Skip to main content
PermitBase

This is PermitBase’s published record for Albuquerque as of 2026-07-03. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.

Albuquerque building permits

Verified

Albuquerque, New Mexico — as published 2026-07-03.

Verified 2026-07-02 · Source

Codes adopted

2021 New Mexico Commercial Building Code — adopted statewide by the NM Construction Industries Commission (NMAC Title 14), effective in Albuquerque December 14, 20232021 New Mexico Residential Building Code — adopted statewide by the NM Construction Industries Commission (NMAC Title 14), effective in Albuquerque December 14, 20232021 New Mexico Existing Building Code — effective in Albuquerque December 14, 20232020 New Mexico Electrical Code — effective in Albuquerque September 28, 20232021 New Mexico Mechanical Code, including Appendixes A, B, C, and D2021 New Mexico Plumbing Code, including Appendixes A, B, C, D, E, F, I, K, and L2012 New Mexico Swimming Pool, Spa and Hot Tub Code2012 New Mexico Solar Energy Code2021 New Mexico Residential Energy Conservation Code (includes EV-charging-readiness requirements adopted by the Construction Industries Commission, required on new construction starting July 30, 2024)2021 New Mexico Commercial Energy Conservation Code (includes EV-charging-infrastructure parking requirements, required on new construction starting July 30, 2024)2021 New Mexico Earthen Building Materials Code2021 New Mexico Historic Earthen Buildings CodeNew Mexico Boiler Code2023 Uniform Administrative Code of the City of Albuquerque (ROA 1994, Chapter 14, Article 1) — the City's local administrative amendment governing permitting, fees, and inspections; effective February 2, 2024; a 2024 edition (Exhibit A) is the current administrative chapter on file with Building SafetyCity of Albuquerque Ordinance O-2022-024 (Council Bill O-22-23) — adopted the Uniform Administrative Code and technical codes, repealing the prior Chapter 14, Article 1, ROA 1994

Permit types & fees

Residential Building Permit (New Construction)

Verified

Required for new single-family homes, duplexes, and other new residential structures in Albuquerque. Issued and inspected under the City's Uniform Administrative Code, which locally administers the statewide 2021 New Mexico Residential Building Code. Applications are submitted online through the ABQ-PLAN portal.

Verified 2026-07-02 · Source

Requirements

  • All new residential construction requires a building permit and plan review under the Uniform Administrative Code and the 2021 New Mexico Residential Building Code
  • Apply online through the ABQ-PLAN portal (electronic plan review)
  • Submit two sets of plans (or electronic equivalent) drawn to scale showing site plan, foundation plan, floor plan, framing plan, elevations, and wall section details sufficient to demonstrate code compliance (UAC Section 110.3)
  • Building permit can only be issued to a homeowner building their own owner-occupied home or to a New Mexico-licensed contractor (minimum GB-2 classification)
  • All metal/aluminum frame construction plans must be certified by a New Mexico-registered professional engineer

Required documents

  • RequiredBuilding Permit ApplicationSubmitted online through the ABQ-PLAN portal
  • RequiredSite PlanLocation and dimensions of proposed construction, existing buildings, distance from property lines, driveway width and curb cut, directional orientation
  • RequiredFoundation PlanFoundation layout and dimensions, footings, piers, stem walls, reinforcement, perimeter insulation type and R-value
  • RequiredFloor Plan and Framing PlanComplete floor plan for all levels with square footage, and framing plan specifying joists, girders, rafters, truss connectors, and insulation
  • RequiredWall Section Details and ElevationsExterior/interior bearing wall sections, load path connections, roof slope and materials, structural lumber grade/species

Fee schedule

Fee typeAmountNotes
Building Permit Fee (Table 112-A, one- and two-family dwelling regional modifier 0.50 applied to valuation)$23.50 minimum for valuation $1–$2,000; then $23.50 for the first $500 plus $3.05 per additional $100 (to $2,000); $69.25 for the first $2,000 plus $14.00 per additional $1,000 (to $25,000); $391.75 for the first $25,000 plus $10.10 per additional $1,000 (to $50,000); $643.75 for the first $50,000 plus $7.00 per additional $1,000 (to $100,000); $993.75 for the first $100,000 plus $5.60 per additional $1,000 thereafter — modifier of 0.50 applied to the resulting valuation for one- and two-family dwellings2024 City of Albuquerque Uniform Administrative Code, Table 112-A and Section 112.2.1 regional modifier table
Plan Review Fee65% of the building permit fee, paid at time of plan submittalUAC Section 112.3; separate from and in addition to the permit fee
Building valuation basisSet per the ICC Building Valuation Data table scheduled under the Regulation Governing Building Valuation (ROA 1994 § 14-1-2): February 2018 ICC table applies through June 30, 2026; February 2021 ICC table July 1, 2026–June 30, 2027City of Albuquerque Regulation Governing Building Valuation Pursuant to the Uniform Administrative Code, signed by the Chief Administrative Officer following an April 17, 2026 public rulemaking hearing
Re-inspection Fee$47.00 eachUAC Table 112-A, Other Inspections and Fees item 2, per Section 113.5.8
Investigation Fee (work commenced without a permit)Equal to the amount of the permit fee otherwise requiredUAC Section 112.4.2

Residential Addition / Alteration / Remodel Permit

Verified

Required for additions, alterations, and remodels of existing residential structures in Albuquerque, including room additions, garage conversions, and structural remodels. Apply online through ABQ-PLAN.

Verified 2026-07-02 · Source

Requirements

  • Room additions, structural alterations, and remodels of existing single-family and two-family dwellings require a building permit
  • Submit plans drawn to scale showing scope of work and conformance with the Technical Codes and UAC Section 110.3
  • Permit issued only to a homeowner (owner-occupied residence) or a New Mexico-licensed contractor (GB-2 or GB-98 classification)
  • Metal/aluminum frame construction plans must be certified by a New Mexico-registered professional engineer
  • Separate trade permits (electrical, plumbing, mechanical) required for MEP work associated with the addition/remodel

Required documents

  • RequiredBuilding Permit ApplicationSubmitted online through ABQ-PLAN
  • RequiredConstruction DrawingsPlan views at minimum 1/4"=1'-0" scale with sections/details at minimum 1/2"=1'-0" scale, showing scope of work and connection to the existing structure

Fee schedule

Fee typeAmountNotes
Building Permit Fee (Table 112-A, one- and two-family dwelling regional modifier 0.50, including renovations/alterations/additions)Same Table 112-A valuation-based formula as new residential construction, with the 0.50 regional modifier applied to additions, alterations, and renovations of one- and two-family dwellings2024 City of Albuquerque Uniform Administrative Code, Section 112.2.1 and Table 112-A
Plan Review Fee65% of the building permit feeUAC Section 112.3
Re-inspection Fee$47.00 eachUAC Table 112-A, Other Inspections and Fees

Electrical Permit

Verified

Required for installation, alteration, or replacement of electrical appliances, devices, wiring, or equipment in Albuquerque. Governed by the 2020 New Mexico Electrical Code as locally administered under the Uniform Administrative Code. Apply through ABQ-PLAN.

Verified 2026-07-02 · Source

Requirements

  • Installation of an appliance, device, equipment, or wiring requires an electrical permit
  • Additions, alterations, or replacements of existing appliances, devices, wiring, or equipment require a permit
  • May be issued to a homeowner who passes a written electrical exam with a score of 75% or greater (4 hours allowed; up to two attempts, 30 days apart; one passing exam per homeowner per year), otherwise a New Mexico-licensed electrical contractor is required

Required documents

  • RequiredElectrical Permit ApplicationSubmitted online through ABQ-PLAN

Fee schedule

Fee typeAmountNotes
Administrative charge (applies to all applications and additions to permit; exception: re-inspection fee)$47.00 eachUAC Table 112-B, item 1
Meter loop$40.00 each (temporary meters $40.00 each; ganged meters $60.00 per gang)UAC Table 112-B, item 2
Outlets (communication/signal, fixtures, switches, receptacles)First 20: $1.50 each; all over 20: $0.90 eachUAC Table 112-B, item 3
Motor operated equipmentLess than 1 HP: $8.00 each; 1 HP and over: $20.00 base plus $40.00 per horsepower (max fee per unit $8.00 stated in code table)UAC Table 112-B, item 5
Residential fixed appliances (30 amps or over)$40.00 eachUAC Table 112-B, item 8
Panels$8.00 eachUAC Table 112-B, item 7
Swimming pool (private)$8.00 eachUAC Table 112-B, item 15
Re-inspection Fee$47.00 eachUAC Table 112-B, Other Inspections and Fees item 2, per Section 113.5.8
Plan Review Fee (electrical)25% of the total electrical permit feeUAC Section 112.3

Plumbing / Mechanical Permit

Verified

Required for heating/cooling installation, exhaust hood installation, bathroom/kitchen piping work, ductwork/equipment installation, house sewer or water service work, and water heater installation in Albuquerque. Governed by the 2021 New Mexico Plumbing Code and 2021 New Mexico Mechanical Code as locally administered under the Uniform Administrative Code. Apply through ABQ-PLAN.

Verified 2026-07-02 · Source

Requirements

  • Heating or cooling installation requires a plumbing/mechanical permit
  • Installation of an exhaust hood requires a permit
  • Installation or alteration of bathroom or kitchen piping requires a permit
  • Installation of equipment or ductwork must be completed by a licensed contractor and requires a permit
  • Installation or alteration of house sewer or water service outside the structure requires a permit
  • Installation of a water heater must be completed by a licensed contractor and requires a permit (residential water heater replacement is eligible for Express Permitting — same-day issuance)
  • May be issued to a homeowner who passes a written plumbing exam with a score of 75% or greater, otherwise a New Mexico-licensed plumbing/mechanical contractor is required

Required documents

  • RequiredPlumbing/Mechanical Permit ApplicationSubmitted online through ABQ-PLAN

Fee schedule

Fee typeAmountNotes
Administrative charge (applies to all applications and additions to permit; exception: re-inspection fee)$47.00 eachUAC Table 112-C item 1 (mechanical) and Table 112-D item 1 (plumbing)
Plumbing fixture (includes drain and vent)$10.00 eachUAC Table 112-D, item 6
Water service (from property line to house/building)$14.00UAC Table 112-D, item 8
House or building sewer (from property line to house/building, including 2-way cleanout)$28.00 eachUAC Table 112-D, item 10
Each appliance (mechanical), includes plenums and venting (excludes boilers, refrigeration, A/C, absorption units)$14.00 eachUAC Table 112-C, item 6
Ventilation fan connected to a single duct$14.00 eachUAC Table 112-C, item 15
Installation of a hood served by mechanical exhaust, including ducts$90.00 eachUAC Table 112-C, item 17
Gas outlet$6.00 eachUAC Table 112-C item 5 / Table 112-D item 5
Re-inspection Fee$47.00 eachUAC Tables 112-C and 112-D, Other Inspections and Fees, per Section 113.5.8
Plan Review Fee (mechanical/plumbing)25% of the total permit feeUAC Section 112.3

Re-Roof Permit

Verified

Required for re-roofing work on residential and commercial structures in Albuquerque. A general (building) permit is required for re-roofing. Residential re-roofing without truss repairs is eligible for same-day Express Permitting; drone-photo inspection is available.

Verified 2026-07-02 · Source

Requirements

  • Re-roofing requires a general (building) permit
  • Residential re-roof without any truss repairs qualifies for the Express Permitting System (same-day issuance)
  • Permit issued only to a homeowner (owner-occupied) or a New Mexico-licensed contractor
  • No more than one Homeowner's Building or Reroof Permit may be issued to the same property owner within a 12-month period

Required documents

  • RequiredBuilding Permit Application (Re-Roof)Submitted online through ABQ-PLAN; homeowner applicants complete the Homeowners' Responsibilities affidavit
  • OptionalHomeowners' Responsibilities for Obtaining a Residential Permit (affidavit)Required attestation for homeowner-obtained re-roof permits confirming the homeowner will perform or directly oversee the work and comply with codes

Fee schedule

Fee typeAmountNotes
Re-Roof Permit — Residential (R-3 occupancies only)$30.00 administrative fee plus $40.00 inspection fee = $70.00 total2024 City of Albuquerque Uniform Administrative Code, Table 112-G
Re-Roof Permit — Commercial (Apartments R-1, R-2, R-4 and all other occupancies), by valuation$501–$5,000: $50 admin + $50 inspection = $100 total; $5,001–$10,000: $50 + $70 = $120; $10,001–$20,000: $50 + $110 = $160; $20,001–$30,000: $50 + $190 = $240; $30,001–$40,000: $50 + $270 = $320; $40,001–$50,000: $50 + $350 = $400; over $50,000: $50 + $430 = $4802024 City of Albuquerque Uniform Administrative Code, Table 112-G

Solar Photovoltaic (PV) Permit

Verified

Required for roof-mounted, ground-mounted, or awning-mounted photovoltaic system installations in Albuquerque. Both a building permit and an electrical permit are required. Roof-mounted residential systems under 50 kW are eligible for same-day Express Permitting.

Verified 2026-07-02 · Source

Requirements

  • Building permit and electrical permit both required for all PV installations (roof-mounted, ground-mounted, and awning-mounted)
  • Roof-mounted solar permits under 50 kW are eligible for the Express Permitting System (same-day issuance)
  • Historic Preservation District approval required as a pre-requisite if the property is within a historic overlay district
  • Site plan to scale showing PV array configuration, all supporting equipment, sub-panels, and main electrical service location
  • Electrical one-line diagram required; three-line diagram required if the system exceeds 10 kW
  • Systems exceeding 200 amps must have plans prepared and stamped by a New Mexico-licensed electrical engineer
  • Ground-mounted and awning systems require an engineering letter/calculations and foundation design certified and stamped by a New Mexico-licensed engineer
  • Documentation of a New Mexico structural engineer's review of the existing roof structure required for residential roof-mounted systems when there is more than one existing roof covering or added dead/point loads exceed specified thresholds

Required documents

  • RequiredBuilding Permit Application (Solar PV)Submitted online through ABQ-PLAN; work description must include system size, square footage of work, and roof type
  • RequiredSite Plan (to scale)Official property address, PV array configuration, elevation profile, all supporting equipment, dimensions and clearances
  • RequiredElectrical One-Line (or Three-Line) DiagramOne-line diagram required for all systems; three-line diagram required if system exceeds 10 kW
  • RequiredEquipment ScheduleMake, model, and listing classification for all system components (modules, inverters, micro-inverters)

Fee schedule

Fee typeAmountNotes
Solar collector installation (mechanical/HVAC-related fee, including related piping/ductwork/regulating devices)Up to 1,000 sq ft: $8.00; 1,001–2,000 sq ft: $8.00; more than 2,000 sq ft: $8.00 plus $1.50 per 1,000 sq ft or fraction over 2,000 sq ft2024 City of Albuquerque Uniform Administrative Code, Table 112-C, item 20
Building Permit Fee (Table 112-A, valuation-based)Same Table 112-A formula as other building permits, based on project valuation with applicable regional modifierUAC Section 112.2 / Table 112-A; solar PV installations require a building permit priced on this schedule in addition to the electrical permit and any mechanical solar-collector fee
Electrical Permit FeePer UAC Table 112-B (administrative charge $47.00 plus applicable per-item charges for panels, disconnects, and equipment installed)UAC Table 112-B

Accessory Dwelling Unit (ADU / Casita) Permit

Verified

Required for construction of an Accessory Dwelling Unit (locally called a 'casita') in Albuquerque. Zoning laws changed in 2023 to allow casitas in R-1 neighborhoods citywide. Requires a Site Plan approval followed by a building permit, both processed through ABQ-PLAN.

Verified 2026-07-02 · Source

Requirements

  • Casitas are allowed in R-A, R-1, R-T, and R-ML residential zone districts — confirm zoning using the City's zone look-up map
  • Maximum casita size: 750 sq. ft. (650 sq. ft. in the Downtown Neighborhood Area CPO-3)
  • Only 1 casita allowed per lot in R-A and R-1 zones; cannot exceed 25% of combined side and rear yard area and cannot be taller than the main house
  • Minimum setback: 5 feet on either side or rear (same minimum street-side setback as the main house on corner lots)
  • Placement must be behind the rear wall of the main house; exterior color must match or be similar to the main house
  • One off-street parking space must be provided
  • 5-foot minimum building separation from the main house required by the International Residential Code (unless fire-rated) and by the Integrated Development Ordinance setback
  • Step 1: Submit a Site Plan (Administrative) via ABQ-PLAN, including property lines, easements, existing structures, new ADU location/size, and required parking space, plus required public notice (signage and Neighborhood Association email)
  • Step 2: Submit a Building Permit application via ABQ-PLAN with the building plans and approved Site Plan
  • Separate trade permits (electrical, plumbing, mechanical) required in addition to the building permit

Required documents

  • RequiredSite Plan – Administrative ApplicationIncludes location of property lines, easements, all existing structures, new ADU location/size, and required off-street parking space
  • RequiredBuilding Permit ApplicationSubmitted via ABQ-PLAN after Site Plan approval, with building plans and the approved site plan attached
  • RequiredGrading and Drainage PlanUpdated grading and drainage plan required as part of the site plan submittal
  • OptionalTruss Detail DrawingsIf required, sealed and stamped by a New Mexico Licensed Structural Engineer
  • RequiredPublic Notice DocumentationPosted sign and email notice to the affected Neighborhood Association, per the City's public notice requirements

Fee schedule

Fee typeAmountNotes
Building Permit Fee (Table 112-A, valuation-based, one- and two-family regional modifier 0.50)Same Table 112-A formula and 0.50 regional modifier as new residential construction, applied to the casita's building valuation2024 City of Albuquerque Uniform Administrative Code, Section 112.2.1 and Table 112-A
Plan Review Fee65% of the building permit feeUAC Section 112.3

Wall / Fence Permit

Verified

Required for walls and fences over six (6) feet high in Albuquerque; walls and fences under six feet require a permit from the Zoning Counter instead of Building Safety. Fee is based on wall/fence type and height per lineal foot.

Verified 2026-07-02 · Source

Requirements

  • Walls and fences over six (6) feet high require a building permit from the Building Safety Division
  • Walls and fences under six feet require a permit from the Zoning Counter, not Building Safety
  • Retaining walls are subject to the same Building Safety permit requirement based on height and construction type

Required documents

  • RequiredBuilding Permit Application (Wall/Fence)Submitted online through ABQ-PLAN

Fee schedule

Fee typeAmountNotes
CMU Garden Wall, 6 ft$41.70 per lineal foot2024 City of Albuquerque Uniform Administrative Code, Table 112-F (Fence and Wall Construction Cost Guide Per Lineal Foot)
Adobe Garden Wall, 6 ft$71.40 per lineal footUAC Table 112-F
Wood Stud/Stucco Wall, 6 ft$69.30 per lineal footUAC Table 112-F
Wood Fence (Cedar), 6 ft$23.30 per lineal footUAC Table 112-F
Chain Link Fence, 6 ft$12.00 per lineal footUAC Table 112-F
CMU Retaining Wall (6-inch), 6 ft$45.75 per lineal foot (add 15% for reinforcement greater than code minimum)UAC Table 112-F
Concrete Retaining Wall (3-inch), 6 ft$89.00 per lineal footUAC Table 112-F

Sign Permit

Verified

Required for installation of signs in Albuquerque. Fee is based on sign size. Electrical signs require a separate electrical permit in addition to the sign permit.

Verified 2026-07-02 · Source

Requirements

  • Installation of signs requires a building permit under UAC Table 112-E
  • Electrical signs require a separate electrical permit (Table 112-B) in addition to the sign permit
  • Signs must comply with the electrical code and bear the label of an approved testing agency if they contain electrical wiring

Required documents

  • RequiredSign Permit ApplicationSubmitted online through ABQ-PLAN

Fee schedule

Fee typeAmountNotes
Sign Permit — 2 to 20 sq. ft.$15.002024 City of Albuquerque Uniform Administrative Code, Table 112-E
Sign Permit — over 20 to 100 sq. ft.$30.00UAC Table 112-E
Sign Permit — over 100 sq. ft.$45.00UAC Table 112-E
Re-inspection Fee$47.00 eachUAC Table 112-E, Other Inspections and Fees, per Section 113.5.8

Demolition Permit

Verified

Required for demolition of a building or structure in Albuquerque, including homeowner-occupied demolitions performed by the owner. Fee is based on the floor area being demolished.

Verified 2026-07-02 · Source

Requirements

  • Demolition of any building or structure requires a permit under the Uniform Administrative Code
  • Permit issued only to a homeowner (for their own owner-occupied home) or a New Mexico-licensed contractor
  • No more than one Homeowner's permit (including demolition) shall be issued to the same property owner within a 12-month period

Required documents

  • RequiredDemolition Permit ApplicationSubmitted online through ABQ-PLAN
  • OptionalHomeowners' Responsibilities for Obtaining a Residential Permit (affidavit)Required for homeowner-obtained demolition permits, confirming the owner will perform or directly oversee the demolition and comply with applicable codes

Fee schedule

Fee typeAmountNotes
Demolition Permit Fee — up to and including 1,500 sq. ft. of floor area (all floors and basements)$100.002024 City of Albuquerque Uniform Administrative Code, Table 112-A, Other Inspections and Fees item 8
Demolition Permit Fee — each additional 500 sq. ft. or fraction thereof$10.00UAC Table 112-A, Other Inspections and Fees item 8

Sources & verification

Verified against official sources. Last reviewed 2026-07-02.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Albuquerque building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-07-02)Later version (2026-07-11) →View current record →All versions →

Permalink: /new-mexico/bernalillo-county/albuquerque/as-of/2026-07-03/

Snapshot date: 2026-07-03

Commit: 02f2162

Reproducible from PermitBase’s version-controlled dataset, commit 02f2162.