Colstrip building inspections
VerifiedInspection sequence, scheduling, and re-inspection fees for building permits in Colstrip, Montana.
Verified 2026-07-04 · Source
How to schedule
Inspections are requested through the building department below.
- Address
- 12 Cherry St., Colstrip, MT 59323
- Phone
- (406) 748-2300, ext. 2305 (Code Enforcement / Building and Zoning); general City Hall line (406) 748-2300; fax (406) 748-2303
- Office hours
- City Hall, 12 Cherry St., Colstrip, MT 59323. Code Enforcement Office handles Building and Zoning permitting; per the City's own Building and Zoning page, allow 2-3 days' advance notice when calling the Code Enforcement Office to schedule a building inspector site visit. No individual staff name/email for the current code enforcement/building inspector position is published on the City's site as of this review (the Montana DLI certified-jurisdiction roster lists Russell Murphy as the certified official on file, phone 853-5084).
- Website
- Official site
Inspection sequence
Applies to: Residential Building Permit (New Construction / Addition / Alteration / Repair / Move)
- 1
Pre-Construction / During-Construction Inspections
Per Municipal Code 7-1-4.E, the code enforcement officer conducts inspections before and during construction to verify compliance; per the City's own Building and Zoning webpage, allow 2-3 days' advance notice when calling the Code Enforcement Office to schedule a site visit. Inspections are provided at no additional cost per the City's own page.
- 2
Certificate of Occupancy
Per Municipal Code 7-1-4.F, once the code enforcement officer determines completed work complies with the chapter, a certificate of occupancy is issued before the building/structure may be occupied or used, per uniform building code sections 305-307
Applies to: Solar PV / Alternative Energy Permit (State-Issued)
- 1
Rough-In (Electrical)
Conduit runs, wire sizing, disconnect placement before covering/energizing; must be requested with 48 hours' notice
- 2
Final Interconnection
Per the state application form, a licensed electrical contractor must obtain and complete an additional permit/inspection for the final grid-tied utility connection before Permission to Operate
Sources & verification
Verified against official sources. Last reviewed 2026-07-04.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Colstrip building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Colstrip building permits
Get alerts for Colstrip
We'll email you when Colstrip's fees, documents, or codes change — not often.