West Wendover building permits
VerifiedWest Wendover, Nevada — as published 2026-08-26.
Verified 2026-08-21 · Source
Codes adopted
Permit types & fees
Residential Building Permit (Single-Family, Two-Family, Manufactured Home — New Construction)
VerifiedRequired for new construction of single-family, two-family, and manufactured/mobile homes within West Wendover city limits, submitted to and reviewed in-house by the Community Development Department (Planning Desk) against the 2024 IRC/IBC as adopted by Resolution No. 2026-14 (adopted July 21, 2026, rescinding Resolution 2020-17).
Verified 2026-08-21 · Source
Requirements
- Building permit required for new single-family, two-family, or manufactured home construction within city limits, submitted to Community Development (Planning Desk) at West Wendover City Hall
- All permits must be obtained by a Nevada Licensed Contractor, except One or Two Family Dwellings, which may be obtained by the owner-occupant building for personal use (not for lease or resale)
- For new home construction, plans must be stamped and signed by a Nevada Licensed Architect (owner-builder) or by a Nevada Licensed Architect/Contractor (contractor-built)
- Completed Building Permit Application (both pages), drawing sets, and a plot plan showing setback compliance must be submitted
- Verification of property ownership required — the permit applicant must match the property owner of record with the Elko County Assessor/Recorder, or provide written owner authorization if a contractor is pulling the permit
- New residential construction must meet the landscaping requirements of Resolution 2004-18 as a condition of Certificate of Occupancy
- Applicants should check FEMA's Flood Map Service Center (msc.fema.gov/portal) for a FIRMette of the project area; some areas of the city (Sections 7, 8, 17 and 18 of Township 33N, Range 70E) are unmapped and treated as Zone D
- All contractors/sub-contractors must hold a Nevada Contractors Board license for their trade plus a City of West Wendover Business License
- Inspections require 24-hour advance notice to the Building Official or designee; work concealed prior to inspection may need to be re-opened
Required documents
- RequiredBuilding Permit ApplicationCity of West Wendover universal Building Permit Application (July 2020 version), both pages required, submitted in person to Community Development
- RequiredPlot PlanSite/plot plan showing setback compliance, submitted with the Building Permit Application
- RequiredConstruction Drawing SetsStamped/signed drawing sets per the Building Permit Application requirements (Nevada Licensed Architect for new home construction)
- OptionalFEMA FIRMetteFlood Insurance Rate Map excerpt for the project address, generated via the FEMA Flood Map Service Center
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee, Plan Check Fee, Water Impact Fee, Sewer Impact Fee (illustrative example only) | Example for a $200,000 valuation new single-family home: Building Permit Fee $1,553.75; Plan Check Fee $1,009.94; Water Impact Fee $3,715.58; Sewer Impact Fee $2,972.46; Total $9,251.73 | City of West Wendover SF/TF/MH Residential Building Permit Submittal Guide (January 2016), page 5 — explicitly stated as an illustrative example only ('no representation/guarantee made as fees are… Show full citationHideCity of West Wendover SF/TF/MH Residential Building Permit Submittal Guide (January 2016), page 5 — explicitly stated as an illustrative example only ('no representation/guarantee made as fees are based on specific projects'); fees are calculated per-project using a Uniform Building Code valuation formula referencing the ICC Building Valuation Data table, not a fixed published fee schedule. Re-grounded 2026-08-16: this January 2016 guide is STILL the edition the City publishes (Building Permits document folder); all five figures were re-. Internal consistency check: the Plan Check Fee is exactly 65% of the Building Permit Fee ($1,009.94 / $1,553.75), the conventional UBC/IBC plan-review ratio, and the four line items sum exactly to the stated $9,251.73 total. The guide's own note says the valuation is compared against the '2007 Building Valuation Data Table' from iccsafe.org, whereas the Commercial Project Development Guide and City Code 7-1-3(A) point to the ICC's CURRENT BVD table — the current-BVD formulation is the one carried forward here. |
Residential Addition / Remodel / Accessory Structure Permit
VerifiedRequired for home remodels, additions, and additional structures (carports, porches, sheds, etc.) on single-family, two-family, and manufactured home properties in West Wendover. Structures 200 sq ft or less within side/rear setbacks may qualify for the Provisional Building Permit process instead of a standard permit.
