EV Charger / EVSE Permit in Bozeman, Montana
Installation of a Level 1 or Level 2 electric vehicle charging station (EVSE) at a Bozeman property is processed as a standard Electrical Permit through the City's Community Development, Building Division — no distinct EV-charger-specific permit type, dedicated EV guidance page, or separate fee line item was found published by the City. The fee is valuation-based under Bozeman Municipal Code Sec. 10.02.020(A)(5) (Table C), the same mechanism used for any other electrical work.
Reviewed 2026-08-21 · Source
When you need this permit
- Submitted as an Electrical Permit application through the Building Division's standard process
- Dedicated branch circuit sized to EVSE manufacturer specifications, complying with the electrical code adopted by the City of Bozeman/State of Montana
- Contractor valuation of the project used to determine the fee under Table C, subject to Building Division approval of the valuation
- No EV-charger-specific application form, checklist, or fee category was found published separately from the general Electrical Permit
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Bozeman Municipal Code Sec. 10.02.020(A)(5), as amended by Ordinance 2143 (2023) — no distinct EV-charger/EVSE fee line item exists. Show full citationHide
Bozeman Municipal Code Sec. 10.02.020(A)(5), as amended by Ordinance 2143 (2023) — no distinct EV-charger/EVSE fee line item exists. FY27 Building Fee Schedule Table C (effective August 1st, 2026, now published on the City's Building Checklists, Forms, and Guides page; rates unchanged from FY26): $26.75 base fee up to $500 valuation; $26.75 + $3.05 per additional $100 to $2,000; $69.25 + $14 per additional $1,000 to $25,000; $391.75 + $10.10 per additional $1,000 to $50,000; $643.75 + $7 per additional $1,000 to $100,000; higher tiers continue to $5,608.75 + $3.15 per additional $1,000 above $1,000,000.Review timeline
Inspection process
- 1
Rough-In / Final Electrical
Circuit wiring, breaker sizing, grounding, and EVSE connection verified
See the full Bozeman inspection guide — scheduling & re-inspection fees →
Tips
- Bozeman does not publish a distinct EV-charger/EVSE permit fee or guidance page — expect the same valuation-based Electrical Permit fee (Table C) used for any other electrical circuit work.
- The current Table C dollar figures are published in the FY27 Building Fee Schedule PDF (effective August 1st, 2026), linked from the City's Building Checklists, Forms, and Guides page.
Frequently asked questions
Sources & verification
Key facts verified against official sources. Last reviewed 2026-08-21.
Checklists & handouts
Codes & ordinances
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Bozeman building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Bozeman's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Bozeman yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Bozeman lands. Privacy.
Other permits in Bozeman
EV Charger / EVSE Permit in other cities
Compare ev charger / evse permit fees across Montana →
Look up this fee in a different city →
Related guides
Now live
Build your Bozeman project checklist
Describe your project once and get every permit, document, and fee it triggers in Bozeman — in one checklist. Free, for any city and any number of projects.
Get started →