This is PermitBase’s published record for Glasgow as of 2026-07-03. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.
Glasgow building permits
VerifiedGlasgow, Montana — as published 2026-07-03.
Verified 2026-07-03 · Source
Codes adopted
Permit types & fees
Residential Building Permit (New Construction / Addition / Alteration)
VerifiedRequired for new single-family home construction, additions, garages, decks over 2 feet high, and structural alterations within Glasgow city limits. Issued by the City of Glasgow Public Works/Building Codes Department under its DLI-certified local Building (B) program. Plans are reviewed against the code editions referenced in the City's own Building Permit Packet (2018 IRC/IBC/IMC/IEBC/IFGC/ISPSC, 2012 IECC, 2018 UPC — see codesAdopted note on a possible discrepancy with the state's newer 2021-cycle codes).
Verified 2026-07-03 · Source
Requirements
- Building Permit Application completed in full: owner, contractor, and architect/engineer contact information; class of work (new/addition/alteration/repair/mobile home); legal description (street address, lot, block, subdivision, zoning district); off-street parking spaces provided; change of occupancy if any; valuation of work and number of family units; type of construction (foundation, exterior walls, roof, interior walls)
- Minimum of TWO complete sets of plans required for residential remodel/garage projects; THREE complete sets required for residential new construction, per the Building Permit Application Instructions
- Required drawings: plot plan/site plan (scale not less than 1/4 inch = 1 foot, showing dimensions, north point, front/rear/side yards, walks/driveways/parking, steps/terraces/porches/fences/retaining walls, easements and setbacks, grading and drainage), construction/floor plan, exterior elevations (front, rear, both sides), and typical cross sections/wall sections (multiple sections required for a typical house, more for commercial)
- As of Ordinance No. 966 (effective July 27, 2020): property pins must be established and clearly visible before permit issuance for any new building project or any project that modifies an existing structure's footprint; the Building Inspector must witness the pins in place, or a licensed surveyor must establish them first
- Submitted roof truss diagrams must bear the seal of a Montana-licensed professional engineer
- All commercial plans for public buildings must be wet-stamped (each set original-stamped) by a Montana-licensed architect or engineer
- Projects within the designated 500-foot Critical Zone of the Glasgow/Cherry Creek/Milk River Levee require mandatory additional review by the U.S. Army Corps of Engineers before the City can issue an approved permit
- Offset/setback requirements are measured from the wall to the property line and are non-negotiable Zoning Code minimums; where a garage is accessed from an alley, the setback from the structure to the edge of the alley must be 20 feet
Required documents
- RequiredApplication for Building PermitCity of Glasgow form; submit to City of Glasgow, Department of Public Works, Building Codes, 319 3rd Street South, Glasgow, MT 59230, or electronically to codecompliance@cityofglasgowmt.com
- RequiredPlot Plan / Site PlanScale not less than 1/4 inch = 1 foot; shows dimensions, north point, yard dimensions, walks/driveways/parking, steps/terraces/porches/fences/retaining walls, easements, setbacks, grading and drainage
- RequiredConstruction/Floor Plan, Elevations, and Cross SectionsFloor plan of each floor/basement; exterior elevations (front, rear, both sides); typical cross sections/wall sections from footing to roof peak, showing construction materials, sizes, and spacing
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building permit fee (all classes of work) | No fixed valuation-based fee schedule was found published on the City of Glasgow website, in the Building Permit Packet, or via the Municode-hosted Code of Ordinances (Municode returned an access error — library.municode.com/mt/glasgow — during direct verification attempts). The Demolition Permit form references City Code 'Sec. 8-117' for its own fee tiers, indicating Chapter 8 governs building-related fees, but the specific building-permit fee table/valuation schedule was not independently locatable online after exhausting the City's Building Permit Packet, Public Works Department page, ordinances page, and Municode. Left null per the zero-tolerance policy rather than estimated; applicants must contact the Building Codes Department at (406) 228-2476 ext. 8 or codecompliance@cityofglasgowmt.com for a current fee quote. |
Electrical Permit (State-Issued)
VerifiedBecause Glasgow is DLI-certified for Building only, electrical work anywhere within Glasgow city limits requires a Residential (or Commercial) Electrical Permit issued directly by the Montana DLI Building Codes Bureau in Helena, not by the City of Glasgow. Confirmed explicitly in the City's own Building Permit Packet: 'The City of Glasgow does not issue Electrical or Plumbing Permits... Electrical and Plumbing permits are obtained from the State of Montana Business Standards Division.'
