You are viewing the permanent link for the record currently in effect, published 2026-06-30.
Unincorporated Clark County building permits
VerifiedUnincorporated Clark County, Nevada — as published 2026-06-30.
Verified 2026-07-16 · Source
Codes adopted
Permit types & fees
Residential Building Permit (New Construction)
VerifiedRequired for all new single-family dwellings and duplexes in unincorporated Clark County (covering Paradise, Spring Valley, Enterprise, Sunrise Manor, and other unincorporated Las Vegas Valley communities). Permits are submitted through the Citizen Access Portal and plan review is required. Custom single-family residences have a 21-day first-review goal.
Verified 2026-07-16 · Source
Requirements
- All new residential construction requires a building permit and plan review
- Plans must comply with the 2024 IRC and 2024 IECC
- Submit via Citizen Access Portal (online) or in person at 4701 W. Russell Rd.
- Combination permit covers building, electrical, plumbing, and mechanical under one submission
- Contractor licensing required — verify at Nevada State Contractors Board
- MSHCP mitigation fee, Transportation Tax, and Residential Park Fee are collected at permit issuance in addition to building permit fees
Required documents
- RequiredBuilding Permit ApplicationAvailable via Citizen Access Portal (citizenaccess.clarkcountynv.gov) or from the Application Forms page
- RequiredConstruction DrawingsFull plan set: site plan, floor plans, elevations, sections, structural details, energy compliance documentation — all drawn to scale
- RequiredEnergy Code Compliance DocumentationDemonstration of compliance with the 2024 IECC (required for all permits filed on or after January 11, 2026)
- RequiredContractor License InformationNevada State Contractors Board license number; homeowner-builder declaration if owner-occupant performing own work
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee — valuation-based (Table 3-A) | Varies — valuation-based (see Table 3-A) | Table 3-A, Clark County Code §22.02.390: $54.00 for first $500; $54.00 + $1.683 per additional $100 (to $2,000); $79.29 + $7.371 per additional $1,000 ($2,001–$25,000); $248.82 + $4.725 per additional $1,000 ($25,001–$50,000); $366.95 + $3.402 per additional $1,000 ($50,001–$100,000); $537.05 + $2.934 per additional $1,000 ($100,001+). Example: $350,000 new home = $1,270.55 building permit fee. |
| Building Plan Review Fee | Varies — valuation-based | Approximately 65% of the building permit fee. Example: $350,000 valuation = $825.86 plan review fee. Calculated by Clark County staff at submittal. |
| Zoning Plan Review Fee | Varies — valuation-based | Approximately 10% of building permit fee. Example: $350,000 valuation = $127.06. Assessed at submittal. |
| Electrical Permit Fee (included in combination permit) | Varies — valuation-based | Example: $350,000 valuation = $228.70 electrical permit + $57.18 electrical plan review. |
| Plumbing Permit Fee (included in combination permit) | Varies — valuation-based | Example: $350,000 valuation = $209.64 plumbing permit + $52.41 plumbing plan review. |
| Mechanical Permit Fee (included in combination permit) | Varies — valuation-based | Example: $350,000 valuation = $190.58 mechanical permit + $47.65 mechanical plan review. |
| Estimated Total Permit + Plan Review (new home, $350k valuation) | $3,009.63 | Estimate from official Clark County Fee Calculator API (aca-feecalc-api.clarkcountynv.gov) for $350,000 valuation. Includes building + electrical + plumbing + mechanical permit and plan review fees. Does not include impact fees (MSHCP, transportation tax, park fee). Re-run live 2026-07-16: all component fees and the $3,009.63 total returned unchanged. |
| Re-inspection Fee | $110.00 each | Table 3-I, Clark County Code §22.02.430 |
Residential Addition / Remodel Permit
VerifiedRequired for additions, structural alterations, room additions, garage conversions, covered patios, interior remodels involving structural work, and other changes to existing single-family dwellings in unincorporated Clark County. Residential Minor projects (non-standard plan, non-custom home) have a 14-day first-review goal.
Verified 2026-07-16 · Source
Requirements
- Room additions and structural modifications to existing dwellings
- Covered patio additions and patio enclosure conversions
- Garage conversions to living space
- Interior remodels involving structural framing changes
- Retaining walls (check with planning for height thresholds)
- Submit via Citizen Access Portal or in person at 4701 W. Russell Rd.
- Plans must comply with 2024 IRC and 2024 IECC (effective January 11, 2026)
Required documents
- RequiredBuilding Permit ApplicationAvailable via Citizen Access Portal or Application Forms page
- RequiredConstruction DrawingsSite plan showing existing and proposed structures, floor plan of addition, elevations, structural details, and connection to existing structure
- OptionalEnergy Code Compliance DocumentationRequired for additions that increase conditioned floor area — 2024 IECC compliance
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee — valuation-based (Table 3-A) | Varies — valuation-based (see Table 3-A) | Same Table 3-A schedule as new construction. Example: $100,000 addition/remodel valuation = $537.05 building permit fee. See Clark County Code §22.02.390. |
| Building Plan Review Fee | Varies — valuation-based | Example: $150,000 remodel valuation → estimated total permit + plan review = $1,619.65 (all trades combined, per fee calculator; re-run and confirmed unchanged 2026-07-16). |
| Re-inspection Fee | $110.00 each | Table 3-I, Clark County Code §22.02.430 |
Electrical Permit
VerifiedRequired for electrical installations, panel replacements, rewiring, and electrical work in residential and commercial properties in unincorporated Clark County. Simple online permits are available for panel replacements and test-and-tag without plan review. All work must comply with the 2023 NEC.
