Required for new single-family residential construction anywhere in Lander County, including the unincorporated Town of Battle Mountain, which has no separate municipal building department. Reviewed against the 2018 IBC/IRC package as administered by the Lander County Building & Planning Department, with plan review contracted to a Nevada state-licensed plan-review agency under IBC Sections 105/108/109.

Verified 2026-07-03 · Source

When you need this permit

  • Confirm zoning of the property, FEMA flood zone, lot size, and required setbacks (front/side/rear) per the applicable zone code before applying
  • Complete the Lander County Building Application (Residential and Commercial), including Assessor's Parcel Number (APN), project square footage, type of occupancy, and type of construction
  • Identify owner/builder vs. contractor status; all listed contractors must hold a current Lander County Business License or the application will be denied Owner-builder
  • Submit one full-size plan set (24"x36"), one half-size set (11"x17" acceptable), and a digital (PDF) copy; the full-size set must remain on the job site as the field copy throughout construction
  • Submit a plot plan showing the location of the residence, street/road name, sewer or septic, city water or well, propane tank, and power supply panel, with dimensions, setbacks, and distances
  • Cover sheet must show project identification/location, all persons/firms associated with the drawings, type of construction, square footage, seismic zone (per the county's design criteria), height/number of stories, occupant load, 24-inch minimum frost depth, live/dead load, snow load, and wind load — plans lacking these minimums will not be accepted
  • Residences over 1,500 sq ft, with two or more floors, or with ceiling elevation changes require structural calculations from a Nevada-registered engineer; all basements require structural engineering (waivable if the full plan set is by a licensed architect)
  • Foundation plan showing footings, reinforcement/rebar sizes and locations, anchor bolts, hold-downs, and underfloor ventilation (1 sq in of ventilation per sq ft of underfloor space)
  • Framing plan showing structural members, materials and sizes, attachment methods, and floor/roof construction with truss calculations
  • Complete mechanical, plumbing, and electrical plans showing fixture locations, piping/wiring sizes, load calculations, and utility connection points
  • Provide project valuation (including all finish work, roofing, electrical, plumbing, heating/AC, and other permanent equipment) for fee calculation under 1997 UBC Table 1-A
  • Septic (ISDS) approval and/or community water/sewer 'will serve' letters as applicable; well must be installed prior to final inspection if proposed
  • Post a temporary address before the first inspection and a permanent address (minimum 4 inches high) before final inspection

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit / Plan Review Fee — valuation-basedThe Lander County Building Application states that review fees are based on total project valuation (including all construction, finish work, roofing, electrical, plumbing, heating/AC, elevators, fire-extinguishing systems, and other permanent equipment) per the 1997 UBC Table 1-A. Lander County does not publish the resulting dollar-amount valuation table online; contact the Building Department at (775) 635-2860 for the current computed fee at a specific project valuation. Source: Lander County Building Application (Residential and Commercial), 'Review Fees' section.
Based on project valuation per 1997 UBC Table 1-A; no dollar-figure fee table is published on the county website

Review timeline

Plan reviewLander County (including Battle Mountain)’s published plan-review target
15–21 business days

How long did your Residential Building Permit (New Construction) permit actually take in Lander County (including Battle Mountain)?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Footing/Foundation

    Before concrete pour; verifies footing depth, reinforcement, and anchor bolts/tie-downs

  2. 2

    Underground Utilities

    Water, electrical conduit, and sewer lines before backfill

  3. 3

    Framing, Rough Electrical, Rough Plumbing & Rough Mechanical

    Structural framing, wiring, piping, and mechanical systems verified before wall coverage

  4. 4

    Insulation

    Insulation installed and energy-code items verified before sheetrock

  5. 5

    Final

    All work complete; permanent address (minimum 4 inches high) must be posted before this inspection is called

See the full Lander County (including Battle Mountain) inspection guide — scheduling & re-inspection fees →

Tips

  • Battle Mountain has no separate city building department — Lander County's Building Department at 50 State Route 305 handles all building permitting county-wide, including within Battle Mountain.
  • Non-commercial (residential) plan review typically takes no longer than three weeks per the county's own Plan Submittal Guidelines (2024); commercial plans can take three months or more.
  • The county's own published design-criteria documents are not fully internally consistent on seismic zone designation: the one-page 'Building Code: 2018 IBC' handout lists 'Seismic Zone D' for all of Lander County, while the separate Plan Submittal Guidelines (2024) states 'Seismic zone D2' for engineering-trigger purposes. Confirm the current, precise seismic design category directly with the Building Department before finalizing structural design.
  • Residences over 1,500 sq ft, two-plus stories, or with ceiling elevation changes need a registered engineer's structural calculations; this threshold is notably lower than some neighboring Nevada jurisdictions.
  • All listed contractors must carry a current Lander County Business License at the time of application, not just a state contractor's license — applications with unlicensed contractors are denied outright. Contractor

Frequently asked questions

Lander County (including Battle Mountain) requires a residential building permit (new construction) for: Confirm zoning of the property, FEMA flood zone, lot size, and required setbacks (front/side/rear) per the applicable zone code before applying; Complete the Lander County Building Application (Residential and Commercial), including Assessor's Parcel Number (APN), project square footage, type of occupancy, and type of construction; Identify owner/builder vs. contractor status; all listed contractors must hold a current Lander County Business License or the application will be denied; Submit one full-size plan set (24"x36"), one half-size set (11"x17" acceptable), and a digital (PDF) copy; the full-size set must remain on the job site as the field copy throughout construction; Submit a plot plan showing the location of the residence, street/road name, sewer or septic, city water or well, propane tank, and power supply panel, with dimensions, setbacks, and distances; Cover sheet must show project identification/location, all persons/firms associated with the drawings, type of construction, square footage, seismic zone (per the county's design criteria), height/number of stories, occupant load, 24-inch minimum frost depth, live/dead load, snow load, and wind load — plans lacking these minimums will not be accepted; Residences over 1,500 sq ft, with two or more floors, or with ceiling elevation changes require structural calculations from a Nevada-registered engineer; all basements require structural engineering (waivable if the full plan set is by a licensed architect); Foundation plan showing footings, reinforcement/rebar sizes and locations, anchor bolts, hold-downs, and underfloor ventilation (1 sq in of ventilation per sq ft of underfloor space); Framing plan showing structural members, materials and sizes, attachment methods, and floor/roof construction with truss calculations; Complete mechanical, plumbing, and electrical plans showing fixture locations, piping/wiring sizes, load calculations, and utility connection points; Provide project valuation (including all finish work, roofing, electrical, plumbing, heating/AC, and other permanent equipment) for fee calculation under 1997 UBC Table 1-A; Septic (ISDS) approval and/or community water/sewer 'will serve' letters as applicable; well must be installed prior to final inspection if proposed; Post a temporary address before the first inspection and a permanent address (minimum 4 inches high) before final inspection. If your project isn't listed, confirm with Lander County Building Department at (775) 635-2860 before starting work.

Fees are based on the total valuation of the project (all construction, finish work, electrical, plumbing, heating/AC, and other permanent equipment) using the 1997 Uniform Building Code (UBC) Table 1-A. Lander County does not publish the resulting dollar-figure fee table online; contact the Building Department at (775) 635-2860 for the current computed fee at your project's valuation.

Non-commercial (residential) plans typically take no longer than three weeks for review, though this can vary with the complexity of the structure and design. Commercial plans can take three months or more. Source: Lander County Plan Submittal Guidelines (2024).

You'll need: Lander County Building Application (Residential and Commercial); Lander County Plan Submittal Guidelines (2024). Depending on your project, Lander County (including Battle Mountain) may also ask for: Owner-Builder Affidavit; Building Permit Application Guidelines. See the required-documents checklist on this page for details on each.

Lander County (including Battle Mountain) requires 5 inspection(s) for a residential building permit (new construction), in order: Footing/Foundation, Underground Utilities, Framing, Rough Electrical, Rough Plumbing & Rough Mechanical, Insulation, Final. Schedule each through Lander County Building Department ((775) 635-2860).

Apply through Lander County Building Department at 50 State Route 305, Battle Mountain, NV 89820. Phone: (775) 635-2860, email: buildingassistant@landercountynv.gov. Office hours: Monday–Friday, 7:00 AM – 5:00 PM (closed weekends); during holiday weeks 8:00 AM – 5:00 PM (closed on the actual holiday); inspections are not scheduled on Fridays per the department's posted note; development review meetings available Wednesdays beginning 9:30 AM by arrangement with the office. Official information: https://www.landercountynv.org/departments/building_department.

Lander County (including Battle Mountain), Nevada has adopted: Nevada is a home-rule state for building codes: there is no single mandatory statewide building-code edition — each city and county adopts and amends its own code. The only genuine statewide floor is the energy code, administered per NRS 701.220 (State Office of Energy). Source: Nevada Legislature NRS Chapter 701.; 2018 International Building Code (IBC). Source: Lander County Building & Planning Department 'Building Code: 2018 IBC' design-criteria handout (landercountynv.org).; 2018 International Residential Code (IRC). Source: Lander County Building & Planning Department 'Building Code: 2018 IBC' design-criteria handout.; 2009 Energy Code (IECC lineage) — Lander County's own published design-criteria handout lists '2009 ENERGY CODE' among its currently adopted codes; this is an older edition than Nevada's current statewide floor under NRS 701.220 (2024 IECC), so it should be confirmed directly with the Building Department (775-635-2860) before relying on it. Source: Lander County Building & Planning Department 'Building Code: 2018 IBC' design-criteria handout.; 2018 International Fuel Gas Code (IFGC). Source: Lander County Building & Planning Department 'Building Code: 2018 IBC' design-criteria handout.; 2018 International Fire Code (IFC); Lander County contracts with the Nevada State Fire Marshal to perform fire/life-safety plan review, and all sprinkler system and fire alarm system plans must be submitted through the Lander County Building Department. Source: Lander County Building & Planning Department 'Building Code: 2018 IBC' design-criteria handout and Lander County Plan Submittal Guidelines (2024).; Uniform Plumbing Code (UPC), edition as listed on the county's 'Building Code: 2018 IBC' handout ('UPC UMC'); the handout's Basic Code Requirements document separately cites 'Uniform Plumbing Code' by name for water heater, sewer, and water pipe provisions. The specific UPC edition year is not stated on any published Lander County page — confirm current edition with the Building Department. Source: Lander County Building & Planning Department 'Building Code: 2018 IBC' handout and 'Commonly Asked Basic Code Requirements' handout.; Uniform Mechanical Code (UMC) — cited alongside the UPC on the county's adopted-codes handout ('UPC UMC') and referenced by name in the 'Commonly Asked Basic Code Requirements' handout for heating/cooling appliance installation. Specific edition year not published; confirm with the Building Department. Source: Lander County Building & Planning Department 'Building Code: 2018 IBC' handout.; 2017 National Electrical Code (NEC). Source: Lander County Building & Planning Department 'Building Code: 2018 IBC' design-criteria handout.; ICC A117.1 Accessible and Usable Buildings and Facilities. Source: Lander County Building & Planning Department 'Building Code: 2018 IBC' design-criteria handout.; Lander County Code of Ordinances (Title/Chapter governing Buildings and Construction) is the codified local ordinance; the county's own website links out to the full text hosted on Municode. Lander County's plan-review and fee provisions are administered under IBC Section 105 (Permits), Section 108 (Fees), and Section 109 (Inspections) per the county's own Plan Submittal Guidelines — Lander County has contracted with a Nevada state-licensed agency to perform plan reviews under those IBC sections, and the Building Official may waive plan review and fees when deemed feasible/practical. Source: https://library.municode.com/nv/lander_county/codes/code_of_ordinances (linked from landercountynv.org/businesses/lander_county_code) and Lander County Plan Submittal Guidelines (2024).. Local amendments apply — see the Lander County (including Battle Mountain) overview page for the full list.

No. Battle Mountain is an unincorporated town within Lander County and has no separate municipal building department. All building permits for Battle Mountain and the rest of the county are issued by the Lander County Building Department at 50 State Route 305, Battle Mountain, NV 89820, (775) 635-2860.

Sources & verification

Verified against official sources. Last reviewed 2026-07-03.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Lander County (including Battle Mountain) building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Compare residential building permit (new construction) fees across Nevada

Look up this fee in a different city →

Embed this data card →

Now live

Build your Lander County (including Battle Mountain) project checklist

Describe your project once and get every permit, document, and fee it triggers in Lander County (including Battle Mountain) — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.

Get started →