Verified 2026-07-03 · Source
Requirements
- Application must be signed and dated by the licensed electrical contractor's person in charge
- Payment must be submitted with the application; incomplete applications are returned unprocessed
- Property address, county, and whether the job is inside city limits must be indicated
- Apply in accordance with Title 50, Chapter 60, Section 604, MCA and ARM 24.301.431
Required documents
- RequiredApplication for Residential Electrical PermitMontana Building Codes Bureau statewide form (Rev. 12/22); mailed with payment to Building Codes Program, PO Box 200517, Helena, MT 59620-0517, or filed online via ebiz.mt.gov
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Single Family Dwelling or Cabin — up to 200-amp service (includes meter base and attached garages if wired at the same time) | $200 | Montana Building Codes Bureau, Application for Residential Electrical Permit (Rev. 12/22) statewide fee schedule — applies to all non-electrically-certified Montana jurisdictions, including Glasgow |
| Single Family Dwelling or Cabin — 201 to 400-amp service | $380 | Application for Residential Electrical Permit (Rev. 12/22) |
| Single Family Dwelling or Cabin — 401 to 600-amp service | $600 | Application for Residential Electrical Permit (Rev. 12/22) |
| Single Family Dwelling or Cabin — 601-amp service and up | $800 | Application for Residential Electrical Permit (Rev. 12/22) |
| Residential Change of Service — exterior meter base & main disconnect only | $45 | Application for Residential Electrical Permit (Rev. 12/22) |
| Private Property Accessory Building — up to 200-amp panel | $80 | Application for Residential Electrical Permit (Rev. 12/22) |
| Request inspection, per hour | $60 (plus $30 per additional 30 minutes or fraction thereof in excess of one hour, plus travel time) | Application for Residential Electrical Permit (Rev. 12/22) |
Plumbing Permit (State-Issued, incl. Water Heater)
VerifiedBecause Glasgow is DLI-certified for Building only, plumbing work anywhere within Glasgow city limits — including water heater installation/replacement — requires a Plumbing Permit issued directly by the Montana DLI Building Codes Bureau in Helena, not by the City of Glasgow. Confirmed explicitly in the City's own Building Permit Packet.
Verified 2026-07-03 · Source
Requirements
- Application must be signed by the Master Plumber and include the Master Plumber License Number
- Property address, county, GEOCODE/parcel/lot/block, and whether the job is inside city limits must be indicated
- Type of Building, Type of Work, sewer service type (public/septic), and potable water source must be indicated
- Apply in accordance with Title 50, Chapter 60, Section 505, MCA and ARM 24.301.301 / 24.301.361
Required documents
- RequiredApplication for Plumbing Permit (BCP-1)Montana Building Codes Bureau statewide form (Rev. 10/2019); mailed with payment to Building Codes Bureau, PO Box 200517, Helena, MT 59620-0517, or filed online via ebiz.mt.gov
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Each NEW water heater (or replacement) | $25 | Montana Building Codes Bureau, Application for Plumbing Permit (BCP-1, Rev. 10/2019) statewide fee schedule — applies to all non-plumbing-certified jurisdictions, including Glasgow |
| Each plumbing fixture or trap | $10 per fixture/trap | Application for Plumbing Permit (BCP-1, Rev. 10/2019) |
| Each connection of building water supply to water service/public utility or private well | $20 | Application for Plumbing Permit (BCP-1, Rev. 10/2019) |
| Each connection of building drain to sewer system (public or septic) | $20 | Application for Plumbing Permit (BCP-1, Rev. 10/2019) |
| Repair or alteration of drainage or vent piping | $30 | Application for Plumbing Permit (BCP-1, Rev. 10/2019) |
| Gray water system, commercial or residential | $60 | Application for Plumbing Permit (BCP-1, Rev. 10/2019) |
| Each hose bibb, vacuum breaker, and/or backflow device | $6 | Application for Plumbing Permit (BCP-1, Rev. 10/2019) |
Mechanical / HVAC Permit (State-Issued)
VerifiedBecause Glasgow's DLI certification is Building (B) ONLY per the official DLI roster (no 'M' shown), this KB treats mechanical/HVAC work anywhere within Glasgow city limits as requiring a Mechanical Permit issued directly by the Montana DLI Building Codes Bureau in Helena. Note: the City's own Building Permit Packet contains conflicting language, at one point stating the City itself issues mechanical permits alongside building permits — see the codesAdopted discrepancy note. Applicants should confirm directly with the City (406-228-2476 ext. 8) which office to file with before submitting.
