Skip to main content
PermitBase

Version history — West Wendover, Nevada

This is PermitBase’s own verified record for West Wendover, reconstructed from this dataset’s version-controlled history. Each version below reflects what our record stated as of that date — it is not a warranty of what West Wendover’s actual law was at that time.

Permanent link to today’s record

/nevada/elko-county/west-wendover/as-of/2026-08-26/

Look up a specific date

Pick a date and we’ll show you the record as it stood then.

All versions

  • 2026-08-26Current record
  • 2026-08-16Superseded
    • West Wendover, Nevada — adopted-codes record updated
    • West Wendover, Nevada — Fire Sprinkler and Fire Alarm System Permit (Fire Protection System Plan Review) fee record updated: Not independently confirmed — no specific dollar figure could be freshly verified → Set by the Nevada State Fire Marshal (SFM) Fee Schedule and based on project valuation — for fire sprinkler, fire alarm and tenant-finish submittals the valuation is the contractor's actual bid; for non-tenant-finish building plan submittals it is the ICC Building Valuation Data tabulated value. Paid directly to WC3 before the City will issue a permit. No dollar figure is published in the City's or WC3's West Wendover materials.
    • West Wendover, Nevada — plan-review timeline record updated: 10–15 business days
  • 2026-07-22Superseded
  • 2026-07-20Superseded
    • West Wendover, Nevada — Solar PV Installation (Building + Electrical Permit) record added
    • West Wendover, Nevada — EV Charger Installation (Building + Electrical Permit) record added
  • 2026-07-04Initial record — coverage of West Wendover began