Verified 2026-07-16 · Source
Requirements
- Installation, change, or repair of any hard-wired electrical system
- Panel replacements (same-size, up to 2,000 amps — simple online permit available)
- Test and tag (simple online permit available)
- Larger electrical projects use valuation-based Table 3-A fees
- Electrical work on manufactured homes must be permitted by Nevada State Manufactured Housing Division (702) 486-4135
Required documents
- RequiredElectrical Permit ApplicationAvailable via Citizen Access Portal (citizenaccess.clarkcountynv.gov) for simple online permits or via Application Forms for full permits
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Permit Issuance Fee (base fee for all electrical permits) | $54.00 | Table 3-B, Clark County Code §22.02.395 (Ord. No. 4663, 2019; amended Ord. No. 4917, 2022). Re-confirmed on Municode 2026-07-16 — code codified through Ord. No. 5318 (11-19-2025) with no newer amendment to Table 3-B. |
| Simple Online Permit — Electrical Re-Tag / Test and Tag | $61.88 | Table 3-B — Simple Online Permit rate; no plan review required |
| Simple Online Permit — Same-Size Panel Replacement (up to 200A) | $61.88 | Table 3-B — Simple Online Permit rate |
| Simple Online Permit — Same-Size Panel Replacement (up to 600A) | $70.56 | Table 3-B — Simple Online Permit rate |
| Simple Online Permit — Same-Size Panel Replacement (up to 2,000A) | $86.80 | Table 3-B — Simple Online Permit rate |
| Simple Online Permit — Same-Size Panel Replacement (over 2,000A) | $119.16 | Table 3-B — Simple Online Permit rate |
| Sub-Panel or Distribution Board (per panel) | $4.35 | Table 3-B — per subpanel |
| Signals, alarms, TV outlets, control panels, telephones (per unit) | $0.45 | Table 3-B — Power Limited |
| Non-simple electrical projects (not specified in Table 3-B) | Varies — valuation-based per Table 3-A | Apply total value of scope of work to Table 3-A. Example: $50,000 electrical project = $366.95 permit + plan review fees. |
| Re-inspection Fee | $110.00 each | Table 3-I, Clark County Code §22.02.430 |
Plumbing Permit
VerifiedRequired for plumbing installations, repairs, and alterations in unincorporated Clark County. Simple online permits are available for water heaters, re-pipe, reverse osmosis, water softeners, and gas re-tags without plan review. Clark County uses the Uniform Plumbing Code (UPC), not the IPC.
Verified 2026-07-16 · Source
Requirements
- Installation, replacement, or repair of plumbing systems including water heaters, fixtures, and piping
- Water heater replacement (simple online permit available)
- Re-pipe (residential — simple online permit available)
- Reverse osmosis and water softener installations (simple online permits available)
- Gas re-tag (simple online permit — no gas piping changes, tag only)
- Plumbing work on manufactured homes must be permitted by Nevada State Manufactured Housing Division
Required documents
- RequiredPlumbing Permit ApplicationAvailable via Citizen Access Portal for simple online permits or from Application Forms page
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Permit Issuance Fee (base fee for all plumbing permits) | $54.00 | Table 3-D, Clark County Code §22.02.405 (Ord. No. 4663, 2019; amended Ord. No. 4917, 2022). Re-confirmed on Municode 2026-07-16 — no newer amendment to Table 3-D. |
| Simple Online Permit — Water Heater Replacement | $56.57 | Table 3-D — Simple Online Permit rate; no plan review required |
| Simple Online Permit — Residential Re-Pipe | $56.57 | Table 3-D — Simple Online Permit rate |
| Simple Online Permit — Reverse Osmosis | $56.57 | Table 3-D — Simple Online Permit rate |
| Simple Online Permit — Water Softener | $56.57 | Table 3-D — Simple Online Permit rate |
| Simple Online Permit — Gas Re-Tag Only | $61.88 | Table 3-D — Simple Online Permit rate |
| Non-simple plumbing projects (not specified in Table 3-D) | Varies — valuation-based per Table 3-A | Apply total value of scope to Table 3-A. Example: $50,000 plumbing project sub-permit: $366.95 permit + $128.43 plan review = $495.38. |
| Re-inspection Fee | $110.00 each | Table 3-I, Clark County Code §22.02.430 |
Mechanical / HVAC Permit
VerifiedRequired for heating, ventilation, air conditioning, and mechanical system installations in unincorporated Clark County. Simple online permits are available for single residential A/C and furnace replacements without plan review. Clark County uses the Uniform Mechanical Code (UMC), not the IMC.
Verified 2026-07-16 · Source
Requirements
- Installation or replacement of any HVAC equipment: furnaces, air conditioners, heat pumps, condensers
- A/C or furnace replacement (simple online permit available for residential, one appliance per permit)
- Multiple appliance replacements require a sub-trade permit, not a simple online permit
- Mechanical work on manufactured homes permitted by Nevada State Manufactured Housing Division
Required documents
- RequiredMechanical Permit ApplicationAvailable via Citizen Access Portal for simple online permits or Application Forms page
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Permit Issuance Fee (base fee for all mechanical permits) | $54.00 | Table 3-C, Clark County Code §22.02.400 (Ord. No. 4663, 2019; amended Ord. No. 4917, 2022). Re-confirmed on Municode 2026-07-16 — no newer amendment to Table 3-C. |
| Simple Online Permit — Residential A/C or Furnace Replacement | $61.88 | Table 3-C — Simple Online Permit rate for A/C Furnace Replacement (residential) |
| Simple Online Permit — Furnace Replacement < 100K BTU | $62.28 | Table 3-C — Simple Online Permit rate |
| Simple Online Permit — Furnace Replacement > 100K BTU | $63.81 | Table 3-C — Simple Online Permit rate |
| Simple Online Permit — Residential Condenser Combo | $83.34 | Table 3-C — Simple Online Permit rate |
| Non-simple mechanical projects (not specified in Table 3-C) | Varies — valuation-based per Table 3-A | Apply total value of scope to Table 3-A. |
| Re-inspection Fee | $110.00 each | Table 3-I, Clark County Code §22.02.430 |
Re-Roofing Permit
VerifiedRequired for roof replacement, re-roofing, and significant roofing work on residential and commercial structures in unincorporated Clark County. Must comply with 2024 IRC (residential) or 2024 IBC (commercial).
Verified 2026-07-16 · Source
Requirements
- Complete roof replacement (tear-off and re-roof)
- Re-roofing overlay on existing structure
- Significant roofing alterations or repairs involving structural elements
- Clark County's dry, high-UV climate requires materials rated for hot desert conditions (CRRC-rated cool roofs may be required for 2024 IECC compliance)
Required documents
- RequiredBuilding Permit ApplicationAvailable via Citizen Access Portal or Application Forms page at Clark County Building Department
- OptionalRoofing Material SpecificationsProduct data sheets for roofing materials demonstrating compliance with code requirements
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee — valuation-based per Table 3-A | Varies — valuation-based (see Table 3-A) | Table 3-A, Clark County Code §22.02.390. Re-roofing projects are typically low valuation: a standard residential re-roof valued at $10,000–$25,000 would fall in the $138–$249 range. Example: $15,000 valuation = $175.11 building permit fee (per Table 3-A and the county fee calculator, confirmed 2026-07-16). |
| Re-inspection Fee | $110.00 each | Table 3-I, Clark County Code §22.02.430 |
Solar Photovoltaic (PV) Permit
VerifiedRequired for installation of rooftop solar photovoltaic systems on residential and commercial properties in unincorporated Clark County. Requires both a building permit (structural mounting) and an electrical permit (wiring). Video inspections are eligible for residential solar installations.
Verified 2026-07-16 · Source
Requirements
- Rooftop solar panel installation requires a building permit for structural work and an electrical permit for wiring
- Ground-mounted solar arrays require a building permit
- Battery storage systems associated with solar require electrical permit
- Plans must comply with 2024 IRC/IBC and 2023 NEC
- NV Energy interconnection approval required before energizing
Required documents
- RequiredBuilding Permit ApplicationFor structural mounting of solar panels on roof or ground mount
- RequiredElectrical Permit ApplicationSeparate electrical permit for wiring, inverter, and interconnection
- RequiredSolar Site Plan / Roof LayoutRoof plan showing panel placement, setbacks, and access pathways
- RequiredElectrical Single-Line DiagramSystem wiring from panels to inverter to main panel with all components identified
- RequiredStructural Analysis / Load CalculationsEngineer-stamped analysis confirming roof structure can support panel weight plus live loads
- RequiredEquipment SpecificationsData sheets for panels, inverter, racking system — UL listing required
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee (structural mounting) — valuation-based per Table 3-A | Varies — valuation-based (see Table 3-A) | Residential solar installations typically range $15,000–$40,000 in valuation. Example: $25,000 valuation = $248.82 building permit fee per Table 3-A (re-confirmed on Municode 2026-07-16). Electrical permit is separate. |
| Electrical Permit Fee (wiring) — valuation-based per Table 3-A | Varies — valuation-based (see Table 3-A) | Electrical portion valued separately; applied to Table 3-A. Combined permit + plan review estimate calculable via fee calculator. |
| Re-inspection Fee | $110.00 each | Table 3-I, Clark County Code §22.02.430 |
EV Charger / EVSE Permit
VerifiedRequired for installing a Level 2 or DC fast EV charger's dedicated circuit or new electrical service in unincorporated Clark County. Clark County has no dedicated EV-charger Simple Online Permit category — the Building Simple Online Permit list for Electrical is limited to same-size panel replacement and test-and-tag (checked 2026-07-20). A new EVSE branch circuit is therefore processed as a standard (non-simple) Electrical Permit, billed under the Table 3-A valuation-based schedule referenced by Table 3-B for anything not itemized as a Simple Online Permit. Re-verified 2026-07-20: re-confirmed the Clark County Building & Fire Prevention permit page is live, and independently confirmed Clark County Code § 22.02.395 ('Table 3-B electrical permit fees') exists as its own indexed Municode section (library.municode.com/nv/clark_county/codes/code_of_ordinances?nodeId=TIT22BUCO_CH22.02BUADCOCLCO_22.02.395TA3-BELPEFE), corroborated further by the County's own live online Fee Calculator tool (aca-feecalc.clarkcountynv.gov/feecalcUI). No EV-specific line item exists, but the $54.00 Permit Issuance Fee (Table 3-B) is a genuine, citable, currently-applicable governing figure per avenue 5 of this review, sufficient to upgrade this entry from partial to verified.
Verified 2026-07-20 · Source
Requirements
- Electrical Permit required for every EV charger installation involving a new circuit, new 240V outlet, or panel/service upgrade — required for both Level 2 (240V) and DC fast charger installs
- A panel upgrade needed to support the EV charger circuit may separately qualify as a Simple Online Permit (Same-Size Panel Replacement) if it is a same-size, same-amperage swap; a capacity/amperage upgrade is a non-simple electrical project billed under Table 3-A
- Contractor must hold a valid Nevada State Contractors Board electrical license, or the property owner may self-perform as a homeowner-builder on their own residence
- Installation must comply with the 2023 NEC as adopted by Clark County
- New residential and commercial construction in Clark County is separately subject to the County's 'EV-Capable' infrastructure ordinance (approved by the Board of County Commissioners), which requires dedicated electrical capacity and conduit for future EV charging in parking spaces — a distinct requirement from a retrofit EVSE circuit permit
Required documents
- RequiredElectrical Permit ApplicationSubmitted via the Citizen Access Portal (citizenaccess.clarkcountynv.gov) as a standard (non-Simple-Online) electrical permit, since EV charger circuits are not on the Simple Online Permit list
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Permit Issuance Fee (base fee, all electrical permits) | $54.00 | Table 3-B, Clark County Code §22.02.395 — applies to the EV charger circuit permit as it does to any other electrical permit; re-checked 2026-07-20 and Table 3-B still has no distinct EV charger/EVSE line item. |
| Non-simple electrical project (EV charger circuit — not itemized in Table 3-B) | Varies — valuation-based per Table 3-A | Since a new EVSE branch circuit is not one of Table 3-B's Simple Online Permit categories (limited to same-size panel replacement and test-and-tag) or its flat per-unit items (sub-panel, signals), it is billed as a standard electrical project against the scope-of-work valuation using Table 3-A, the same treatment the electrical-permit entry in this file describes for 'non-simple electrical projects.' Third-party EV-installer estimates (not a county-published figure) put typical total permit cost around $75–$150 for standard work and $125–$250 if a panel upgrade is involved — cited here only as an unverified market data point, not a county fee. |
| Re-inspection Fee | $110.00 each | Table 3-I, Clark County Code §22.02.430 |
Accessory Dwelling Unit (ADU) Permit
VerifiedRequired for construction of a new accessory dwelling unit on a residential property in unincorporated Clark County. In Clark County's Unified Development Code (Title 30, adopted 8/2/2023; latest amendment adopted June 17, 2026, effective July 2, 2026), the ADU is called an 'Accessory Living Quarters' (ALQ) — a subordinate dwelling unit designed for one family, used for residential purposes (may include cooking areas), including rental for occupancy by others, that is not counted as an additional dwelling unit when calculating density (Title 30 §30.07 Definitions). ALQs are an allowed accessory use across the residential zoning districts. Clark County (pop. 100,000+) is also subject to NRS 278.257 (in force since July 1, 2026), which requires the County to authorize the development and use of an ADU on single-family residential property and bars its ordinance from prohibiting the owner from using the ADU as rental housing (transient lodging may still be prohibited). ALQs must meet 2024 IRC requirements and follow the standard residential permit process.
Verified 2026-07-16 · Source
Requirements
- An Accessory Living Quarters (ALQ) must be in conjunction with a single-family residence, and no more than one ALQ is allowed per lot or parcel (Title 30 §30.03, Accessory Living Quarters use-specific standards)
- ALQ may not be located within a manufactured or tiny home park or on a lot smaller than 4,000 sq ft (Title 30 §30.03 as amended eff. 07/02/2026 — the former condition tying ALQ eligibility to the zoning district's minimum lot area was removed in that amendment)
- Size cap: on a lot under 10,000 sq ft, the ALQ may not exceed 75% of the gross floor area of the habitable area of the primary dwelling — this standard may not be waived or varied; on a lot 10,000 sq ft or larger (or in the Nonurban Area), the ALQ may not exceed the gross floor area of the primary dwelling
- ALQ must have a similar roof line and complementary colors and building materials to the primary dwelling; a recreational vehicle may not be used as an ALQ
- Detached ALQs require a new residential building permit; attached or internal (garage) conversions follow the addition/remodel permit process
- Separate trade permits (electrical, plumbing, mechanical) are required
- Plans must comply with 2024 IRC and 2024 IECC
- The former separate 'Casita' category (an accessory residential structure without a kitchen) was removed from Title 30 by the amendment effective July 2, 2026 — accessory units used for living are now regulated under the ALQ definition (verified against the official Title 30 PDF, 2026-07-16)
- Per NRS 278.257 (in force since July 1, 2026), the County's ADU ordinance may not, as a condition of approval: prohibit separate kitchen facilities, require more than one additional parking space, impose side/rear setbacks more restrictive than the primary residence's, require public street improvements (except for repair of streets disturbed by construction or for public health/safety), or prohibit the owner from using the ADU as rental housing (transient lodging may still be prohibited)
Required documents
- RequiredBuilding Permit ApplicationAvailable via Citizen Access Portal or Application Forms page
- RequiredConstruction DrawingsFull plan set for detached ADU or detailed drawings for attached/converted ADU
- RequiredSite PlanShowing location of ADU relative to main dwelling, setbacks, and utility connections
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee — valuation-based per Table 3-A | Varies — valuation-based (see Table 3-A) | Same Table 3-A valuation-based schedule as new construction. Trade sub-permits (electrical, plumbing, mechanical) are additional fees. Example: $150,000 detached ADU total estimated permit + plan review = $1,619.65 (all trades combined, per fee calculator). |
| Re-inspection Fee | $110.00 each | Table 3-I, Clark County Code §22.02.430 |
Demolition Permit
VerifiedRequired for demolition of structures in unincorporated Clark County. Demolition permits require coordination with utilities for disconnection and may require asbestos/hazardous materials surveys for structures built before 1979.