Verified 2026-08-16 · Source
Requirements
- Completed Building Permit Application (2026 update), drawing sets (or manufacturer brochures/purchase documents for prefabricated sheds/kits), and a plot plan showing setback compliance; the 2026 application specifies one (1) set of plans for one- and two-family additions/remodels (carports, porches, sheds), prepared by a Nevada Licensed Contractor, Nevada Licensed Architect, or the property/home owner
- Verification of property ownership matching the Elko County Assessor/Recorder record, or written owner authorization if a contractor is pulling the permit
- Shed/accessory structures within side and rear yard setbacks, 200 sq ft or less, may instead use the Provisional Building Permit process (see separate permit type) — but standard permits remain required for additions/remodels affecting the primary structure
- All contractors/sub-contractors must hold a Nevada Contractors Board license for their trade plus a City of West Wendover Business License
Required documents
- RequiredBuilding Permit ApplicationCity of West Wendover universal Building Permit Application (2026 update; PDF created 2026-07-28, page footer still reads "July 2020")
- RequiredPlot PlanSite/plot plan showing setback compliance for the addition/remodel/accessory structure
- OptionalManufacturer DocumentationBrochures or purchase documents for prebuilt/kit-form sheds or accessory structures, where applicable
Fee schedule
| Fee type | Amount | Notes |
|---|
Provisional Building Permit (Temporary/Accessory Structures)
VerifiedCovers temporary accessory structures (e.g., sheds) up to 200 sq ft and 12 feet in height, placed within side and rear yard setbacks, potentially over public utility easements. Governed by West Wendover City Code 8-5A-6(C) and reviewed against the 2024 International Codes adopted by Resolution No. 2026-14. Not available for front or exterior side yard setbacks; structures must not include permanent surface treatments.
Verified 2026-08-21 · Source
Requirements
- Structure limited to R-3 occupancy only, maximum 12 feet height, maximum 200 square feet, single story
- Not permitted within front or exterior side yard setbacks
- No permanent surface treatments (concrete pads, asphalt paving, affixed decking) allowed under this permit
- May require review of current or future use of public utility/access easements associated with the property; the City may or may not allow placement over an active/inactive easement
- Site plan (scale no less than 1/8" = 1'), structure design/specifications (installation/erection instructions or cut sheets for prefabricated structures, or detailed construction drawings if built on-site), and engineered drawings/calculations for anchoring or spot footings (stamped by a Nevada licensed Structural Engineer) required
- Permit may be revoked at any time by the City for non-compliance or to protect public utility access/operation
- All permit fees due and payable at time of Provisional Building Permit issuance
Required documents
- RequiredProvisional Building Permit ApplicationCity of West Wendover Provisional Building Permit Application (July 2026 edition), 3 pages, includes legal responsibility/indemnification clauses for placement over utility easements
- RequiredSite Plan DrawingScale no less than 1/8" = 1', showing lot lines, setbacks, existing structures, sidewalks, driveways, retaining walls, fences, utilities, and proposed structure size/location
- RequiredStructure Design and SpecificationsInstallation/erection instructions and cut sheets (prefabricated) or detailed construction drawings (site-built)
- OptionalEngineered Anchoring/Footing CalculationsStamped and signed by a Nevada licensed Structural Engineer or as otherwise required by Community Development
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Structure size 100 sq ft or less | $160.46 | City of West Wendover Provisional Building Permit Application, July 2026 edition (PDF created 2026-07-31), page 1, paragraph 3 — read from a page render on 2026-08-16 and compared line by line… Show full citationHideCity of West Wendover Provisional Building Permit Application, July 2026 edition (PDF created 2026-07-31), page 1, paragraph 3 — read from a page render on 2026-08-16 and compared line by line against the superseded July 21, 2020 edition this record previously cited: all three tiers are unchanged. |
| Structure size 101 to 150 sq ft | $206.66 | City of West Wendover Provisional Building Permit Application, July 2026 edition (PDF created 2026-07-31), page 1, paragraph 3 — read from a page render on 2026-08-16 and compared line by line… Show full citationHideCity of West Wendover Provisional Building Permit Application, July 2026 edition (PDF created 2026-07-31), page 1, paragraph 3 — read from a page render on 2026-08-16 and compared line by line against the superseded July 21, 2020 edition this record previously cited: all three tiers are unchanged. |
| Structure size 151 to 200 sq ft | $252.06 | City of West Wendover Provisional Building Permit Application, July 2026 edition (PDF created 2026-07-31), page 1, paragraph 3 — read from a page render on 2026-08-16 and compared line by line… Show full citationHideCity of West Wendover Provisional Building Permit Application, July 2026 edition (PDF created 2026-07-31), page 1, paragraph 3 — read from a page render on 2026-08-16 and compared line by line against the superseded July 21, 2020 edition this record previously cited: all three tiers are unchanged. |
Commercial / Multi-Family Building Permit
VerifiedRequired for commercial and multi-family development projects in West Wendover. Follows a multi-stage process: conceptual approval, preliminary site plan approval, final site plan approval, and building construction plan review — the latter conducted by West Coast Code Consultants, Inc. (WC3), the City's third-party plan reviewer, in parallel with site plan approval.
Verified 2026-08-21 · Source
Requirements
- Conceptual plan submittal for City Staff/Engineering review and City Council approval — plans prepared by licensed architects/engineers
- Preliminary Site Plan submittal (site layout, landscaping, drainage/grading calculations, utilities, parking/signage, lighting, street access, building elevations, fire hydrant locations, FEMA flood zone determination) for City Staff/Engineering review and City Council approval
- Conditional Use Permit and/or Variance submittals if required by the project
- Final Site Plan approval by Staff/Engineering and City Council
- Building Construction Plans submitted to WC3 (third-party plan reviewer) for code-compliance review; can run in parallel with Site Plan review
- State Fire Marshal review of Fire Protection System Plans, also conducted by WC3 (fees paid directly to WC3 by the developer)
- State of Nevada Public Health Engineering review required if water/sewer service requirements apply
- Execution of bonding/service extension agreements as applicable, then issuance of Building Permit
- Large valuation projects (above $2 million) may require a non-refundable deposit of 50% of the Plan Check Fee before plan review begins
- Project valuation should not be less than the ICC's current Building Valuation Data (BVD) tabulated value
Required documents
- RequiredCommercial Building Application (WC3)West Coast Code Consultants commercial building application, submitted alongside PDF plan sets via email or FTP/DropBox to WC3
- RequiredBuilding Permit ApplicationCity of West Wendover universal Building Permit Application
- RequiredSite Plan and Construction DrawingsBuilding code analysis, site plan, floor/roof plans, exterior elevations, fire-rated construction details, mechanical/electrical drawings, specifications, structural calculations, geotechnical report(s), energy compliance report(s), HVAC load calculations
- OptionalFEMA FIRMetteFlood Insurance Rate Map excerpt for the project area
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee, Plan Check Fee, Water/Sewer Connection and other project-specific fees | Project-specific, based on valuation compared against ICC Building Valuation Data (BVD); no flat published fee schedule found | City of West Wendover Commercial Project Development Guide (September 2020), page 2, re-read from a page render on 2026-08-16 and unchanged. Show full citationHideCity of West Wendover Commercial Project Development Guide (September 2020), page 2, re-read from a page render on 2026-08-16 and unchanged. The Guide also states that Water and Sewer Impact Fees 'are determined by the current impact fee rate schedule' and that applicants should 'request verification of the current rate when submitting the application' — that impact-fee rate schedule is not itself published on the City's website. |
| Large-valuation plan check deposit (projects over $2,000,000 valuation) | Non-refundable deposit equal to 50% of the Plan Check Fee, due at permit application submittal before plan review commences | City of West Wendover Commercial Building Plan Review handout (WC3), page 2, and Commercial Project Development Guide (September 2020), page 4 — both re-read from page renders on 2026-08-16; the $2 million threshold and the 50%-of-Plan-Check-Fee deposit are unchanged. |
Mobile Home Park Residence Permit
VerifiedRequired for moving (installation/removal) mobile/manufactured homes into or out of a Residential Mobile Home Park within West Wendover city limits, governed by West Wendover City Code Title 8, Chapter 5, Section (B) (RMH 1, 2, or 3 zoning) and the Nevada Division of Manufactured Housing.
