Building Permit (New Construction — Single/Multi-Family Dwelling) — Pershing County (includes Lovelock), Nevada · Requirements sheet
Verified 2026-07-03 · Source: https://www.pershingcountynv.gov/document_center/Department/Building%20Department/2023-02-28-building-permit-application.pdf
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Building Permit (New Construction — Single/Multi-Family Dwelling) in Pershing County (includes Lovelock), Nevada
Required for new construction of single-family or multi-family dwellings anywhere in Pershing County, including within the Town of Lovelock (which has no separate city building department). Reviewed against the 2018 IRC/IBC with 2018 Northern Nevada Amendments by the Pershing County Building Department.
Verified 2026-07-03 · Source
When you need this permit
- Complete a Building Permit Application in full — incomplete applications will not be accepted
- Submit three (3) sets of construction plans and one (1) copy of a site plan with the application
- Provide the Assessor's Parcel Number and project address/location in county
- Indicate whether construction will be done by the Applicant/Property Owner or a licensed Contractor Contractor
- List all contractors involved (Building/General, Electrical, Plumbing, Mechanical, Concrete/Masonry as applicable), with State License No. and County License No.
- Plans must comply with the 2018 IRC/IBC as adopted by Pershing County (effective 2020) and the 2018 Northern Nevada Amendments
- Applicant must state distance from the project site to the nearest waterway and list other structures on the property
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Inspection scheduling requirement
All inspections must be scheduled 24 hours in advance, per the Building Department webpage. The department's specific named inspection-sequence checklist (e.g., footing, framing, rough-in, final) is not published online as a standalone document distinct from the general permit process.
Tips
- Inspections must be scheduled at least 24 hours in advance — shorter notice is not accommodated per the Building Department's own published policy.
- Three sets of construction plans plus one site plan copy are required for every building permit application — incomplete applications are rejected outright, per the application form.
- The county's own design-criteria figures (10 psf ground snow load / 30 psf roof snow load; 90 mph 3-second gust wind speed, Exposure C; 24-inch frost depth; 1°F winter design temperature; Moderate Zone 2 radon potential; None-to-Slight termite/decay probability) should be used directly in plan submittals for Pershing County — do not assume these match neighboring Nevada counties.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-03.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Pershing County (includes Lovelock) building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Pershing County (includes Lovelock)
Building Permit (New Construction — Single/Multi-Family Dwelling) in other cities
Compare building permit (new construction — single/multi-family dwelling) fees across Nevada →
Look up this fee in a different city →
Now live
Build your Pershing County (includes Lovelock) project checklist
Describe your project once and get every permit, document, and fee it triggers in Pershing County (includes Lovelock) — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →