Skip to main content
PermitBase

Version history — Reno, Nevada

This is PermitBase’s own verified record for Reno, reconstructed from this dataset’s version-controlled history. Each version below reflects what our record stated as of that date — it is not a warranty of what Reno’s actual law was at that time.

Permanent link to today’s record

/nevada/washoe-county/reno/as-of/2026-07-02/

Look up a specific date

Pick a date and we’ll show you the record as it stood then.

All versions

  • 2026-07-02Current record
    • Reno, Nevada — Swimming Pool and Spa Permit fee record updated: Varies — valuation-based (construction cost); application $45.00 + valuation-based permit fee + plan review fee (valuation-based per the Permit Fee Table Schedule) + permit issuance $45.00 → Varies — valuation-based (construction cost); application $45.00 + valuation-based permit fee + plan review (65% of permit fee) + permit issuance $45.00
    • Reno, Nevada — Swimming Pool and Spa Permit fee record updated: Varies — valuation-based (construction cost); application $45.00 + valuation-based permit fee + plan review (65%) + permit issuance $45.00 → Varies — valuation-based (construction cost); application $45.00 + valuation-based permit fee + plan review fee (valuation-based per the Permit Fee Table Schedule) + permit issuance $45.00
  • 2026-06-30Initial record — coverage of Reno began
    • Reno, Nevada — Residential Addition / Remodel Permit fee record updated: Varies — valuation-based (see Permit Fee Table). For remodels/additions, valuation is based on overall construction cost of the project. → Varies — valuation-based (see Permit Fee Table)
    • Reno, Nevada — fee schedule re-verified across 12 permit types