Sunland Park building permits

Verified

Sunland Park, New Mexico — as published 2026-07-03.

Verified 2026-07-03 · Source

Codes adopted

The City of Sunland Park self-administers building permitting through its own Community Development Department / Building Inspections Division — permits are issued by the City's own Building Inspector, NOT by the New Mexico Construction Industries Division (CID). Confirmed by: (1) the City's Development Fee Schedule (effective July 1, 2024), footnote **: 'The City of Sunland Park has adopted the utilization of the International Code Council (Uniform Building Code) for implementing the Building Valuation Data (BVD) to determine building permit fees in accordance with its fee table and formulas'; (2) the City's own Grading Permit Application form, header 'CITY OF SUNLAND PARK ... COMMUNITY DEVELOPMENT DEPARTMENT ... BUILDING INSPECTIONS DEPT.', which repeatedly references the 'City Building Inspector' as the approving/enforcing official; (3) the City's Land Development Code (Title 10), Section 10-4-6.11 'Compliance With Building Codes And Permits': 'A building permit shall be acquired from the building City of Sunland Park inspection office prior to commencing construction on any structure, building, or improvement'; and Section 10-4-10.1 (Fences): 'No fence or wall shall be constructed or altered until a building permit for such erection or alteration shall have been issued by the BUILDING INSPECTOR ... Refer to Title 9, Building Regulations for Building Permit process and regulations.' This contrasts with jurisdictions such as Alamogordo, NM, which are directly CID-administered because they lack a certified local building department — Sunland Park operates its own.The City references its own Title 9 ('Building Regulations') of the Sunland Park Municipal Code as the governing building-permit-process title (cited in Land Development Code Section 10-4-10.1), but Title 9's full text was not found publicly hosted on the City's own website (sunlandpark-nm.gov) as a standalone PDF, nor retrievable via Municode's library/API for the 'nm/sunland_park' client (library.municode.com/nm/sunland_park resolves to a JS-rendered app shell with no static ordinance text retrievable via direct HTTP fetch, curl with/without browser headers, or Wayback Machine — no snapshot exists per the Wayback CDX availability API as of 2026-07-03). GENUINELY UNPUBLISHED (see report): the specific I-Code edition years (e.g., which cycle of IBC/IRC/IPC/IMC/NEC) adopted by ordinance in Title 9 could not be independently confirmed beyond the fee schedule's generic reference to 'International Code Council (Uniform Building Code)' Building Valuation Data.New Mexico statewide minimum building code context (for comparison/authority-model purposes only, not directly enforced here since Sunland Park self-administers): the state's baseline codes are the 2021 New Mexico Commercial/Residential Building Codes (NMAC 14.7.2/14.7.3, based on the 2021 IBC/IRC), 2021 NM Plumbing Code (NMAC 14.8.2), 2021 NM Mechanical Code (NMAC 14.9.2), and 2020 NM Electrical Code (NMAC 14.10.4, based on the 2020 NEC), per NM RLD Construction Industries Division's published Rules, Laws, and Building Codes page — a self-administering municipality like Sunland Park must enforce codes at least as stringent as this state minimum, but the City's specific locally-adopted edition years are the Title 9 text described as unpublished above.

Permit types & fees

Residential Building Permit (New Construction / Addition)

Verified

Required for new single-family home construction, additions, and room additions in Sunland Park. Issued directly by the City's own Community Development Department / Building Inspections Division — Sunland Park self-administers building permitting rather than routing through the NM Construction Industries Division (CID).

Verified 2026-07-03 · Source

Requirements

  • Submit a permit application in person at the Community Development office, 1000 McNutt Rd, Suite G, Sunland Park, NM 88063, or online at sunlandpark-nm.gov/community-development/
  • Provide a basic site plan and building plans showing dimensions, materials, and layout (Community Development can provide a project-specific checklist)
  • Obtain zoning approval for the building permit — the Development Fee Schedule lists a distinct 'Zoning Approval for Building Permit' plan-review line for residential new construction, billed per the City's Uniform Building Code Building Valuation Data (BVD) formula
  • Projects requiring a zoning variance will extend the review timeline beyond the standard 7-10 days
  • Licensed New Mexico contractors may apply on the owner's behalf; owners should confirm proof of issued permits before work begins

Required documents

  • RequiredBuilding Permit ApplicationCity of Sunland Park Community Development Department application; site plan and building plans (dimensions, materials, layout) required
  • RequiredSite PlanBasic site plan showing the building footprint, setbacks, and property lines

Fee schedule

Fee typeAmountNotes
Building Permit Fee (Residential New Construction, Plan Review)Calculated per the Most Current Version of the Uniform Building Code (ICC Building Valuation Data / BVD formula)City of Sunland Park Development Fee Schedule (eff. 7/1/2024), 'ZONING APPROVAL FOR BUILDING PERMIT — Plan Review, Residential New Construction' and footnote **: fees calculated using ICC Building Valuation Data per the City's adopted formula; contact Community Development at (575) 589-3631 for a project-specific estimate
Technology Fee (added to base permit fee)$1 (fee $10-$50) to $300 (fee $10,001+), tiered by base fee amountCity of Sunland Park Development Fee Schedule, Technology Fee table

Grading Permit

Verified

Required for clearing/access, pre-final, and final grading on any site in Sunland Park; tiered by acreage. Issued by the Building Inspections Dept. within the Community Development Department using the City's own Grading Permit Application form.

Verified 2026-07-03 · Source

Requirements

  • Prior to grading, notify the Community Development Department for a pre-inspection at (575) 589-3631
  • Complete the Grading Permit Application specifying intended use of site, flood zone, legal description, owner/contractor info, estimated cut/fill (cubic yards), and acreage tier
  • Select permit type: Clearing & Access (20% of total fee), Pre-Final Grading (40%), or Final Grading (100%), or Borrow/Waste
  • $300,000 minimum combined single-limit liability insurance required for all permits on sites larger than one (1) acre
  • A copy of the permit must be kept at the job site at all times
  • No grading on weekends or holidays unless authorized in advance by the City Building Inspector (call (575) 589-3631 before 12:00 p.m. for weekend/holiday grading authorization)
  • Permits (other than Borrow/Waste) are valid for one year from issuance; extensions must be requested one month prior to expiration, in writing

Required documents

  • RequiredGrading Permit ApplicationCity of Sunland Park Community Development / Building Inspections Dept. form; requires legal description, cut/fill estimates, acreage tier selection, and liability insurance confirmation for sites over 1 acre

Fee schedule

Fee typeAmountNotes
Clearing and Access Grading Permit — Tier 1 (0-5 acres)$74City of Sunland Park Development Fee Schedule / Grading Permit Application fee table
Clearing and Access Grading Permit — Tier 7 (50+ acres)$162City of Sunland Park Development Fee Schedule / Grading Permit Application fee table
Pre-Final Grading Permit — Tier 1 (0-5 acres)$148City of Sunland Park Development Fee Schedule / Grading Permit Application fee table
Pre-Final Grading Permit — Tier 7 (50+ acres)$325City of Sunland Park Development Fee Schedule / Grading Permit Application fee table
Final Grading Permit — Tier 1 (0-5 acres)$369City of Sunland Park Development Fee Schedule / Grading Permit Application fee table
Final Grading Permit — Tier 7 (50+ acres)$812City of Sunland Park Development Fee Schedule / Grading Permit Application fee table
Grading First/Second Extension30% of Net Payment (each)City of Sunland Park Development Fee Schedule
Illegal GradingDouble FeeCity of Sunland Park Development Fee Schedule

Fence / Wall Permit

Verified

Required for construction or alteration of any fence or wall in Sunland Park. Issued by the City Building Inspector under Land Development Code Section 10-4-10 (Fences, Walls, and Hedges).

Verified 2026-07-03 · Source

Requirements

  • No fence or wall may be constructed or altered until a building permit is issued by the BUILDING INSPECTOR (Land Development Code Section 10-4-10.1)
  • Applicant is responsible for confirming location of property lines, placement of footings/walls within property boundaries, and location of any easements or underground utilities
  • A wall must not increase the quantity or velocity of stormwater runoff onto neighboring property
  • Residential districts: fences/walls in the front setback and front-yard sides limited to 3.5' max / 2.5' min height (wrought iron or transparent fencing may be up to 6'); beyond the front setback, walls may be up to 6' high
  • Commercial/Industrial districts: a solid 6' wall is required when adjacent to a residential district or as a buffer between unlike uses; general fence/wall height max is 4' (min 2') in front/side yards, up to 6' beyond the front setback
  • Permitted materials: rock and mortar, brick and mortar, split-faced CMU block, wrought iron, stucco finish, wood or panelized systems (subject to Building Inspector approval)
  • Prohibited materials/colors: barbed wire, razor wire, electrified fencing, smooth-faced or plain concrete CMU (unless stucco-finished), and chain link/wire mesh fencing

Required documents

  • RequiredBuilding Permit Application (Fence/Wall scope)Refer to Title 9 (Building Regulations) for the City's building permit process; submitted to Community Development / Building Inspections

Fee schedule

Fee typeAmountNotes
Rock/Cinder Block Wall$0.50 per linear foot of constructed wall + $30 issuance feeCity of Sunland Park Development Fee Schedule (eff. 7/1/2024), Building Permit Fees table

Sign Permit (Standard / Temporary)

Verified

Required for permanent and temporary signage in Sunland Park under Land Development Code Section 10-4-11 (Signs). Two-track application process (Standard vs. Temporary) with a defined two-stage review timeline.

Verified 2026-07-03 · Source

Requirements

  • Sign permits are required for all signs unless specifically exempted (e.g., directional signs under 6 sq ft, window displays, required regulatory signs)
  • Standard Sign Permit Application requires: written proof of landlord approval, completed application form, site plan showing sign location, sign specifications/drawings, engineered plans (for signs over 10 feet), illumination details, and color/material samples
  • Temporary Sign Permit Application requires: written proof of landlord approval, completed application, duration of display, installation/removal dates, site plan, sign specifications, and property owner authorization
  • Temporary sign time limitations: bench signs up to 1 year; transit shelter signs per specified term; construction signs for duration of project; special event signs up to 10 days; searchlights up to 72 hours

Required documents

  • RequiredStandard Sign Permit ApplicationFull documentation package per Land Development Code Section 10-4-11.6(A): landlord approval, site plan, sign specs/drawings, engineered plans if over 10', illumination details, color/material samples
  • OptionalTemporary Sign Permit ApplicationPer Section 10-4-11.6(B): landlord approval, duration/installation-removal dates, site plan, sign specs, property owner authorization

Fee schedule

Fee typeAmountNotes
Permanent Sign Permit (each)$30 plus 10% of the total valuation of construction and erection of the signCity of Sunland Park Development Fee Schedule (eff. 7/1/2024), Building Permit Fees table
Temporary Sign Permit (each)$30City of Sunland Park Development Fee Schedule (eff. 7/1/2024), Building Permit Fees table

Roofing Permit (Reroof)

Verified

Required for reroof work in Sunland Park. Billed per the City's own Uniform Building Code Building Valuation Data (BVD) formula rather than a flat statewide fee, since the City self-administers rather than routing to CID.

Verified 2026-07-03 · Source

Requirements

  • A building permit is required for reroof work, issued by the City's Building Inspections Division
  • Fee is calculated using the Most Current Version of the Uniform Building Code (ICC Building Valuation Data), per the City's Development Fee Schedule
  • Licensed New Mexico roofing contractor required unless the scope qualifies as owner-performed work

Required documents

  • RequiredBuilding Permit Application (Re-roof scope)Submitted to Community Development / Building Inspections Division

Fee schedule

Fee typeAmountNotes
Re-roofCalculated per the Most Current Version of the Uniform Building Code (Building Valuation Data)City of Sunland Park Development Fee Schedule (eff. 7/1/2024), Building Permit Fees table: 'Re-roof — Most Current Version of the Uniform Building Code'

Solar Panel Permit

Verified

Required for installation of solar panel systems in Sunland Park. Issued by the City's Building Inspections Division and billed per the City's own Uniform Building Code Building Valuation Data (BVD) formula rather than the state CID's electrical fee table.

Verified 2026-07-03 · Source

Requirements

  • A building/electrical permit is required for solar panel installation, issued by the City's Building Inspections Division
  • Fee is calculated using the Most Current Version of the Uniform Building Code (ICC Building Valuation Data), per the City's Development Fee Schedule
  • Installer must be a properly licensed New Mexico contractor

Required documents

  • RequiredBuilding/Electrical Permit Application (Solar Panels scope)Submitted to Community Development / Building Inspections Division

Fee schedule

Fee typeAmountNotes
Solar PanelsCalculated per the Most Current Version of the Uniform Building Code (Building Valuation Data)City of Sunland Park Development Fee Schedule (eff. 7/1/2024), Building Permit Fees table: 'Solar Panels — Most Current Version of the Uniform Building Code'

Swimming Pool Permit

Verified

Required for construction of a swimming pool in Sunland Park. Involves both a Building Permit plan-review fee (Uniform Building Code valuation-based) and a separate Zoning Swimming Pool Application Fee.

Verified 2026-07-03 · Source

Requirements

  • A building permit is required for swimming pool construction, with plan review billed per the Uniform Building Code Building Valuation Data formula
  • A separate Zoning Swimming Pool Application Fee applies, also billed per the Uniform Building Code valuation formula
  • Submit site plan showing pool location relative to setbacks and easements

Required documents

  • RequiredBuilding Permit Application (Swimming Pool scope)Submitted to Community Development / Building Inspections Division; includes Swimming Pool Plan Review Fee
  • RequiredZoning Swimming Pool ApplicationSeparate zoning-side application and fee

Fee schedule

Fee typeAmountNotes
Swimming Pool Plan Review FeeCalculated per the Most Current Version of the Uniform Building Code (Building Valuation Data)City of Sunland Park Development Fee Schedule (eff. 7/1/2024), Building Permit Fees table
Swimming Pool Zoning Application FeeCalculated per the Most Current Version of the Uniform Building Code (Building Valuation Data)City of Sunland Park Development Fee Schedule (eff. 7/1/2024), Zoning fees table

Driveway Permit (Repairs and Maintenance)

Verified

Required for repairs and maintenance of driveways in Sunland Park, billed as a percentage of the construction cost estimate.

Verified 2026-07-03 · Source

Requirements

  • Submit a permit application for driveway repair/maintenance work to Community Development / Building Inspections
  • Fee is 5% of the construction cost estimate for the work

Required documents

  • RequiredBuilding Permit Application (Driveway repair/maintenance scope)Submitted to Community Development / Building Inspections Division; requires a construction cost estimate

Fee schedule

Fee typeAmountNotes
Driveway permit for repairs and maintenance of driveways5% based on Construction Cost EstimateCity of Sunland Park Development Fee Schedule (eff. 7/1/2024), Building Permit Fees table

EV Charger / EVSE Permit

Verified

Sunland Park has no separate electric-vehicle-charging-station permit or fee line. An EV charger installation is issued by the City's Building Inspections Division as a building/electrical permit billed under the same Uniform Building Code Building Valuation Data (BVD) formula used for solar panel installations and other construction, per the City's Development Fee Schedule — there is no distinct EV/EVSE dollar figure published.

Verified 2026-07-20 · Source

Requirements

  • A building/electrical permit is required for EV charger installation, issued by the City's Building Inspections Division
  • Fee is calculated using the Most Current Version of the Uniform Building Code (ICC Building Valuation Data), per the City's Development Fee Schedule — same mechanism as this file's Solar Panel Permit entry
  • Installer must be a properly licensed New Mexico contractor
  • No dedicated EV/EVSE line-item was found on the City's Development Fee Schedule Building Permit Fees table

Required documents

  • RequiredBuilding/Electrical Permit Application (EV Charger scope)Submitted to Community Development / Building Inspections Division; no dedicated EV/EVSE checkbox exists

Fee schedule

Fee typeAmountNotes
EV Charger / Electrical Alteration (billed under general Uniform Building Code valuation formula)Calculated per the Most Current Version of the Uniform Building Code (Building Valuation Data)City of Sunland Park Development Fee Schedule (eff. 7/1/2024); no dedicated EV/EVSE fee line exists — same valuation-based mechanism applied to the Solar Panels line item
Technology Fee (added to base permit fee)$1 (fee $10-$50) to $300 (fee $10,001+), tiered by base fee amountCity of Sunland Park Development Fee Schedule, Technology Fee table

Fire Sprinkler & Fire Alarm Permit (Life Safety System Plan Review)

Verified

Required for installation, alteration, or tenant-improvement work on automatic fire sprinkler systems and commercial fire alarm systems in Sunland Park. Unlike New Mexico jurisdictions that route fire-system plan review to the NM State Fire Marshal's Office Code Enforcement Bureau, Sunland Park maintains its own City Fire Marshal (Dennis Schoen) and Community Risk Reduction Division within the Fire Department, which performs Automatic Fire Sprinkler Plan Review and Fire Alarm Plan Review directly, under fire code adoption/enforcement authority codified at Sunland Park Municipal Code Title 4, Chapter 6 (Sections 4-6-1 through 4-6-4).

Verified 2026-07-22 · Source

Requirements

  • Submit fire sprinkler and/or fire alarm plans to the Community Risk Reduction Division (Sunland Park Fire Department) for plan review prior to installation, per the City's 'Fire Marshal's Office Plan Submittal Information Requirements' package
  • The installing fire protection company must hold a current New Mexico State Fire Marshal's Office 'Certificate of Fitness' for the applicable system type (fire sprinkler, fire alarm, or hood suppression) — the Fire Marshal's Office verifies this before any work on a life safety system begins
  • Plan review fees are tiered by device count (commercial fire alarm systems) or sprinkler head count (water/chemical fire sprinkler systems and tenant-improvement sprinkler work), per the City's Development Fee Schedule
  • A separate Fire Pump Inspection (diesel or electrical) is required if the system includes a fire pump
  • New/altered systems require a Community Risk Reduction Division final construction inspection before acceptance
  • The Fire Department's currently adopted fire code is the 2021 International Fire Code (IFC) per the Fire Department FAQ; note the Community Risk Reduction page's own plan-submittal-requirements blurb separately references the 2015 IFC edition for submittal formatting — this inconsistency between two City-published pages was not otherwise resolved during this chase

Required documents

  • RequiredFire Sprinkler / Fire Alarm Plan Submittal PackagePer 'Fire Marshal's Office Plan Submittal Information Requirements 2023,' submitted to the Community Risk Reduction Division for plan review
  • RequiredCertificate of Fitness (Installing Fire Protection Company)NM State Fire Marshal's Office licensing verification confirming the contractor's competence to work on the specific life-safety system type (sprinkler, alarm, or hood suppression); checked by the Fire Marshal's Office before work begins

Fee schedule

Fee typeAmountNotes
Commercial Fire Alarm System — Tier 1 (1-5 Devices)$150City of Sunland Park Development Fee Schedule (eff. 7/1/2024), Fire Department Life Safety System Plan Review table
Commercial Fire Alarm System — Tier 2 (6-20 Devices)$300City of Sunland Park Development Fee Schedule, Fire Department Life Safety System Plan Review table
Commercial Fire Alarm System — Each Additional 20 Devices$150City of Sunland Park Development Fee Schedule, Fire Department Life Safety System Plan Review table
Water/Chemical Fire Sprinkler System — Tier 1 (1-15 Heads)$150City of Sunland Park Development Fee Schedule, Fire Department Life Safety System Plan Review table
Water/Chemical Fire Sprinkler System — Tier 2 (16-75 Heads)$300City of Sunland Park Development Fee Schedule, Fire Department Life Safety System Plan Review table
Water/Chemical Fire Sprinkler System — Tier 3 (76-100 Heads)$450City of Sunland Park Development Fee Schedule, Fire Department Life Safety System Plan Review table
Water/Chemical Fire Sprinkler System — Tier 4 (101-200 Heads)$600City of Sunland Park Development Fee Schedule, Fire Department Life Safety System Plan Review table
Water/Chemical Fire Sprinkler System — Each Additional 100 Heads$100City of Sunland Park Development Fee Schedule, Fire Department Life Safety System Plan Review table
Tenant Improvement for Sprinkler System — Tier 1 (1-15 Heads)$100City of Sunland Park Development Fee Schedule, Fire Department Life Safety System Plan Review table
Tenant Improvement for Sprinkler System — Tier 2 (16-75 Heads)$200City of Sunland Park Development Fee Schedule, Fire Department Life Safety System Plan Review table
Tenant Improvement for Sprinkler System — Tier 3 (76-100 Heads)$300City of Sunland Park Development Fee Schedule, Fire Department Life Safety System Plan Review table
Tenant Improvement for Sprinkler System — Tier 4 (101-200 Heads)$400City of Sunland Park Development Fee Schedule, Fire Department Life Safety System Plan Review table
Tenant Improvement for Sprinkler System — Each Additional 100 Heads$50City of Sunland Park Development Fee Schedule, Fire Department Life Safety System Plan Review table
Fire Pump Inspection — Diesel$150City of Sunland Park Development Fee Schedule, Fire Department Life Safety System Plan Review table
Fire Pump Inspection — Electrical$75City of Sunland Park Development Fee Schedule, Fire Department Life Safety System Plan Review table

Business Registration & Zoning Compliance Verification (Change of Use / New Occupancy)

Sunland Park has no standalone 'Change of Use Permit' or 'Certificate of Occupancy' application distinct from its business registration process. Per the Economic Development Department's own published FAQ, any new business — including a change of use or new tenant moving into an existing building — must complete a Business Registration Application that triggers zoning compliance verification by Community Development, plus a Fire Department and Building Department inspection of the specific space, before a business certificate is issued.

Reviewed 2026-07-22 · Source

Requirements

  • Obtain a New Mexico Tax ID number from NM Taxation and Revenue (also obtainable at the Community Development Department)
  • Submit a complete Business Registration Application to the Community Development Department for zoning compliance verification (a distinct 'Zoning Approval for New Businesses' review/fee applies)
  • If the business is home-based, submit a Home Occupation Business Registration form to Community Development for zoning compliance verification instead of the standard application
  • A separate application is required for each business location
  • Pay the registration fee before engaging in business ($35 per business, per calendar year, not prorated)
  • Upon Community Development approval, the approved registration form is registered with the City Clerk
  • Upon Planning Department approval, a request is submitted to BOTH the Fire Department and the Building Department for inspection of the specific building/space where the business will be conducted
  • A business certificate is not issued until all fees are paid and the space has complied with all applicable city and state regulations

Required documents

  • RequiredNew Business Registration ApplicationStandard business registration form submitted to Community Development for zoning compliance verification, per the Economic Development Department's published Business License and Registration process
  • OptionalHome Occupation Business Registration FormAlternate form required instead of the standard application when the business is home-based, also routed through Community Development for zoning compliance verification

Fee schedule

Fee typeAmountNotes
Zoning Approval for New Businesses$35City of Sunland Park Development Fee Schedule (eff. 7/1/2024), Zoning fees table
Business Registration Annual Fee$35City of Sunland Park Development Fee Schedule; also confirmed in the Economic Development FAQ ('$35.00 fee for each business'); due each calendar year (Jan 1-Dec 31), not prorated
Business License Late Penalty$10/monthCity of Sunland Park Development Fee Schedule; Economic Development FAQ confirms a $10.00 late penalty if renewal is paid after March 16
Fire Department Inspection Fee — Business (tiered by square footage, 3,000 sq ft or less through 12,000+ sq ft)$75 to $300City of Sunland Park Development Fee Schedule, Fire Department Inspection Fees table
Fire Department Inspection Fee — Home Occupancy Business$25City of Sunland Park Development Fee Schedule, Fire Department Inspection Fees table
Zoning Certification Letter (optional; formal written zoning confirmation)$50City of Sunland Park Development Fee Schedule, Zoning Certification table

Commercial Building Permit (New Construction / Remodel / Tenant Improvement)

Verified

Required for new commercial construction, commercial remodels, and tenant improvements in Sunland Park. Issued directly by the City's own Community Development Department / Building Inspections Division — Sunland Park self-administers building permitting and does NOT route commercial permits through the NM Construction Industries Division (CID). The City's Development Fee Schedule carries a distinct 'Plan Review _ Commercial' line under Zoning Approval for Building Permit, billed per the ICC Building Valuation Data (BVD) valuation formula, and a separate 9-tier Fire Department Commercial Plan Review fee by square footage. There is no separate tenant-improvement building permit — TI work is processed under this same commercial building permit.

Verified 2026-08-01 · Source

Requirements

  • Submit a permit application to the Community Development Department (in person at Community Development, McNutt Rd, Sunland Park, NM 88063, or online at sunlandpark-nm.gov/community-development/)
  • Obtain zoning approval for the building permit — the Development Fee Schedule lists a distinct 'Zoning Approval for Building Permit — Plan Review _ Commercial' line, billed per the City's adopted ICC Building Valuation Data (BVD) formula
  • Fire Department Commercial Plan Review is a separate, mandatory fee line tiered by project square footage (9 tiers, $75 for 3,000 sq ft or less up to $500 for 50,000+ sq ft), per the Development Fee Schedule
  • New commercial site development may additionally require Detailed Site Development Plan Review (Administrative $350, Planning & Zoning Commission $600, or City Council $1,000 track) and, where applicable, a Commercial Conditional Use ($600), Special Use ($600), or Temporary Use ($600) permit under the Zoning fee tables
  • A commercial zoning variance, if needed, is $1,000 ('All other variances — Commercial, Industrial, Preliminary Plat etc.') and will extend the review timeline
  • Plan review in excess of two cycles triggers a $500 fee upon 3rd review (all divisions)
  • Licensed New Mexico contractor required; a licensed contractor may apply on the owner's behalf
  • A new tenant or changed use in the finished space separately requires the City's Business Registration / zoning-compliance-verification process (see this file's change-of-use-permit entry) before a business certificate is issued

Required documents

  • RequiredBuilding Permit Application (Commercial scope)City of Sunland Park Community Development Department application; building plans and specifications for the commercial scope
  • RequiredSite PlanSite plan showing building footprint, setbacks, parking, and property lines; new commercial site development may require the fuller Detailed Site Development Plan Review track
  • RequiredFire Department Commercial Plan Review SubmittalPlans routed to the Sunland Park Fire Department / Community Risk Reduction Division for commercial plan review, billed by square-footage tier

Fee schedule

Fee typeAmountNotes
Zoning Approval for Building Permit — Plan Review _ CommercialCalculated per the Most Current Version of the Uniform Building Code (ICC Building Valuation Data / BVD formula)City of Sunland Park Development Fee Schedule (eff. 7/1/2024), 'ZONING APPROVAL FOR BUILDING PERMIT — Plan Review _ Commercial' and footnote **: fees calculated using ICC Building Valuation Data per the City's adopted formula; no flat dollar table is published — contact Community Development at (575) 589-3631 for a project-specific estimate
Fire Department Commercial Plan Review (tiered by square footage)$75 (Tier 1, 3,000 sq ft or less) to $500 (Tier 9, 50,000 sq ft or greater)City of Sunland Park Development Fee Schedule, Fire Department Commercial Plan Review table: Tier 1 ≤3,000 sq ft $75; Tier 2 3,001-6,000 $150; Tier 3 6,001-9,000 $200; Tier 4 9,001-12,000 $250; Tier 5 12,001-20,000 $300; Tier 6 20,001-30,000 $350; Tier 7 30,001-40,000 $400; Tier 8 40,001-50,000 $450; Tier 9 ≥50,000 $500
Plan Review in Excess of Two (all divisions)$500 upon 3rd reviewCity of Sunland Park Development Fee Schedule, 'ALL DIVISIONS PLAN REVIEW IN EXCESS OF TWO'
Technology Fee (added to base permit fee)$1 (fee $10-$50) to $300 (fee $10,001+), tiered by base fee amountCity of Sunland Park Development Fee Schedule, Technology Fee table
Detailed Site Development Plan Review (if required for the project)$350 (Administrative) / $600 (P&Z Commission) / $1,000 (City Council)City of Sunland Park Development Fee Schedule, Zoning fees table; which track applies depends on the project's approval level

Sources & verification

Verified against official sources. Last reviewed 2026-07-03.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Sunland Park building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

View current record →All versions →

Permalink: /new-mexico/dona-ana-county/sunland-park/as-of/2026-07-03/

Snapshot date: 2026-07-03

Commit: 13b726f

Reproducible from PermitBase’s version-controlled dataset, commit 13b726f.