Verified 2026-07-03 · Source
Requirements
- Project Value must be provided; permit fee is calculated from the state's valuation-based fee schedule
- Type of Building and Type of Work must be indicated
- Boiler work requires a separate Boiler Permit form, not the Mechanical Permit
- Apply in accordance with Title 50, Chapter 60, Section 104, MCA and ARM 24.301.172
Required documents
- RequiredApplication for Mechanical Permit (BCP-1)Montana Building Codes Bureau statewide form (Rev. 06/2022); mailed with payment to Department of Labor and Industry / BCB, PO Box 200517, Helena, MT 59620-0517, or filed online via ebiz.mt.gov
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Mechanical Permit — project value $0-$10,000 | $48 for the first $1,000, plus $14 for each additional $1,000 or fraction thereof | Montana Building Codes Bureau, Application for Mechanical Permit (BCP-1, Rev. 06/2022) statewide fee schedule |
| Mechanical Permit — project value $10,001-$50,000 | $166 for the first $10,000, plus $9 for each additional $1,000 or fraction thereof | Application for Mechanical Permit (BCP-1, Rev. 06/2022) |
| Mechanical Permit — project value $50,001 or more | $514 for the first $50,000, plus $6 for each additional $1,000 or fraction thereof | Application for Mechanical Permit (BCP-1, Rev. 06/2022) |
Fencing Permit
VerifiedRequired for new fence/wall/hedge construction or installation, extensive repair, or additional runs of fencing over 10 feet in length within Glasgow city limits, per City Fence Ordinance No. 972 (originally required since July 15, 2015 under Ordinance No. 953). Issued by the City of Glasgow Public Works Department.
Verified 2026-07-03 · Source
Requirements
- Permit required for: new construction/installation of fencing on residential or commercial properties; rebuilding or extensive repair of existing fences; general repair replacing more than 20% of pickets/rails/surface boards/chain-link fabric or more than 2 posts on the same run; any new additional run of fencing over 10 feet added to existing fencing
- NOT required for: spot repair of occasional boards, repainting/staining of existing fences (under 20% of a given run); replacement of 2 existing posts in any given run
- Fences/walls/hedges up to 3 feet in height may be erected anywhere on a property, including within required clear-vision zones
- Fences/walls/hedges exceeding 3 feet must meet yard setback requirements and must NOT be located within the mapped clear-vision zones (Figures C3-1, C3-2, C3-3, varying by uncontrolled/semi-controlled/fully-controlled intersection type)
- No fence may be erected or maintained in a public right-of-way
- Permissible materials: wood, brick, concrete block, landscape block, split rail, chain-link, smooth wire, vinyl, ornamental iron. NOT permitted: railroad ties, wood pallets, tires, rubble, metal panels, barbed wire, salvaged materials (any unlisted material subject to Public Works Department review/approval)
- Finished side of the fence must face the outside of the property
- Fence installed exactly on a shared property line requires a written, notarized mutual-use agreement between both property owners, explicitly voidable if either property is sold, or the application will not be approved
- Owner/contractor must contact Montana 811 (Call Before You Dig) before any excavation for posts or footings
- Commercial, Unrestricted, and Industrial zoning districts have separate setback and material regulations (inquire with Public Works for commercial fencing)
Required documents
- RequiredApplication for Fence PermitCity of Glasgow form; submit in person to the City Clerk's Office or Public Works Department Office at 319 3rd Street South, Glasgow, MT 59230, by mail, or electronically to codecompliance@cityofglasgowmt.com
- RequiredSketch Plan of Proposed FencingDoes not need to be to scale, but must show the general shape of the lot, location of structures, location of the proposed fence, and correct distances from property lines or permanent infrastructure (back of sidewalk or edge of street pavement)
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Fence/wall/hedge permit fee | $5.00 | City of Glasgow Fencing Permit Packet: 'Before any fence permit is granted for installation of a fence, wall, or proposed screening shrubbery (hedge) the person(s) making the application for such permit shall pay to the City of Glasgow Public Works Department a fee for $5.00.' |
Demolition Permit
VerifiedRequired for demolition of any structure within Glasgow city limits. Issued by the City of Glasgow Office of Public Works. Requires documented utility disconnection and inspected removal of footings/foundations and sewer-line plugging before close-out.
Verified 2026-07-03 · Source
Requirements
- Demolition permit application must include address/location of demolition, legal description (lot, block, subdivision), owner and contractor contact information, and bonding certificate status
- City sewer lines must be plugged at the property line and inspected
- Footing and foundation must be removed and inspected
- Septic systems addressed per the form's septic line item (coordination with relevant health/septic authority implied)
- Utilities (electrical, gas, telephone, cable, sanitary sewer, water) must be disconnected/turned off, with each utility's disconnection signed and dated directly on the permit form before or upon demolition
- Permit fee must be paid (cash, check, or billed) to the Director of Public Works, Public Works Assistant, or City Clerk
Required documents
- RequiredDemolition Permit ApplicationCity of Glasgow Office of Public Works form; includes utility-disconnection sign-off lines and fee payment block
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Demolition Permit Fee — Residential | $50 | City of Glasgow Demolition Permit form, citing City Code Sec. 8-117 |
| Demolition Permit Fee — Commercial | $150-$500 | City of Glasgow Demolition Permit form, citing City Code Sec. 8-117; exact amount within this range determined by the City at issuance |
Accessory Structure / Deck Permit
VerifiedRequired for decks over 2 feet off the surrounding ground and for detached accessory buildings/sheds larger than 120 square feet (10'x12') within Glasgow city limits. Uses the same combined Application for Building Permit as new construction.
Verified 2026-07-03 · Source
Requirements
- Building permit required for: new construction of detached or attached garages/carports; decks over 2 feet off the surrounding ground; accessory buildings or sheds in excess of 120 square feet (10'x12')
- NOT required for detached accessory buildings/sheds that are 120 square feet or smaller
- Garage size is capped by lot size: under 7,000 sq ft lot allows up to 1,000 sq ft garage; 7,000-10,000 sq ft lot allows up to 1,200 sq ft; over 10,000 sq ft (contiguous if more than one lot) allows up to 1,600 sq ft maximum residential garage
- A detached garage closer than 10 feet to a residential or commercial building is treated as 'attached' and requires a firewall facing the building: no windows, solid wood or steel door with no window lights, interior wall covered with 5/8-inch sheetrock
- Setback/offset requirements measured from the wall to the property line apply in every zoning district and are non-negotiable; where access is from an alley, the setback from the structure to the edge of the alley must be 20 feet
- Ordinance No. 966 property-pin requirement applies: pins must be established and witnessed by the Building Inspector before permit issuance if the project modifies the structure's footprint
- Plot plan and construction plan/elevations required per the standard Building Permit Application Instructions (minimum 2 complete sets of plans for garages/remodel-scale projects)
Required documents
- RequiredApplication for Building PermitSame City of Glasgow form used for all new construction/alteration work, with 'New' or 'Addition' indicated for the accessory structure or deck
- RequiredPlot Plan and Construction PlanSite plan showing setbacks and structure location; construction/floor plan and typical cross-section for the deck or accessory structure
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building permit fee (accessory structure/deck) | Same unresolved fee-schedule gap as the general Residential Building Permit — no fixed published fee table was locatable for Glasgow (City Building Permit Packet, Public Works page, and Municode all checked). Left null per the zero-tolerance policy; contact the Building Codes Department at (406) 228-2476 ext. 8 for a current quote. |
Sources & verification
Verified against official sources. Last reviewed 2026-07-03.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Glasgow building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.