Skip to main content
PermitBase

Re-Roof Permit in Bozeman, Montana

Required for residential re-roofing (residential residing/re-roofing) in Bozeman. A dedicated Residential Re-roof Guide is published by the Building Division.

Verified 2026-07-02 · Source

When you need this permit

  • Stand-alone 'Re-Roof' permit application type (listed alongside 'Residential Residing' as related stand-alone applications)
  • Must follow the city's Residential Re-roof Guide
  • Reviewed under the applicable roofing provisions of the 2021 IRC/IBC as adopted statewide

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →

Fee schedule

Re-Roof Permit FeeSpecific current dollar figure not independently retrieved this review — see FY26 Building Fee Schedule PDF reference below
Assessed per the Building Division's current fee schedule (formula/valuation-based per Sec. 10.02.020)

Review timeline

Plan reviewTypical estimate — confirm current times with the Bozeman building department
~1–3 business days

How long did your Re-Roof Permit permit actually take in Bozeman?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Final

    Final roofing inspection per the Residential Re-roof Guide

See the full Bozeman inspection guide — scheduling & re-inspection fees →

Tips

  • Review the Residential Re-roof Guide (PDF) before applying — it lays out the specific scope and inspection requirements the Building Division expects for re-roofing projects.
  • 'Residential Residing' (siding) is filed as a related but distinct stand-alone permit application type from 'Re-Roof.'

Frequently asked questions

Yes. The City of Bozeman offers a stand-alone 'Re-Roof' permit application type; consult the Residential Re-roof Guide (PDF) published on the Building Permit Checklists, Forms, and Guides page for specific requirements.

In Bozeman, the published Re-Roof Permit Fee is: Assessed per the Building Division's current fee schedule (formula/valuation-based per Sec. 10.02.020). These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Plan review for a re-roof permit in Bozeman typically runs 1–3 business days. This is an estimate, not a published figure — confirm current review times with City of Bozeman — Community Development, Building Division at (406) 582-2375 ext. 1.

You'll need: Residential Re-roof Guide (PDF). See the required-documents checklist on this page for details on each.

Bozeman requires 1 inspection(s) for a re-roof permit, in order: Final. Schedule each through City of Bozeman — Community Development, Building Division ((406) 582-2375 ext. 1).

Apply through City of Bozeman — Community Development, Building Division at 20 East Olive Street, Bozeman, MT 59715 (Professional Building front counter); mailing/administration at 121 N Rouse Ave, Bozeman, MT 59715. Phone: (406) 582-2375 ext. 1, email: building@bozemanmt.gov. Office hours: Professional Building front counter (20 East Olive St.): Mon, Wed, Fri 9am-4pm; Tue, Thu 9am-1pm. Plans Examiner appointments (commercial or residential) bookable via Vagaro, 30-minute slots daily.. Official information: https://www.bozemanmt.gov/departments/community-development/building.

Bozeman, Montana has adopted: 2021 International Residential Code (IRC) — State of Montana adopted code, ARM 24.301.154 (chapters 11-14 and 16-43 deleted by ARM amendment); Appendix Q (Tiny Houses) adopted; 2021 International Building Code (IBC) — State of Montana adopted code, ARM 24.301.146; 2021 International Mechanical Code (IMC) — ARM 24.301.172; 2021 International Fuel Gas Code (IFGC) — ARM 24.301.173; 2021 International Energy Conservation Code (IECC) — ARM 24.301.161; Appendix RB (Solar Ready Provisions) adopted; 2020 National Electrical Code (NEC) — ARM 24.301.401; 2021 Uniform Plumbing Code (UPC, IAPMO) — ARM 24.301.301; 2021 International Existing Building Code (IEBC) — ARM 24.301.171 (commercial); 2021 International Swimming Pool and Spa Code — ARM 24.301.175 (commercial); 2021 International Fire Code — ARM 23.12.601, Admin Order 2023-04; ICC A117.1-2017 Standard for Accessible and Usable Buildings and Facilities — ARM Subchapter 24.301.9 (commercial); NOTE: Montana plans to adopt the 2024 ICC family of codes statewide in mid-2026; the City of Bozeman's Building Division states designs must comply with the code cycle in effect at time of permit application submission and will publish updates when the new cycle takes effect.. Local amendments apply — see the Bozeman overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-02.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Bozeman building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.