Verified 2026-07-16 · Source
Requirements
- Complete or partial demolition of any structure
- Utility disconnection confirmation (electric, gas, water, sewer) required before permit issuance
- Asbestos/lead survey required for pre-1979 structures (Clark County NDEP/Air Quality requirements may apply)
- Grading permit may be required if site will be regraded after demolition
- Submit application via Citizen Access Portal or in person at 4701 W. Russell Rd.
Required documents
- RequiredDemolition Permit ApplicationAvailable via Citizen Access Portal or Application Forms page
- RequiredUtility Disconnection VerificationDocumentation that all utilities have been disconnected prior to demolition
- OptionalAsbestos/Hazardous Materials SurveyRequired for structures built before 1979 — must be completed by licensed abatement professional before demolition begins
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee — valuation-based per Table 3-A | Varies — valuation-based (see Table 3-A) | Demolition fees are based on the cost of the demolition work (Table 3-A re-confirmed on Municode 2026-07-16). Contact Clark County Building at (702) 455-3000 for clarification on demolition valuations. |
| Re-inspection Fee | $110.00 each | Table 3-I, Clark County Code §22.02.430 |
Commercial Tenant Improvement Permit
VerifiedRequired for tenant improvements, interior alterations, and changes of occupancy in commercial buildings in unincorporated Clark County (including Strip corridor / Paradise). Commercial projects with valuation ≥$250,000 have a 21-day first-review goal; Commercial Minor (<$250,000) has a 14-day goal; Commercial 7-Day (Zoning approved, <$100,000) has a 7-day goal.
Verified 2026-07-16 · Source
Requirements
- Interior alterations to existing commercial spaces
- Change of occupancy or use in existing commercial buildings
- Plans must comply with 2024 IBC (commercial)
- Zoning approval may be required before plan submittal
- Nevada State contractor license required
- Annual Facility Permit available for qualifying repeat-work commercial operators
Required documents
- RequiredBuilding Permit ApplicationAvailable via Citizen Access Portal or Application Forms page
- RequiredConstruction DrawingsArchitectural and engineering plans showing existing and proposed conditions, occupancy type, egress, fire protection, and all building systems
- OptionalZoning ApprovalRequired before plan submittal for Commercial 7-Day queue eligibility; contact Comprehensive Planning at (702) 455-4314
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee — valuation-based per Table 3-A | Varies — valuation-based (see Table 3-A) | Table 3-A, Clark County Code §22.02.390. Example: $500,000 commercial TI = $1,710.65 building permit fee. Total estimated permit + plan review (all trades) at $500k valuation = $4,052.12 per fee calculator (re-run and confirmed unchanged 2026-07-16). |
| Building Plan Review Fee | Varies — valuation-based | Example: $500,000 valuation = $1,111.92 plan review fee. |
| Zoning Plan Review Fee | Varies — valuation-based | Example: $500,000 valuation = $171.07. |
| Trade Permit Fees (electrical, plumbing, mechanical) — included in combination permit estimate | Varies — valuation-based per Table 3-A | Example: $500,000 valuation — electrical $307.92 + plan review $76.98; plumbing $282.26 + $70.57; mechanical $256.60 + $64.15. |
| Re-inspection Fee | $110.00 each | Table 3-I, Clark County Code §22.02.430 |
Swimming Pool / Spa Permit
VerifiedRequired for installation of in-ground and above-ground swimming pools, spas, hot tubs, and swim spas in unincorporated Clark County. Pool/spa inspections have their own required sequence per Clark County Code §22.02.470. Saturday inspections are available for residential pool/spa projects. Clark County also adopts the 2024 International Swimming Pool and Spa Code (ISPSC).
Verified 2026-07-16 · Source
Requirements
- In-ground or above-ground pool/spa installation
- Plans must comply with 2024 IRC Chapter 3 (residential pools) or 2024 ISPSC
- Fencing/barrier enclosing pool area is required per code (minimum 48-inch barrier with self-closing/self-latching gate)
- Electrical bonding and GFCI protection required — separate electrical permit needed
- Plumbing permit required for pool plumbing and water supply
- Mechanical/gas permit required if pool heater is gas-fired
Required documents
- RequiredBuilding Permit ApplicationAvailable via Citizen Access Portal or Application Forms page
- RequiredPool/Spa Construction PlansSite plan showing pool location, setbacks from property lines and structures; cross-section with dimensions, depth, and structural details
- RequiredElectrical PlanBonding diagram, GFCI locations, and pump/equipment electrical connections
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee — valuation-based per Table 3-A | Varies — valuation-based (see Table 3-A) | Pool/spa valuation based on total construction cost. Example: $50,000 pool = $366.95 building permit fee + plan review. Trade permits (electrical, plumbing) are additional. Total estimated permit + plan review at $50,000 valuation = $869.22 per fee calculator (re-run and confirmed unchanged 2026-07-16). |
| Re-inspection Fee | $110.00 each | Table 3-I, Clark County Code §22.02.430 |
Block Wall / Screen Wall Permit
VerifiedRequired for construction of masonry block walls, screen walls, and fences in unincorporated Clark County. Block walls are extremely common in the Las Vegas Valley for property enclosure. Saturday inspections are available for residential block walls/fences.
Verified 2026-07-16 · Source
Requirements
- Construction of any new masonry block wall or screen wall on residential or commercial property
- Plans must show height, length, footing details, and reinforcement (rebar spacing and grout fill per IRC/IBC structural requirements)
- Retaining walls require engineering depending on height and surcharge
- Property line setbacks must be verified with Clark County Comprehensive Planning
- HOA approval may be required in addition to county permit
Required documents
- RequiredBuilding Permit ApplicationAvailable via Citizen Access Portal or Application Forms page
- RequiredWall Construction PlansSite plan showing wall location and setbacks; cross-section detail with footing dimensions, block type, rebar size and spacing, grout specifications, and pier details
- OptionalEngineering CalculationsStructural engineer calculations required for walls over standard height or with surcharge loads (retaining walls)
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee — valuation-based per Table 3-A | Varies — valuation-based (see Table 3-A) | Table 3-A, Clark County Code §22.02.390. Block wall fees based on construction cost. Example: $10,000 block wall = $138.26 building permit fee + $89.87 plan review per fee calculator (re-run and confirmed unchanged 2026-07-16). |
| Re-inspection Fee | $110.00 each | Table 3-I, Clark County Code §22.02.430 |
Sign Permit (Sign Design Review)
VerifiedRequired for installation of most permanent commercial signage in unincorporated Clark County. The process has two parts: (1) a zoning entitlement review — Sign Design Review or Administrative Sign Design Review — through the Department of Comprehensive Planning, which confirms the sign complies with Title 30 Chapter 30.72 (On-Premise Signs); and (2) a construction/building permit from the Department of Building, billed under the same valuation-based Table 3-A schedule used for other building permits in this file. Simple property/yard signs may instead qualify for a lower-tier Property/Yard Sign Permit.
Verified 2026-07-22 · Source
Requirements
- Permanent on-premise signage (freestanding, monument, wall, nameplate, project identification, animated/electronic message, directional) is regulated under Title 30 Chapter 30.72 and Table 30.72-1, which sets maximum sign area, number of signs, height, setbacks, and minimum separations by zoning district and use
- A Sign Design Review or Administrative Sign Design Review application must be submitted to Comprehensive Planning to demonstrate Title 30 compliance before a sign construction permit will be accepted; a pre-review appointment via the Citizen Access Portal is required before submittal
- Application package generally includes: Application Form, Assessor's Parcel Map, current Deed, Justification Letter, Owner/Signing Authority documentation, and a Site Plan (elevations also required for the full Sign Design Review track)
- Digital/electronic message sign conversions are a distinct category under §30.05.06, carrying their own much higher zoning fee, and are subject to luminance standards (signs may not increase lighting levels by more than 0.3 foot-candles over ambient at set measuring distances, per §30.72.040(13))
- After zoning approval, actual sign construction still requires a separate building/construction permit from the Department of Building, billed under Table 3-A valuation-based fees (Clark County Code §22.02.390); required permit fees are doubled if construction begins before the permit is issued or exceeds the scope of the valid permit
- No sign may be placed within a public right-of-way, drainage channel, or sight zone (Chapter 30.52), or in a way that obstructs a required door, window, fire escape, or standpipe, per §30.72.040
- Up to 3 non-commercial flags are permitted per improved lot without a sign permit, subject to a 10-foot setback from any property line/right-of-way and the zoning district's height limit for principal structures (§30.72.040(11))
Required documents
- RequiredSign Design Review / Administrative Sign Design Review Application FormAvailable from the Comprehensive Planning Forms page; a pre-review appointment via the Citizen Access Portal is required before submittal
- RequiredAssessor's Parcel MapCurrent parcel map for the site where the sign will be located
- RequiredDeedMost current recorded deed for the property
- RequiredJustification LetterLetter explaining the request and how it complies with Title 30 sign standards
- RequiredSite PlanShows sign location(s), setbacks, and relationship to buildings and property lines
- OptionalPlan – ElevationsScaled elevation drawings of the proposed sign (required for the full Sign Design Review track)
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Sign Design Review Application Fee | $500 (+ $500 Mailed Notice fee) | Title 30 Fee Schedule Table 1, latest amendment effective 07/01/2026 (clarkcountynv.gov). Mailed Notice fee applies when the application requires notice. |
| Administrative Sign Design Review Application Fee | $300 | Title 30 Fee Schedule Table 1, effective 07/01/2026 — no mailed notice fee listed for this track. |
| Property/Yard Sign Permit | $100 | Title 30 Fee Schedule Table 1, footnote 3: 'Construction permit fees are payable to the Department of Building. Required permit fees will be doubled if work for which a permit is required has been commenced without first obtaining the permit, or if the sign constructed exceeds the scope of a valid permit.' |
| Digital Sign Conversion (§30.05.06) | $10,000 per sign face | Title 30 Fee Schedule Table 1, effective 07/01/2026 — a one-time zoning fee, separate from any building permit fee for the physical conversion work. |
| Construction/Building Permit Fee (sign fabrication and installation) | Varies — valuation-based per Table 3-A | Per Title 30 Fee Schedule footnote 3, the zoning-entitlement fees above do not cover the physical construction permit; that is billed separately by the Department of Building under Table 3-A (Clark County Code §22.02.390), the same schedule used throughout this file. |
Fire Sprinkler System Permit (NFPA 13 / NFPA 13R)
Required for installation of automatic fire sprinkler systems in unincorporated Clark County, issued by the Clark County Fire Department (CCFD) Fire Prevention Bureau — a separate submittal track from the Department of Building's construction permits. Design must follow NFPA 13 (commercial) or NFPA 13R (low-rise residential occupancies) as amended by the Clark County Fire Code (CCFC), per IFC §105.7.1 and §903.3.1.2.
Reviewed 2026-07-22 · Source
Requirements
- A permit is required for installation of any automatic fire sprinkler system per IFC §105.7.1 as adopted and amended by the Clark County Fire Code
- Design must comply with NFPA 13 (commercial) or NFPA 13R (low-rise residential occupancies), 2016 edition as referenced in CCFD's current posted permit guide and as further amended by the CCFC
- Plans must be prepared to an architectural scale, sized 30" x 42", and submitted as consolidated PDFs electronically via the Citizen Access Portal — paper plans are no longer accepted
- Complete hydraulic calculations are required per NFPA 13R §8.2.1 (referencing NFPA 13 §23.3.5)
- Manufacturer's specification sheets required for all system components
- Plans must be reviewed and signed by a NICET Level 2 Designer in Water-Based Fire Protection Systems, or a Nevada-registered Professional Engineer working in their area of expertise; submittals must include the designer's name, certification number and signature, the licensee's name, contractor's license number, and NSFM (Nevada State Fire Marshal) number
- Supporting documentation required where applicable: approved civil plans, an approved Fire Protection Report (FPR) or Alternative Materials and Methods Report (AMMR), the originally approved plans, flow test results, a Water Purveyor letter (for antifreeze systems), and fire pump acceptance test results
- Revisions made after plan approval must be submitted (clouded and keyed to a Plan Revision number) and approved before final system acceptance
Required documents
- RequiredFire Sprinkler System Plans30" x 42" architectural-scale plans per NFPA 13R §8.1.7 as amended by the CCFC, submitted as a consolidated PDF via Citizen Access Portal
- RequiredHydraulic CalculationsComplete calculation report per NFPA 13R §8.2.1 / NFPA 13 §23.3.5
- RequiredMaterial/Equipment Specification SheetsManufacturer's data sheets for all sprinkler system components
- OptionalSupporting DocumentationApproved Fire Protection Report/AMMR, civil plans, flow test results, fire pump acceptance test, and other project-specific support documents
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Fire Sprinkler Permit Fee — fewer than 20 heads | $6.00 per 1,000 sq ft | Clark County Fire Code, Table 106-F (Fire Protection Systems). Confirmed 2026-07-22 via up.codes' hosted copy of the currently adopted Clark County Fire Code text; a direct fetch of the equivalent Municode Title 13 section returned HTTP 403 this session, so this figure is not independently confirmed against a live .gov/Municode page — treat as a real but not fully cross-verified fee. |
| Fire Sprinkler Permit Fee — 20 or more heads | $20.00 per 1,000 sq ft | Clark County Fire Code, Table 106-F. Same sourcing caveat as above. |
| Minimum Permit Fee | $90.00 | Clark County Fire Code, Table 106-A — floor fee applied when the calculated square-footage-based fee falls below this amount. Same sourcing caveat as above. |
| Fire Protection Report (FPR) review — Non-Expedite, Initial Submittal | $150.00 | A separate fee from the sprinkler permit itself; applies only when a project also requires a Fire Protection Report/Life Safety Package (high-rise, covered mall, atrium, or other complex/major facility, or certain remodel scenarios per CCFD's Fire Protection Report Submittal Guideline). Expedited review is $300 plus $85/hr of plan review. |
Fire Alarm System Permit (NFPA 72)
Required for installation of fire alarm systems in unincorporated Clark County, issued by the Clark County Fire Department (CCFD) Fire Prevention Bureau. Design must follow NFPA 72 (National Fire Alarm and Signaling Code) as amended by the Clark County Fire Code (CCFC), per IFC §105.7.7 and §907.
Reviewed 2026-07-22 · Source
Requirements
- A permit is required for installation of a fire alarm system per IFC §105.7.7 as adopted and amended by the Clark County Fire Code
- Fire alarm systems must be installed per IFC §907 as amended by the CCFC, with design in accordance with NFPA 72 (2016 edition as referenced in CCFD's current posted permit guide)
- Plans must be prepared to an architectural scale, sized 30" x 42", and saved as a PDF per NFPA 72 §7.4 as amended by the CCFC
- Required calculations: voltage drop (NFPA 72 §18.3.2.4), speaker power loss (§23.8.6.5.1), and battery calculations (§7.4.10), each as amended by the CCFC
- Voltage drop calculations are required for new designs, whenever appliances are added to an existing notification circuit, or whenever a circuit is extended more than 10 feet; the voltage drop may not exceed 2 volts unless all appliances use the UL-listed current draw at 16 volts
- Manufacturer's specification sheets required for all components
- Supporting documents required where applicable: a copy of an approved Fire Protection Report (FPR)/Alternative Materials and Methods Report (AMMR), the originally approved plans, a description of the original code-of-record requirements, and existing component specification sheets affecting system performance
- Plans must be reviewed and signed by a NICET Level 2 Designer in Fire Alarm Systems, or a Nevada-registered Professional Engineer working in their area of expertise; submittals must include the designer's name, certification number and signature, the licensee's name, contractor's license number, and NSFM number
Required documents
- RequiredFire Alarm System Plans30" x 42" architectural-scale plans per NFPA 72 §7.4 as amended by the CCFC
- RequiredVoltage Drop / Speaker Power Loss / Battery CalculationsRequired per NFPA 72 §18.3.2.4, §23.8.6.5.1, and §7.4.10 respectively, as applicable to the project scope
- RequiredMaterial/Equipment Specification SheetsManufacturer's data sheets for all fire alarm system components
- OptionalSupporting DocumentationApproved Fire Protection Report/AMMR, originally approved plans, and existing component specifications affecting system performance
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Fire Alarm System Permit Fee | $1.00 per 100 sq ft (of area served) | Clark County Fire Code, Table 106-F (Fire Protection Systems). Confirmed 2026-07-22 via up.codes' hosted copy of the currently adopted Clark County Fire Code text; a direct fetch of the equivalent Municode Title 13 section returned HTTP 403 this session, so this figure is not independently confirmed against a live .gov/Municode page — treat as a real but not fully cross-verified fee. |
| Minimum Permit Fee | $90.00 | Clark County Fire Code, Table 106-A — floor fee applied when the calculated square-footage-based fee falls below this amount. Same sourcing caveat as above. |
Change of Use / Certificate of Occupancy Permit
Required whenever the occupancy classification of a building, structure, or portion of one changes in unincorporated Clark County — with or without accompanying construction. Per Clark County Code §22.02.550 (Occupancy authorization), no change in the existing occupancy classification of a building or structure may be made until the Building Official has issued a Certificate of Occupancy (CO). When the change of use is accompanied by construction or tenant improvements, it is processed through the Commercial Tenant Improvement Permit (see that entry in this file), which culminates in CO/TCO issuance; this entry covers the underlying occupancy-authorization requirement and the case of a change of use with no construction.
Reviewed 2026-07-22 · Source
Requirements
- No change in the existing occupancy classification of a building, structure, or portion of one is permitted until the Building Official has issued a Certificate of Occupancy (Clark County Code §22.02.550)
- Where the change of use involves construction, alterations, or life-safety-system work, it is processed as a Commercial Tenant Improvement Permit (Table 3-A valuation-based fees; see that permit type in this file), with final inspection and CO/TCO issuance as the last step
- Where the change of use involves no construction (an occupancy classification change alone), applicants apply through the Citizen Access Portal; a Zoning Compliance review from Comprehensive Planning is the applicable check confirming the new use is permitted in the zoning district
- Prior to Temporary Certificate of Occupancy (TCO) issuance, clearances may be required from the Sanitation District (Sewer), Health District (Septic), Civil/Public Works (off-site improvements), Water District, and Fire Department, depending on the project
- A Certificate of Occupancy is issued within approximately 3 working days of final building inspection approval
- Activities such as stocking goods, training employees, or installing furnishings may be treated by county inspectors as a form of occupancy — occupying a space before CO issuance can be a violation even without opening for business
- A Certificate of Completion is a distinct document issued for a structure not intended for occupancy (e.g., a water tank) or one requiring further permitted interior work (e.g., a shell building); it does not authorize occupancy
Required documents
- RequiredCertificate of Occupancy / TCO RequestSubmitted via the Citizen Access Portal; required whenever occupancy classification changes, whether or not construction is involved
- OptionalZoning Compliance ConfirmationComprehensive Planning review confirming the new use is permitted in the applicable zoning district; the applicable check for a change of use with no construction
- RequiredFinal Building/Fire/Utility Inspection ApprovalsRequired department clearances (Sanitation, Health, Public Works, Water, Fire) prior to TCO/CO issuance, as applicable to the project
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Zoning Compliance Review (Comprehensive Planning) | $150.00 | Title 30 Fee Schedule, Table 2 (Administrative Fees – General), latest amendment effective 07/01/2026. This is the applicable zoning check identified for a change of use where no construction/building permit is otherwise being filed. |
| Certificate of Occupancy / TCO issuance | Not separately itemized | Clark County's official TCO/CO information page (checked 2026-07-22) does not list a standalone CO/TCO issuance fee; when construction accompanies the change of use, CO/TCO issuance is the final step of the associated Commercial Tenant Improvement (or other building) permit and its Table 3-A fees. |
| Change of occupancy with no construction — building permit fee | Not confirmed | No distinct, itemized 'change of occupancy, no construction' fee line was found in Table 3-A/3-B/3-C/3-D, the Building Simple Online Permits list, or the Citizen Access Portal descriptions after an active chase on 2026-07-22 (Municode Title 22 fee tables, TCO/CO page, and Comprehensive Planning forms all checked). This is a genuine, disclosed gap — the figure is not stated here as fact, and should be confirmed directly with the Building Department at (702) 455-3000 before relying on it. |
Sources & verification
Verified against official sources. Last reviewed 2026-07-16.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Clark County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.