EV Charger / EVSE Permit — Bozeman, Montana · Requirements sheet
Reviewed 2026-07-20 · Source: https://www.bozemanmt.gov/departments/community-development/development-center/building-checklists-forms-and-guides
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
EV Charger / EVSE Permit in Bozeman, Montana
Installation of a Level 1 or Level 2 electric vehicle charging station (EVSE) at a Bozeman property is processed as a standard Electrical Permit through the City's Community Development, Building Division — no distinct EV-charger-specific permit type, dedicated EV guidance page, or separate fee line item was found published by the City. The fee is valuation-based under Bozeman Municipal Code Sec. 10.02.020(A)(5) (Table C), the same mechanism used for any other electrical work.
Reviewed 2026-07-20 · Source
When you need this permit
- Submitted as an Electrical Permit application through the Building Division's standard process
- Dedicated branch circuit sized to EVSE manufacturer specifications, complying with the electrical code adopted by the City of Bozeman/State of Montana
- Contractor valuation of the project used to determine the fee under Table C, subject to Building Division approval of the valuation
- No EV-charger-specific application form, checklist, or fee category was found published separately from the general Electrical Permit
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough-In / Final Electrical
Circuit wiring, breaker sizing, grounding, and EVSE connection verified
See the full Bozeman inspection guide — scheduling & re-inspection fees →
Tips
- Bozeman does not publish a distinct EV-charger/EVSE permit fee or guidance page — expect the same valuation-based Electrical Permit fee (Table C) used for any other electrical circuit work.
- Confirm the current Table C dollar figures directly with the Building Division (406-582-2377) — the FY26 Building Fee Schedule PDF was not independently accessible during this or the prior research session; bozemanmt.gov returns a 403 to automated fetch on its building-permit pages, and no Wayback Machine snapshot exists as an alternate route.
Frequently asked questions
Sources & verification
Key facts verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Bozeman building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Bozeman
EV Charger / EVSE Permit in other cities
Compare ev charger / evse permit fees across Montana →
Look up this fee in a different city →
Related guides
Now live
Build your Bozeman project checklist
Describe your project once and get every permit, document, and fee it triggers in Bozeman — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →