colstrip holds no Montana DLI certification in Electrical (only a residential-only Building certification), so -- exactly as with the solar-pv-permit entry's electrical/interconnection component in this file -- an EVSE circuit installation, residential or commercial, requires a Residential or Commercial Electrical Permit issued directly by the Montana DLI Building Codes Bureau in Helena (not the City of Colstrip), under the 2020 NEC. The State's own Application for Residential Electrical Permit form (Rev. 12/22) contains an exact governing line item for this scope: under 'Single Family Interior/Exterior Wire or Rewire,' item H, '1 additional circuit or piece of equipment,' is $45 -- this is precisely the scope of a standard dedicated EVSE circuit added to an existing service, confirmed by direct reading of the fee-schedule PDF on 2026-07-20 (not merely inferred from an adjacent line).
Verified 2026-07-20 · Source
When you need this permit
- Electrical work for an EVSE circuit anywhere within Colstrip city limits requires a Residential or Commercial Electrical Permit issued by the Montana DLI Building Codes Bureau, because Colstrip holds no DLI Electrical certification
- Apply using the Montana DLI Application for Residential Electrical Permit (BCP-1) or Commercial equivalent
- No EV-charger-specific line item exists by name, but the state's own service-tier fee table maps a standard EVSE circuit to Type of Work item H, '1 additional circuit or piece of equipment' ($45), on the Application for Residential Electrical Permit
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
State Electrical Inspection
Montana DLI Building Codes Bureau electrical inspection of the EVSE circuit and connection
See the full Colstrip inspection guide — scheduling & re-inspection fees →
Tips
- Because Colstrip has no DLI Electrical certification, EVSE circuit work must be permitted through the State of Montana (DLI Building Codes Bureau in Helena), not the City of Colstrip -- the same split already documented for solar interconnection work in this file.
- A standard dedicated EVSE circuit added to an existing panel/service maps to item H, '1 additional circuit or piece of equipment,' at $45 on the state's Application for Residential Electrical Permit -- confirm with the Electrical Safety Program at (406) 841-2056 if your scope instead requires a new/upgraded service (item A, $200) or a service change (item I, $45).
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Colstrip building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Colstrip
Electric Vehicle (EV) Charger / EVSE Permit in other cities
Compare electric vehicle (ev) charger / evse permit fees across Montana →
Look up this fee in a different city →
Related guides
Now live
Build your Colstrip project checklist
Describe your project once and get every permit, document, and fee it triggers in Colstrip — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →