This is PermitBase’s published record for Reno as of 2026-06-30. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.

Reno building permits

Verified

Reno, Nevada — as published 2026-06-30.

Verified 2026-06-30 · Source

Codes adopted

2024 International Building Code (IBC) — with 2024 Northern Nevada ICC Amendments (NNICC); effective July 1, 20252024 International Residential Code (IRC) — with 2024 Northern Nevada ICC Amendments; effective July 1, 20252024 International Existing Building Code (IEBC) — with 2024 Northern Nevada ICC Amendments2024 International Energy Conservation Code (IECC) — with 2024 Northern Nevada ICC Amendments2024 International Fuel Gas Code (IFGC) — with 2024 Northern Nevada ICC Amendments2024 International Mechanical Code (IMC) — with 2024 Northern Nevada ICC Amendments (commercial/multi-family)2024 Uniform Mechanical Code (UMC) — with 2024 Northern Nevada ICC Amendments (residential single-family)2024 Uniform Plumbing Code (UPC) — with 2024 Northern Nevada ICC Amendments (NOTE: Reno uses UPC, not IPC)2023 National Electrical Code (NEC) — with 2024 Northern Nevada ICC Amendments; effective July 1, 2025Nevada Blue Book (2020) — statewide construction industry reference, incorporates NRS/NAC provisions

Permit types & fees

Residential Building Permit (New Construction)

Verified

Required for all new single-family dwellings, duplexes, townhouses, and other one- and two-family residential construction in Reno. Covers structural construction, framing, envelope, and all associated systems. Governed by the 2024 IRC with 2024 NNICC Amendments.

Verified 2026-06-30 · Source

Requirements

  • All new residential construction requires a building permit and plan review approval
  • Applications submitted electronically via ONE Regional Permitting portal at onenv.us
  • Plans must comply with 2024 IRC with 2024 Northern Nevada Amendments and 2024 IECC
  • Cover page must include all climatic and geographic design criteria per Northern Nevada Amendments
  • Structural calculations required, stamped/signed/dated by engineer of record
  • Energy compliance documents required: REScheck, Manual D, J, and S
  • 10-day review target per Reno permit types document

Required documents

  • RequiredBuilding Permit Application (submitted via onenv.us)Online application through ONE Regional Licensing and Permitting portal
  • RequiredResidential Building Permit Guidelines (updated Jul 1, 2025)Reno's current submittal checklist and plan requirements for residential new construction
  • RequiredSite PlanProperty lines, driveways, easements, setbacks, existing and proposed structures, utilities, drainage, grading — CADD or line-type drawing required (no Google Maps/Google Earth)
  • RequiredConstruction DrawingsFull plan set: foundation, floor, shearwall/roof framing, building sections, mechanical, plumbing, electrical — drawn to scale, stamped by responsible contractor on cover
  • RequiredStructural CalculationsMust include seismic (SDC D2), wind (120 mph Vult), and snow (elevation-based) design criteria; stamped, signed and dated by engineer of record
  • RequiredEnergy Compliance DocumentsREScheck and Manual S, J, D per 2024 IECC
  • RequiredRoof Truss CalculationsTruss design calculations with truss layout and truss verification letter from the engineer of record

Fee schedule

Fee typeAmountNotes
Application Fee$45.00City of Reno FY26/27 Permit Fee Schedule (fees effective July 1, 2026)
Building Permit Fee (Inspection Fee) — valuation $0 to $2,000$26.80 for the first $500 plus $3.55 for each additional $100 or fraction thereofCity of Reno FY27 Permit Fee Table (Valuation Based Permits)
Building Permit Fee — valuation $2,001 to $25,000$80.05 for the first $2,000 plus $16.00 for each additional $1,000 or fraction thereof
Building Permit Fee — valuation $25,001 to $50,000$448.05 for the first $25,000 plus $11.55 for each additional $1,000 or fraction thereof
Building Permit Fee — valuation $50,001 to $100,000$736.80 for the first $50,000 plus $8.05 for each additional $1,000 or fraction thereof
Building Permit Fee — valuation $100,001 to $500,000$1,139.30 for the first $100,000 plus $6.20 for each additional $1,000 or fraction thereof
Building Permit Fee — valuation $500,001 to $1,000,000$3,619.30 for the first $500,000 plus $5.50 for each additional $1,000 or fraction thereof
Building Permit Fee — valuation $1,000,001 and up$6,369.30 for the first $1,000,000 plus $3.75 for each additional $1,000 or fraction thereof
Plan Review Fee65% of the Building Permit FeeFor Masters of Single-Family New Construction within a subdivision: 50% of estimated permit fee; Repeat permits of Masters: 25% of estimated building permit fee
Permit Issuance Fee$45.00
Valuation BasisVaries — new construction and additions use the FY26-27 Building Valuation Table (ICC square-foot construction cost table)Reno uses the ICC building valuation table by occupancy group and construction type to establish project valuation for new construction/additions

Residential Addition / Remodel Permit

Verified

Required for additions, structural alterations, remodels, basement finishes, attached garage conversions, room additions, and other significant alterations to existing one- and two-family dwellings in Reno. Governed by the 2024 IRC with 2024 NNICC Amendments.

Verified 2026-06-30 · Source

Requirements

  • Room additions, structural modifications, and garage conversions
  • Basement finishes involving framing, electrical, plumbing, or mechanical work
  • Attached patio covers (enclosed — valuation based; open — flat rate $135.00)
  • Decks (flat rate $135.00)
  • Retaining walls (flat rate $371 base, residential)
  • Applications submitted via onenv.us portal
  • Plans must show scope, dimensions, structural details, and connection to existing structure
  • Energy compliance may be required for additions that increase conditioned floor area

Required documents

  • RequiredBuilding Permit Application (via onenv.us)Online application through ONE Regional portal; select 'Remodel/Addition' permit type
  • RequiredSite PlanProperty lines, existing structures, proposed addition footprint, setbacks — CADD/line drawing required
  • RequiredConstruction DrawingsPlans showing all relevant aspects of the addition or alteration including framing, MEP as applicable
  • OptionalStructural Calculations (if structural work)Required for structural modifications; must include seismic (D2), wind (120 mph Vult), and snow design criteria

Fee schedule

Fee typeAmountNotes
Application Fee$45.00City of Reno FY26/27 fee schedule
Building Permit Fee — valuation-based (same table as new construction)Varies — valuation-based (see Permit Fee Table)City of Reno FY27 Permit Fee Table — $26.80 base (up to $2k) scaling to $6,369.30 + $3.75/k (over $1M). For remodels/additions, valuation is based on overall construction cost of the project.
Plan Review Fee65% of the Building Permit Fee
Permit Issuance Fee$45.00
Deck (flat rate)$135.00 (includes application and permit issuance fees)City of Reno FY27 Flat Rate Permit Types — residential flat rate
Patio Cover — Open (flat rate)$135.00 (includes application and permit issuance fees)City of Reno FY27 Flat Rate Permit Types
Patio Cover — Enclosed (flat rate)$156.00 (includes application and permit issuance fees)City of Reno FY27 Flat Rate Permit Types
Retaining Wall — residential (flat rate)$371.00 for first segment; $40.00 each additional 50 linear feet (includes application and permit issuance fees)City of Reno FY27 Flat Rate Permit Types
Additional inspection (flat rate permits only)$45.00 per additional inspection

Electrical Permit

Verified

Required for electrical installations, alterations, and service changes in Reno. Governed by the 2023 NEC with 2024 Northern Nevada ICC Amendments. Electricians must hold Reno journeyman cards; licensed electrical contractor or journeyman must be on site for all inspections.

Verified 2026-06-30 · Source

Requirements

  • Service changes and panel upgrades
  • New circuits, rewiring for additions or alterations
  • EV charger (EVSE) installation
  • Generator electrical connections
  • Rewire / service upgrade (flat rate permit type)
  • Receptacles/switches/outlets/fixtures installations (flat rate for first 20 and over 20)
  • Journeyman card required: each individual working in electrical trades must possess a valid pre-apprentice, apprentice, or journeyman certificate from the City of Reno
  • Licensed electrical contractor (license holder) or journeyman electrician must be on site for all inspections per Reno Ordinance No. 6400

Required documents

  • RequiredElectrical Permit Application (via onenv.us)Apply via the ONE Regional portal; select Electrical permit type

Fee schedule

Fee typeAmountNotes
Rewire / Service Upgrade — up to 3,000 sq ft (flat rate)$135.00 (includes application and permit issuance fees)City of Reno FY27 Flat Rate Permit Types — Electrical Permit Types
Rewire / Service Upgrade — greater than 3,001 sq ft (flat rate)$156.00 (includes application and permit issuance fees)
Receptacles/Switch/Outlet/Fixtures — first 20 (flat rate)$135.00 (includes application and permit issuance fees)
Receptacles/Switch/Outlet/Fixtures — over 20 (flat rate)$156.00 (includes application and permit issuance fees)
Service Change — residential EZ permit$88.00City of Reno FY27 EZ Permits — Residential EZ Permits section
Electrical Meter Lockout (EZ permit)$87.00
Application Fee (EZ permits)Included in EZ permit fee — no separate application fee for EZ permits

Plumbing Permit

Verified

Required for plumbing installations, alterations, and repairs in Reno. Governed by the 2024 Uniform Plumbing Code (UPC) — NOT the International Plumbing Code — with 2024 Northern Nevada ICC Amendments. Plumbers must hold Reno journeyman cards.

Verified 2026-06-30 · Source

Requirements

  • Water heater installation or replacement (EZ permit: $45.00)
  • New fixture installations (sinks, toilets, showers)
  • Water or sewer line replacement on private property
  • Re-piping
  • Sewer line replacement (private property only — EZ permit: $90.00)
  • Water line replacement (private property only — EZ permit: $90.00)
  • Journeyman card required for plumbing tradespeople working in Reno

Required documents

  • RequiredPlumbing Permit Application (via onenv.us)Apply via the ONE Regional portal; select Plumbing permit type

Fee schedule

Fee typeAmountNotes
Water Heater Replacement (EZ permit)$45.00City of Reno FY27 EZ Permits — Residential EZ Permits section: 'Water Heater' = $45.00
Sewer Line Replacement — private property (EZ permit)$90.00
Water Line Replacement — private property (EZ permit)$90.00
Lawn Sprinkler (EZ permit)$45.00
Stucco or Siding (if plumbing involved — EZ permit)$87.00
Gas Line (private property — EZ permit)$90.00Gas piping is a fuel gas permit (IFGC) in Reno, typically processed as an EZ permit
Application Fee (EZ permits)Included in EZ permit fee

Mechanical / HVAC Permit

Verified

Required for heating, cooling, ventilation, and fuel gas installations in Reno. Residential single-family uses the 2024 Uniform Mechanical Code (UMC); commercial/multi-family uses the 2024 IMC. Covers furnaces, A/C, heat pumps, ductwork, gas fireplaces, and related equipment.

Verified 2026-06-30 · Source

Requirements

  • Furnace, air conditioner, heat pump replacement or new installation
  • Ductwork installation or significant modification
  • Gas fireplace insert installation (EZ permit)
  • Boiler change-out (EZ permit, size-based)
  • Pool heater (flat rate permit)
  • A/C change-out (EZ permit: $45.00)
  • Rooftop HVAC replacement (EZ permit per commercial, or valuation-based for major commercial)
  • Gas piping systems (EZ permit $90.00 or IFGC permit)

Required documents

  • RequiredMechanical Permit Application (via onenv.us)Online application through ONE Regional portal

Fee schedule

Fee typeAmountNotes
A/C Change-Out (EZ permit)$45.00City of Reno FY27 EZ Permits — Residential EZ Permits
Furnace (replacement — EZ permit)$89.00
Furnace (oil to gas — EZ permit)$133.00
Gas Fireplace Insert (EZ permit)$89.00
Boiler Change-Out — up to 100K BTU (EZ permit)$90.00
Boiler Change-Out — 100K to 500K BTU (EZ permit)$110.00
Gas Line / Gas Piping (EZ permit)$90.00
Gas Piping / System — residential (flat rate)$200.00 (includes application and permit issuance fees)City of Reno FY27 Flat Rate — Gas Permit Types (for larger/new gas systems requiring plans)
Pool Heater (flat rate — commercial or residential)$280.00 (includes application and permit issuance fees)City of Reno FY27 Flat Rate Permit Types
Furnace — commercial, up to 1,000K BTU (flat rate)$246.00 (includes application and permit issuance fees)
Furnace — commercial, over 1,000K BTU (flat rate)$269.00 (includes application and permit issuance fees)

Roofing Permit (Reroof)

Verified

Required for roof replacement (tear-off and reroof) on residential and commercial buildings in Reno. Reroofing is an EZ permit for residential; valuation-based for commercial. Reno's Northern Nevada climate requires awareness of snow load requirements and proper underlayment.

Verified 2026-06-30 · Source

Requirements

  • Complete roof replacement (tear-off and reroof)
  • Re-roofing overlay
  • Residential reroof: EZ permit — no plans required, processed quickly
  • Commercial reroof: valuation-based or EZ permit (one permit per building)
  • Apply via onenv.us

Required documents

  • RequiredRoofing Permit Application (via onenv.us)EZ permit type — no plans required for residential reroof

Fee schedule

Fee typeAmountNotes
Reroof — residential (EZ permit)Valuation-based (see Permit Fee Table) — fee is based on overall construction costCity of Reno FY27 EZ Permits: Reroof = Valuation-based (uses the Permit Fee Table, not a flat rate). Application fee $45.00 + valuation-based permit fee + 65% plan review.
Application Fee$45.00
Permit Issuance Fee$45.00

Solar PV Permit

Verified

Required for installation of rooftop or ground-mounted solar photovoltaic systems on residential and commercial properties in Reno. Processed as a valuation-based permit (Solar PV Systems) requiring plans including structural calculations, electrical design, and equipment specifications.

Verified 2026-06-30 · Source

Requirements

  • Rooftop solar panel installation — single-family and multi-family
  • Ground-mounted solar array installation
  • Battery storage system installation associated with solar
  • Valuation-based permit — both plan review and inspection fees apply
  • Licensed electrical contractor or journeyman required on site for inspections (Reno Ordinance No. 6400)
  • Structural calculations required (roof load analysis including snow 29 psf min and seismic SDC D2)
  • Electrical single-line diagram and load calculations required
  • Plans must be stamped by engineer of record

Required documents

  • RequiredSolar Permit Application (via onenv.us)Apply as 'Solar (PV Systems)' permit type via ONE Regional portal
  • RequiredSolar Permit Guidelines (Jul 1, 2025)Reno's current plan and submittal requirements for solar PV systems
  • RequiredSite PlanShows property lines, existing structures, location/layout of proposed modules, required fire access and pathways — CADD/line drawing required
  • RequiredFraming DetailsSolar racking connections to the roof system; structural plans stamped by engineer
  • RequiredElectrical PlanWire type/sizing, ampacity, de-rating, load calculations; 3-line diagram; min/max overcurrent protection; location of all equipment including AC disconnect
  • RequiredStructural CalculationsFor existing roof structure — stamped verification letter from engineer indicating adequacy (or required modifications); must include seismic (D2), wind (120 mph Vult), and snow (29 psf minimum) design criteria
  • RequiredEquipment SpecificationsManufacturer spec sheets for all equipment (panels, inverter, racking, battery if applicable)

Fee schedule

Fee typeAmountNotes
Application Fee$45.00City of Reno FY26/27 Valuation Based Permit fee structure
Building Permit Fee (Inspection) — valuation-basedVaries — valuation-based per Permit Fee Table (construction cost of solar system)City of Reno FY27 Valuation Based Permit Types: 'Solar (PV Systems) — Single Family Roof Top Mounted' is listed as a valuation-based residential permit
Plan Review Fee65% of the Building Permit Fee
Permit Issuance Fee$45.00

Accessory Dwelling Unit (ADU) Permit

Verified

Required for construction of a new ADU on a residential property in Reno. Reno has adopted an ADU ordinance (Reno Municipal Code Section 18.02 / ADU standards). As of July 1, 2026, NRS 278.257 mandates that Reno (population ≥60k) authorize ADUs and prohibit ordinance restrictions that prevent rental use.

Verified 2026-06-30 · Source

Requirements

  • Property must be a single-family residential lot (zoning allowing ADU per RMC Title 18)
  • Minimum lot size: 5,000 square feet
  • Maximum 1 ADU per property
  • ADU height shall not exceed the height of the existing primary residence
  • Detached ADUs must maintain principal structure setbacks
  • Attached ADUs must comply with single-family residential design standards and dimensional limits (e.g., SF-3 zone: ≤1,600 sq ft or 50% of primary structure, whichever is less — per RMC Tables 3-6 and 3-7)
  • Detached ADUs must be architecturally compatible with primary dwelling (exterior materials, roof pitch, architectural features)
  • 1 designated on-site parking space required
  • Front door of attached ADU shall not face the same street as primary structure's front door
  • Applications submitted via onenv.us; coordinate with City Planning (planning@reno.gov or 775-321-8309) before permit application
  • ADU is classified as a One- or Two-Family Dwelling Unit per the 2024 IRC

Required documents

  • RequiredBuilding Permit Application (via onenv.us)ADU permits follow the same valuation-based residential permit process as new construction
  • OptionalAccessory Dwelling Unit Guide (revised Oct 13, 2025)City of Reno ADU guide covering zoning, development standards, FAQ, fees overview, and process steps
  • RequiredSite PlanProperty lines, existing structures, proposed ADU location, setbacks, parking, utilities
  • RequiredConstruction DrawingsFull architectural/structural plans for the ADU including all applicable 2024 IRC provisions

Fee schedule

Fee typeAmountNotes
Building Permit — valuation-basedVaries — valuation-based using the Permit Fee Table and Building Valuation TableCity of Reno FY27 Valuation Based Permits; same fee structure as new residential construction
Application Fee$45.00
Plan Review Fee65% of the Building Permit Fee
Permit Issuance Fee$45.00
Regional Road Impact FeeApproximately $3,700Per Reno ADU Guide (Oct 2025); subject to change — verify at time of application at rtcwashoe.com
Park FeeApproximately $800–$1,000Per Reno ADU Guide (Oct 2025)
Police Impact FeeApproximately $100–$140
Sewer Connection FeeVaries — typically $8,744–$13,235 depending on ADU size, attached vs. detached, and existing fixturesPer Reno ADU Guide (Oct 2025); verify with Truckee Meadows Water Authority (TMWA) at 775-834-8080

Demolition Permit

Verified

Required for demolition of structures in Reno. Requires a demolition bond of $2,500. A Demolition Checklist and Bond Agreement form must be submitted with the application.

Verified 2026-06-30 · Source

Requirements

  • Demolition bond of $2,500 required
  • Submit Demolition Checklist and Bond Agreement (available at reno.gov building permits page)
  • Utility disconnects (gas, electric, water, sewer) must be verified or arranged prior to demolition
  • Structure demolition permit (plans required, 10-day review) — NOT an EZ permit
  • Interior-only commercial demolition is an EZ permit
  • Apply via onenv.us

Required documents

  • RequiredDemolition Checklist and Bond AgreementRequired form listing utility disconnects, asbestos abatement documentation, and bond agreement
  • RequiredDemolition Permit Application (via onenv.us)Online application through ONE Regional portal

Fee schedule

Fee typeAmountNotes
Demolition Permit (flat rate, includes $2,500 bond requirement)$287.00 (includes application and permit issuance fees)City of Reno FY27 Flat Rate Permit Types — both Residential and Commercial demolition are $287.00 flat rate
Bond$2,500 requiredDemolition bond ($2,500) required per Reno permit requirements — returned after cleanup completion

Commercial Tenant Improvement Permit

Verified

Required for interior remodels, additions, and tenant improvements in commercial, multi-family, apartment, and condo buildings in Reno. Governed by the 2024 IBC with 2024 NNICC Amendments. Valuation-based permit requiring full plan set and plan review.

Verified 2026-06-30 · Source

Requirements

  • Remodel or addition to commercial space, apartments, or condos
  • Plans required with 10-day review target
  • Cover page must include all design criteria per Northern Nevada Amendments
  • Structural, mechanical, plumbing, electrical plans as applicable
  • Fire protection design (fire alarm, sprinkler) reviewed by Reno Fire Department
  • Health department review if food service or healthcare occupancy
  • Apply via onenv.us

Required documents

  • RequiredCommercial Building Permit Application (via onenv.us)Online application through ONE Regional portal — select 'Remodel/Addition' commercial permit type
  • RequiredCommercial Building Permit Guidelines (Jul 1, 2025)Reno's current plan submittal requirements for commercial permits
  • RequiredFull Construction Drawing SetArchitectural, structural, mechanical, plumbing, electrical plans as applicable — stamped by design professional
  • OptionalStructural Calculations (if structural work)Must include SDC D2 seismic, 120 mph Vult wind, and applicable snow loads

Fee schedule

Fee typeAmountNotes
Application Fee$45.00City of Reno FY26/27 Commercial Valuation Based Permit fee structure
Building Plan Review Fee — valuation-basedVaries — valuation-based per Permit Fee Table (construction cost of work)City of Reno FY27 Valuation Based Permits — Commercial Valuation Based Fees
Engineering Plan Review / Inspection Fee$135.00 (per occurrence, hourly rate)Commercial valuation based permits include separate engineering review and inspection fees
Planning Plan Review / Inspection Fee$135.00 (per occurrence, hourly rate)
Building Inspections Fee (Permit Fee) — valuation-basedVaries — valuation-based per Permit Fee Table
Fire Inspection Fee (hourly)$135.00 per hour
Permit Issuance Fee$45.00
Sewer Fixture Count Fee$137.00 (when applicable)

Swimming Pool and Spa Permit

Verified

Required for construction of residential and commercial swimming pools, in-ground spas, and above-ground spas in Reno. Pools are valuation-based permits requiring full plan submittal including structural, electrical, gas, and barrier/fencing details. Prefabricated hot tubs/spas are flat-rate permits.

Verified 2026-06-30 · Source

Requirements

  • In-ground pool / spa: valuation-based permit with plans required (10-day review)
  • Prefabricated hot tub / spa (above-ground, pre-manufactured): flat-rate permit ($177.00)
  • Pool heater: flat rate permit ($280.00) — may be a separate permit from the pool itself
  • Barriers/fencing around pools: required per 2024 IRC Section R326 — must show height, openings, latch details on plans
  • Equipotential bonding detail required
  • Gas piping for pool heater may require separate gas permit
  • Electrical GFCI protection, circuits, and panel load calculations required
  • Northern Nevada Public Health review may apply (per NNPH fees)
  • Apply via onenv.us

Required documents

  • RequiredPool Permit Application (via onenv.us)Online application through ONE Regional portal — select 'Pool & Spa' permit type
  • RequiredResidential Pool Submittal Guidelines (Jul 1, 2025)Reno's checklist for pool permit plan submittals
  • RequiredSite PlanProperty lines, existing structures, pool location, setbacks, barriers and gates
  • RequiredPool Structural PlansStructural calculations required for cast-in-place pool design; manufacturer installation instructions for fiberglass pool
  • RequiredElectrical PlanComplete load calculations for house/pool; electrical circuits, GFCI protection, panel size and location
  • RequiredEquipment SpecificationsManufacturer spec sheets including size (BTUs) for pool heater/equipment

Fee schedule

Fee typeAmountNotes
Swimming Pool / Spa — in-ground (valuation-based)Varies — valuation-based (construction cost); application $45.00 + valuation-based permit fee + plan review (65%) + permit issuance $45.00City of Reno FY27 Valuation Based Permits: 'Swimming Pools & Spas' is a valuation-based residential permit type
Spa / Hot Tub — prefabricated (flat rate)$177.00 (includes application and permit issuance fees)City of Reno FY27 Flat Rate Permit Types: 'Spa/Hot Tub (Prefabricated)' = $177.00
Pool Heater (flat rate)$280.00 (includes application and permit issuance fees)City of Reno FY27 Flat Rate Permit Types

Block / Screen Wall and Fence Permit

Verified

Required for construction of fences and walls (including block walls, screen walls, retaining walls, and rockery walls) in Reno. Governed by Reno Municipal Code Section 18.04.809 (General Standards for Fences and Walls). Residential fences ≤6 ft are typically flat-rate permits; larger or complex walls may be flat-rate or valuation-based.

Verified 2026-06-30 · Source

Requirements

  • All fences and walls in Reno require a permit (Reno Municipal Code Section 18.04.809(g) and Title 14)
  • Fence (residential, ≤6 ft): flat-rate permit
  • Fence (commercial, ≤6 ft): flat-rate permit ($221.50)
  • Fence greater than 6 ft (commercial): flat-rate permit ($586.00)
  • Retaining wall (residential): flat-rate permit ($371 base + $40.00 per additional 50 LF)
  • Retaining wall (commercial): flat-rate permit ($371 base + $40.00 per additional 50 LF)
  • Rockery wall: flat-rate permit
  • Plot plan required showing: existing structures, all easements, location/length/height/materials of fence, gate locations, property lines, adjacent street speed limits
  • Fences 4 ft or less may be placed in front yard; fences over 4 ft not permitted in required front yard (except per specific exceptions)
  • Barbed wire, razor ribbon prohibited in residential zones
  • Vision triangle clearance required per AASHTO standards
  • HOA approval (if applicable) must be provided

Required documents

  • RequiredFence / Wall Permit Application (via onenv.us)Online application through ONE Regional portal — select Fence or Retaining Wall permit type
  • RequiredPlot PlanCADD or line-type drawing showing existing structures, all easements, fence location/length/height/materials, gate locations, property lines, adjacent street info, and HOA approval if applicable
  • OptionalGeneral Standards for Fences and Walls (Jun 1, 2026)Reno's reference document for fence standards per RMC 18.04.809 — review before applying

Fee schedule

Fee typeAmountNotes
Fence — residential (flat rate)$135.00 (includes application and permit issuance fees)City of Reno FY27 Flat Rate Permit Types — Residential Flat Rate: 'Fence' = $135.00
Fence — commercial, 6 ft or less (flat rate)$221.50 (includes application and permit issuance fees)City of Reno FY27 Flat Rate Permit Types — Commercial Flat Rate
Fence — commercial, greater than 6 ft (flat rate)$586.00 (includes application and permit issuance fees)
Retaining Wall — residential (flat rate)$371.00 base + $40.00 per each additional 50 linear feet (includes application and permit issuance fees)City of Reno FY27 Flat Rate Permit Types
Retaining Wall — commercial (flat rate)$371.00 base + $40.00 per each additional 50 linear feet
Rockery Wall — residential (flat rate)$291.00 base + $40.00 per each additional 50 linear feet
Rockery Wall — commercial (flat rate)$291.00 base + $40.00 per each additional 50 linear feet

Sources & verification

Verified against official sources. Last reviewed 2026-06-30.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Reno building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Later version (2026-07-02) →View current record →All versions →

Permalink: /nevada/washoe-county/reno/as-of/2026-06-30/

Snapshot date: 2026-06-30

Commit: 9e5cbba

Reproducible from PermitBase’s version-controlled dataset, commit 9e5cbba.