Verified 2026-08-21 · Source
Requirements
- Mobile Home Moving (Installation, Removal) Application required for units located into a Residential Mobile Home Park within city limits
- Unit type, age, and configuration requirements vary by specific mobile home park — confirm with Community Development and the relevant park
- Any additions/alterations to a mobile home's structure (e.g., adding a carport) require a standard Residential Building Permit Application instead
- Mobile homes/manufactured homes and the parks themselves are governed by the Nevada Division of Manufactured Housing (mhd.nv.gov)
- Inspections for electrical grounding, utility connections, home electrical, and tie-downs are conducted by the City Building Official together with the Nevada Division of Manufactured Housing
Required documents
- RequiredMobile Home Moving (Installation, Removal) ApplicationCity of West Wendover application for locating a mobile/manufactured home into a Residential Mobile Home Park
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Mobile Home Application Fee (flat fee) | $100.00 | City of West Wendover Residential Mobile Home (Mobile Home Park Residence) Permit Submittal Guide, January 2016, page 2 — due and payable at time of permit issuance. This January 2016 guide is still the edition the City publishes, and the flat $100 fee stands. |
Solar PV Installation (Building + Electrical Permit)
West Wendover has no dedicated solar-PV application, submittal guide, or flat fee line published among its Community Development handouts (Commercial Project Development Guide, Residential Building Permit Submittal Guide, or WC3 plan-review packages) — a rooftop or ground-mount solar photovoltaic installation is filed using the same Building Permit Application process as other construction, reviewed against the city's adopted 2024 IBC/IRC/IECC and 2023 NEC (Resolution No. 2026-14, adopted July 21, 2026, which rescinded Resolution 2020-17 and its 2018-code/2017-NEC package), with Building Permit and Plan Check fees calculated from project valuation against the ICC Building Valuation Data (BVD) table — the same general fee mechanism documented throughout this record for every permit type. Commercial-scale solar plan review would route through the city's third-party reviewer, West Coast Code Consultants (WC3), the same as other commercial building/fire-protection plans. Nevada NRS 278.580 authorizes local governments to accommodate solar/wind energy materials and technologies within their adopted building codes.
Reviewed 2026-08-16 · Source
Requirements
- Building permit required for the structural/racking component of a solar installation, submitted to Community Development (Planning Desk) at West Wendover City Hall, using the same Building Permit Application as other residential or commercial construction — no dedicated solar-only form was found published
- Electrical permit required for the PV interconnection, reviewed against the city's adopted 2023 NEC (Resolution No. 2026-14; was the 2017 NEC under the rescinded Resolution 2020-17)
- For a residential system on an owner-occupied one- or two-family dwelling, the owner may pull the permit personally (not requiring a Nevada Licensed Contractor) provided it is for personal use and not for lease or resale, per the city's general owner-builder exemption
- Commercial-scale solar plan review is submitted to West Coast Code Consultants (WC3), the city's third-party commercial plan reviewer, rather than reviewed entirely in-house — WC3 fees are paid directly by the developer/builder, separate from City-collected building-plan-review fees
- Building Permit Fee and Plan Check Fee are calculated by comparing declared project valuation against the current ICC Building Valuation Data (BVD) table — no separate flat solar fee schedule was found published
- NV Energy interconnection approval is required statewide before a grid-tied system can be energized, separate from and in addition to the city's building/electrical permit
Required documents
- RequiredBuilding Permit ApplicationSame general application used for other residential/commercial construction; no dedicated solar-only form is published
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee and Plan Check Fee — valuation-based (ICC BVD table) | Calculated from project valuation compared against the current ICC Building Valuation Data table | No separate flat published fee schedule document exists for any permit type at West Wendover, including solar — the same 'project-specific, valuation-based' structure applies across the city's permits. Show full citationHideNo separate flat published fee schedule document exists for any permit type at West Wendover, including solar — the same 'project-specific, valuation-based' structure applies across the city's permits. Sources: City of West Wendover Commercial Project Development Guide (September 2020), page 2, and SF/TF/MH Residential Building Permit Submittal Guide (January 2016), page 5 (showpublisheddocument/2723 and /2707). Neither contains a percentage-of-valuation rate table or a flat solar fee line. The codified fee authority is City Code 7-1-3(A) — where a building permit is required under the IBC, 'fees shall be set as provided in the international building code (IBC)' — with valuation floored at the ICC BVD tabulated value. |
EV Charger Installation (Building + Electrical Permit)
VerifiedWest Wendover has no dedicated EV-charger/EVSE application, submittal guide, or flat fee line published among its Community Development handouts — an EV charging station (Level 2 or DC fast charger) is filed using the same Building Permit Application process as other construction, reviewed against the city's adopted 2024 IBC/IRC/IECC and 2023 NEC (Resolution No. 2026-14, adopted July 21, 2026, which rescinded Resolution 2020-17 and its 2018-code/2017-NEC package), with Building Permit and Plan Check fees (where a new structure/canopy or panel upgrade tied to a building addition is involved) calculated from project valuation against the ICC Building Valuation Data (BVD) table — the same general fee mechanism documented throughout this record for every permit type, including solar-pv-permit. Commercial-scale EV charging installations (e.g., a multi-port charging hub) would route through the city's third-party reviewer, West Coast Code Consultants (WC3), the same as other commercial building/electrical plans.
Verified 2026-08-16 · Source
Requirements
- Electrical permit required for the charger circuit/wiring/interconnection, submitted to Community Development (Planning Desk) at West Wendover City Hall, using the same Building Permit Application as other residential or commercial construction — no dedicated EV-charger-only form was found published
- Building permit additionally required if the installation includes a new canopy, carport, or structural mounting component
- For a residential charger on an owner-occupied one- or two-family dwelling, the owner may pull the permit personally (not requiring a Nevada Licensed Contractor) provided it is for personal use and not for lease or resale, per the city's general owner-builder exemption
- Commercial-scale EV charging installations are submitted to West Coast Code Consultants (WC3), the city's third-party commercial plan reviewer, rather than reviewed entirely in-house — WC3 fees are paid directly by the developer/builder, separate from City-collected building-plan-review fees
- Building Permit Fee and Plan Check Fee (where applicable) are calculated by comparing declared project valuation against the current ICC Building Valuation Data (BVD) table — no separate flat EV-charger fee schedule was found published
- NV Energy coordination/interconnection approval may be required for a service or panel upgrade tied to a Level 2 or DC fast charger installation, separate from and in addition to the city's building/electrical permit
Required documents
- RequiredBuilding Permit ApplicationSame general application used for other residential/commercial construction; no dedicated EV-charger-only form is published
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee and Plan Check Fee — valuation-based (ICC BVD table) | Calculated from project valuation compared against the current ICC Building Valuation Data table | West Wendover publishes no separate flat fee schedule document for any permit type, including EV charging; Show full citationHideWest Wendover publishes no separate flat fee schedule document for any permit type, including EV charging; fees are project-specific and valuation-based across permit types here. Per the City of West Wendover Commercial Project Development Guide (September 2020), page 2, and the SF/TF/MH Residential Building Permit Submittal Guide (January 2016), page 5, no percentage-of-valuation multiplier table and no flat fee schedule is published anywhere on the City's site beyond the ICC BVD valuation mechanism. The codified authority is City Code 7-1-3(A) — where a building permit is required under the IBC, 'fees shall be set as provided in the international building code (IBC)'. Water and Sewer Impact Fees are separately set by 'the current impact fee rate schedule', which the City does not publish online; verify the current rate with Community Development at application time. |
Sign Permit (On-Premises Signs)
VerifiedRequired before erecting, enlarging, altering (beyond normal maintenance), or relocating any on-premises sign within West Wendover city limits, per City Code Title 7, Chapter 4 (Sign Code), Section 7-4-9. The City has separately adopted the Uniform Sign Code recommended by the International Conference of Building Officials (Section 7-4-1), with Chapter 4 controlling wherever it conflicts with that adopted code. Off-premises signs (billboards/outdoor advertising) are governed by a distinct, more restrictive permit process under Sections 7-4-12 through 7-4-19, not covered by this entry.
Verified 2026-08-21 · Source
Requirements
- Permit required before any person erects, enlarges, alters (except for normal maintenance), or relocates a sign within city limits, per City Code 7-4-9(A)
- Application for a sign permit must be made on City-provided forms and include: name, address, telephone number, and signature of the property owner; name/address/phone of the applicant (sign owner); name/address/phone of the contractor if applicable; a plot plan showing parcel boundaries and the location of the sign(s), other structures, parking, and landscaping; drawings of the proposed sign(s) showing design, dimensions, mounting height, materials, and structural details; drawings of all existing signs on the site showing their sizes and locations; and any other information deemed necessary by the building official, per City Code 7-4-9(B)
- Sign permit is issued by the building official, city clerk, or their representative once all Chapter 4, Uniform Sign Code, and City building code requirements are satisfied and fees are paid, per City Code 7-4-9(C)
- Signs subject to this chapter are inspected by City inspectors for compliance, per City Code 7-4-9(E)
- A permit issued in error or based on a falsified application may be revoked, and a sign erected under such a permit may be ordered removed at the owner's expense, per City Code 7-4-9(F)
- Off-premises signs (billboards, outdoor advertising not related to the on-site business) require a separate permit under City Code 7-4-14 and may additionally require a Conditional Use Permit depending on location, per City Code 7-4-16 — confirm which category applies before applying
Required documents
- RequiredSign Permit ApplicationCity-provided application form per City Code 7-4-9(B); no dedicated PDF of this form was located among the Community Development documents currently published online — confirm the current form directly with Community Development
- RequiredPlot PlanShows parcel boundaries, sign location(s), other structures, parking, and landscaping, per City Code 7-4-9(B)(4)
- RequiredSign Design DrawingsDesign, dimensions, mounting height, materials of construction, and structural details of the proposed sign(s), per City Code 7-4-9(B)(5)
- OptionalExisting Sign DrawingsDrawings showing the sizes and locations of all existing signs already on the site, per City Code 7-4-9(B)(6)
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Sign Permit Fee (valuation-based) | Based on the valuation of the sign(s) to be constructed, per the International Building Code fee schedule, or a minimum of $50.00, whichever is greater | West Wendover City Code 7-4-9(D) (Ord. 96-11, 12-17-1996; Show full citationHideWest Wendover City Code 7-4-9(D) (Ord. 96-11, 12-17-1996; amd. Ord. 2005-07, 12-20-2005), as codified by American Legal Publishing at code edition '2024 S-4 (current)', current through Ord. 2024-03, passed 8-20-2024. The $50.00 minimum and the valuation/IBC-schedule formula stand as written in that codified text, and no ordinance amending 7-4-9 has been adopted since Ord. 2005-07. |
| Unpermitted Sign Enforcement Penalty (not a permit fee) | $100.00 (first offense); $250.00 (second offense); $500.00 (third offense); $1,000.00 (each offense after the third) | West Wendover City Code 7-4-9(G) — penalty for erecting, altering, enlarging, or relocating a sign without a valid sign permit; Show full citationHideWest Wendover City Code 7-4-9(G) — penalty for erecting, altering, enlarging, or relocating a sign without a valid sign permit; sign is also subject to removal at the owner's expense. Re-read on 2026-08-16 at code edition '2024 S-4 (current)': all four penalty amounts ($100.00 / $250.00 / $500.00 / $1,000.00) are unchanged, still traceable to Ord. 96-11, 12-17-1996. |
Fire Sprinkler and Fire Alarm System Permit (Fire Protection System Plan Review)
West Wendover does not organize fire sprinkler and fire alarm permitting into separate city-issued products, and does not operate its own in-house fire-prevention/plan-review bureau. Fire protection system plans (sprinkler and alarm) for commercial and multi-family construction are instead submitted to West Coast Code Consultants, Inc. (WC3), the City's third-party plan reviewer, which also conducts the Nevada State Fire Marshal review on the City's behalf — the same routing already documented for general commercial building-code review in the commercial-building-permit entry. WC3's Fire Marshal review fees are paid directly to WC3 by the developer/builder, separate from City-collected fees. The City's own Fire Department (1113 N. Gene L. Jones Way, (775) 664-2274) is presented as an emergency-response/suppression department; it publishes no separate fire-sprinkler/fire-alarm permit application, fee schedule, or in-house plan-review process of its own.
Reviewed 2026-08-21 · Source
Requirements
- Fire protection system plans (sprinkler and/or alarm) for commercial and multi-family construction are submitted to West Coast Code Consultants, Inc. (WC3), the City's third-party plan reviewer — the same firm and submission channel used for general commercial building-code plan review — rather than to an in-house City fire-prevention bureau
- WC3 conducts the Nevada State Fire Marshal review of fire protection system plans on the City's behalf. Per WC3's Nevada State Fire Marshal Plan Review handout for West Wendover (page 2, read from a page render on 2026-08-16): 'The plan review fee is taken from the SFM Fee Schedule (see attached) and is based on the project valuation. For fire sprinkler submittals, fire alarm submittals, or tenant finishes the valuation is taken as the Contractor's actual bid. For non-tenant finish building plan submittals the valuation is... obtained using the International Code Council's current Building Valuation Data (BVD). All plan review fees must be paid to WC3 prior to obtaining a permit from the City.'
- Fire protection systems must comply with the City's adopted 2024 International Fire Code (IFC), together with all appendices, and National Fire Protection Association (NFPA) standards as adopted by the State of Nevada, per City Code Title 7, Chapter 1 and Resolution No. 2026-14 (adopted July 21, 2026, rescinding Resolution 2020-17 and its 2018 IFC)
- The City of West Wendover Fire Department (1113 N. Gene L. Jones Way) is an emergency-response/suppression department; its published city webpage lists no separate fire-sprinkler/fire-alarm permit application, fee schedule, or in-house plan-review process distinct from the WC3/State Fire Marshal channel used for commercial construction
- No stand-alone residential fire-sprinkler or fire-alarm permit process or fee schedule was found published; residential fire sprinkler requirements (where triggered by the adopted 2024 IRC/IFC) would be reviewed as part of the standard Residential Building Permit process already documented elsewhere in this record
Required documents
- RequiredFire Plan Review Application (WC3)West Coast Code Consultants 'Nevada State Fire Marshal Plan Review for the City of West Wendover' handout, with the 'City of West Wendover - Fire Review Application' attached as page 3 of the PDF. Referenced in the City's Commercial Project Development Guide and in the 2026 Building Permit Application.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| WC3 Fire Marshal / Fire Protection System Plan Review Fee | Set by the Nevada State Fire Marshal (SFM) Fee Schedule and based on project valuation — for fire sprinkler, fire alarm and tenant-finish submittals the valuation is the contractor's actual bid; for non-tenant-finish building plan submittals it is the ICC Building Valuation Data tabulated value. Paid directly to WC3 before the City will issue a permit. No dollar figure is published in the City's or WC3's West Wendover materials. | Sources: the WC3 'Nevada State Fire Marshal Plan Review for the City of West Wendover' handout (showpublisheddocument/2709), page 2, section 'Plan Review Fee'; Show full citationHideSources: the WC3 'Nevada State Fire Marshal Plan Review for the City of West Wendover' handout (showpublisheddocument/2709), page 2, section 'Plan Review Fee'; and the City of West Wendover Commercial Project Development Guide (September 2020), page 4 ('Fees for Fire Marshal Review are completed directly between the developer/builder and WC-3'). The dollar amount is not published: the handout says the SFM Fee Schedule is 'attached', but the three-page PDF contains no fee schedule attachment (page 1 submittal requirements, page 2 process, page 3 the Fire Review Application form), and no SFM fee schedule is published on the City's site. The governing schedule is the State Fire Marshal's, adopted under NAC 477 — obtain the current figure from WC3 or the SFM. |
Certificate of Occupancy / Change of Use
West Wendover has no separately codified 'change of use' ordinance and no standalone Certificate of Occupancy application distinct from the standard Building Permit process. City Code 7-1-3(B) defines an 'ACTIVE BUILDING PERMIT' as 'any building permit issued for which there has not been a certificate of occupancy granted,' confirming that a Certificate of Occupancy is issued as the closing step of a Building Permit under the adopted IBC framework already documented throughout this record, not as its own separate permit type. A change in the use or occupancy classification of an existing building would be handled under the applicable provisions of the adopted 2024 International Building Code and, where relevant, the adopted 2024 International Existing Building Code (IEBC), via a (new or amended) Building Permit Application, rather than through any dedicated 'change of use permit' form published by the City.
Reviewed 2026-08-16 · Source
Requirements
- No standalone 'change of use' or 'certificate of occupancy' application form is published separately from the standard Building Permit Application; a Certificate of Occupancy is issued as the closing step of an active Building Permit, per City Code 7-1-3(B)'s definition of 'ACTIVE BUILDING PERMIT' ('any building permit issued for which there has not been a certificate of occupancy granted')
- A change in the use or occupancy classification of an existing building would be reviewed under the City's adopted 2024 International Building Code and 2024 International Existing Building Code (Resolution No. 2026-14, adopted July 21, 2026, rescinding Resolution 2020-17), via a Building Permit Application submitted to Community Development (and, for commercial projects, through West Coast Code Consultants (WC3), the City's third-party plan reviewer) — there is no separate 'change of use permit' product
- For new residential construction, Certificate of Occupancy issuance is expressly conditioned on meeting the landscaping requirements of Resolution 2004-18, per the City's SF/TF/MH Residential Building Permit Submittal Guide (already documented in the residential-building-permit entry)
- For commercial projects, Certificate of Occupancy is issued upon project completion and acceptance of any public improvements dedicated to the City, per the Commercial Project Development Guide (already documented in the commercial-building-permit entry)
- Verification of current occupancy classification and any code-upgrade triggers for a proposed new use should be discussed with Community Development, (775) 664-3081, before submitting a Building Permit Application for a change of use
Required documents
- RequiredBuilding Permit ApplicationSame universal application used for new construction, additions, and (per this finding) a change of use/occupancy — no dedicated change-of-use or certificate-of-occupancy-only form is published
Fee schedule
| Fee type | Amount | Notes |
|---|
Sources & verification
Verified against official sources. Last reviewed 2026-08-21.
Fee schedules
Applications & forms
Codes & ordinances
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the West Wendover building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.