This is PermitBase’s published record for Sunland Park as of 2026-07-20. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.
Sunland Park building permits
VerifiedSunland Park, New Mexico — as published 2026-07-20.
Verified 2026-07-03 · Source
Codes adopted
Permit types & fees
Residential Building Permit (New Construction / Addition)
VerifiedRequired for new single-family home construction, additions, and room additions in Sunland Park. Issued directly by the City's own Community Development Department / Building Inspections Division — Sunland Park self-administers building permitting rather than routing through the NM Construction Industries Division (CID).
Verified 2026-07-03 · Source
Requirements
- Submit a permit application in person at the Community Development office, 1000 McNutt Rd, Suite G, Sunland Park, NM 88063, or online at sunlandpark-nm.gov/community-development/
- Provide a basic site plan and building plans showing dimensions, materials, and layout (Community Development can provide a project-specific checklist)
- Obtain zoning approval for the building permit — the Development Fee Schedule lists a distinct 'Zoning Approval for Building Permit' plan-review line for residential new construction, billed per the City's Uniform Building Code Building Valuation Data (BVD) formula
- Projects requiring a zoning variance will extend the review timeline beyond the standard 7-10 days
- Licensed New Mexico contractors may apply on the owner's behalf; owners should confirm proof of issued permits before work begins
Required documents
- RequiredBuilding Permit ApplicationCity of Sunland Park Community Development Department application; site plan and building plans (dimensions, materials, layout) required
- RequiredSite PlanBasic site plan showing the building footprint, setbacks, and property lines
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee (Residential New Construction, Plan Review) | Calculated per the Most Current Version of the Uniform Building Code (ICC Building Valuation Data / BVD formula) | City of Sunland Park Development Fee Schedule (eff. Show full citationHideCity of Sunland Park Development Fee Schedule (eff. 7/1/2024), 'ZONING APPROVAL FOR BUILDING PERMIT — Plan Review, Residential New Construction' and footnote **: fees calculated using ICC Building Valuation Data per the City's adopted formula; contact Community Development at (575) 589-3631 for a project-specific estimate |
| Technology Fee (added to base permit fee) | $1 (fee $10-$50) to $300 (fee $10,001+), tiered by base fee amount | City of Sunland Park Development Fee Schedule, Technology Fee table |
Grading Permit
VerifiedRequired for clearing/access, pre-final, and final grading on any site in Sunland Park; tiered by acreage. Issued by the Building Inspections Dept. within the Community Development Department using the City's own Grading Permit Application form.
Verified 2026-07-03 · Source
Requirements
- Prior to grading, notify the Community Development Department for a pre-inspection at (575) 589-3631
- Complete the Grading Permit Application specifying intended use of site, flood zone, legal description, owner/contractor info, estimated cut/fill (cubic yards), and acreage tier
- Select permit type: Clearing & Access (20% of total fee), Pre-Final Grading (40%), or Final Grading (100%), or Borrow/Waste
- $300,000 minimum combined single-limit liability insurance required for all permits on sites larger than one (1) acre
- A copy of the permit must be kept at the job site at all times
- No grading on weekends or holidays unless authorized in advance by the City Building Inspector (call (575) 589-3631 before 12:00 p.m. for weekend/holiday grading authorization)
- Permits (other than Borrow/Waste) are valid for one year from issuance; extensions must be requested one month prior to expiration, in writing
Required documents
- RequiredGrading Permit ApplicationCity of Sunland Park Community Development / Building Inspections Dept. form; requires legal description, cut/fill estimates, acreage tier selection, and liability insurance confirmation for sites over 1 acre
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Clearing and Access Grading Permit — Tier 1 (0-5 acres) | $74 | City of Sunland Park Development Fee Schedule / Grading Permit Application fee table |
| Clearing and Access Grading Permit — Tier 7 (50+ acres) | $162 | City of Sunland Park Development Fee Schedule / Grading Permit Application fee table |
| Pre-Final Grading Permit — Tier 1 (0-5 acres) | $148 | City of Sunland Park Development Fee Schedule / Grading Permit Application fee table |
| Pre-Final Grading Permit — Tier 7 (50+ acres) | $325 | City of Sunland Park Development Fee Schedule / Grading Permit Application fee table |
| Final Grading Permit — Tier 1 (0-5 acres) | $369 | City of Sunland Park Development Fee Schedule / Grading Permit Application fee table |
| Final Grading Permit — Tier 7 (50+ acres) | $812 | City of Sunland Park Development Fee Schedule / Grading Permit Application fee table |
| Grading First/Second Extension | 30% of Net Payment (each) | City of Sunland Park Development Fee Schedule |
| Illegal Grading | Double Fee | City of Sunland Park Development Fee Schedule |
Fence / Wall Permit
VerifiedRequired for construction or alteration of any fence or wall in Sunland Park. Issued by the City Building Inspector under Land Development Code Section 10-4-10 (Fences, Walls, and Hedges).
Verified 2026-07-03 · Source
Requirements
- No fence or wall may be constructed or altered until a building permit is issued by the BUILDING INSPECTOR (Land Development Code Section 10-4-10.1)
- Applicant is responsible for confirming location of property lines, placement of footings/walls within property boundaries, and location of any easements or underground utilities
- A wall must not increase the quantity or velocity of stormwater runoff onto neighboring property
- Residential districts: fences/walls in the front setback and front-yard sides limited to 3.5' max / 2.5' min height (wrought iron or transparent fencing may be up to 6'); beyond the front setback, walls may be up to 6' high
- Commercial/Industrial districts: a solid 6' wall is required when adjacent to a residential district or as a buffer between unlike uses; general fence/wall height max is 4' (min 2') in front/side yards, up to 6' beyond the front setback
- Permitted materials: rock and mortar, brick and mortar, split-faced CMU block, wrought iron, stucco finish, wood or panelized systems (subject to Building Inspector approval)
- Prohibited materials/colors: barbed wire, razor wire, electrified fencing, smooth-faced or plain concrete CMU (unless stucco-finished), and chain link/wire mesh fencing
Required documents
- RequiredBuilding Permit Application (Fence/Wall scope)Refer to Title 9 (Building Regulations) for the City's building permit process; submitted to Community Development / Building Inspections
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Rock/Cinder Block Wall | $0.50 per linear foot of constructed wall + $30 issuance fee | City of Sunland Park Development Fee Schedule (eff. 7/1/2024), Building Permit Fees table |
Sign Permit (Standard / Temporary)
VerifiedRequired for permanent and temporary signage in Sunland Park under Land Development Code Section 10-4-11 (Signs). Two-track application process (Standard vs. Temporary) with a defined two-stage review timeline.
Verified 2026-07-03 · Source
Requirements
- Sign permits are required for all signs unless specifically exempted (e.g., directional signs under 6 sq ft, window displays, required regulatory signs)
- Standard Sign Permit Application requires: written proof of landlord approval, completed application form, site plan showing sign location, sign specifications/drawings, engineered plans (for signs over 10 feet), illumination details, and color/material samples
- Temporary Sign Permit Application requires: written proof of landlord approval, completed application, duration of display, installation/removal dates, site plan, sign specifications, and property owner authorization
- Temporary sign time limitations: bench signs up to 1 year; transit shelter signs per specified term; construction signs for duration of project; special event signs up to 10 days; searchlights up to 72 hours
Required documents
- RequiredStandard Sign Permit ApplicationFull documentation package per Land Development Code Section 10-4-11.6(A): landlord approval, site plan, sign specs/drawings, engineered plans if over 10', illumination details, color/material samples
- OptionalTemporary Sign Permit ApplicationPer Section 10-4-11.6(B): landlord approval, duration/installation-removal dates, site plan, sign specs, property owner authorization
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Permanent Sign Permit (each) | $30 plus 10% of the total valuation of construction and erection of the sign | City of Sunland Park Development Fee Schedule (eff. 7/1/2024), Building Permit Fees table |
| Temporary Sign Permit (each) | $30 | City of Sunland Park Development Fee Schedule (eff. 7/1/2024), Building Permit Fees table |
Roofing Permit (Reroof)
VerifiedRequired for reroof work in Sunland Park. Billed per the City's own Uniform Building Code Building Valuation Data (BVD) formula rather than a flat statewide fee, since the City self-administers rather than routing to CID.
Verified 2026-07-03 · Source
Requirements
- A building permit is required for reroof work, issued by the City's Building Inspections Division
- Fee is calculated using the Most Current Version of the Uniform Building Code (ICC Building Valuation Data), per the City's Development Fee Schedule
- Licensed New Mexico roofing contractor required unless the scope qualifies as owner-performed work
Required documents
- RequiredBuilding Permit Application (Re-roof scope)Submitted to Community Development / Building Inspections Division
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Re-roof | Calculated per the Most Current Version of the Uniform Building Code (Building Valuation Data) | City of Sunland Park Development Fee Schedule (eff. 7/1/2024), Building Permit Fees table: 'Re-roof — Most Current Version of the Uniform Building Code' |
Solar Panel Permit
VerifiedRequired for installation of solar panel systems in Sunland Park. Issued by the City's Building Inspections Division and billed per the City's own Uniform Building Code Building Valuation Data (BVD) formula rather than the state CID's electrical fee table.
Verified 2026-07-03 · Source
Requirements
- A building/electrical permit is required for solar panel installation, issued by the City's Building Inspections Division
- Fee is calculated using the Most Current Version of the Uniform Building Code (ICC Building Valuation Data), per the City's Development Fee Schedule
- Installer must be a properly licensed New Mexico contractor
Required documents
- RequiredBuilding/Electrical Permit Application (Solar Panels scope)Submitted to Community Development / Building Inspections Division
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Solar Panels | Calculated per the Most Current Version of the Uniform Building Code (Building Valuation Data) | City of Sunland Park Development Fee Schedule (eff. 7/1/2024), Building Permit Fees table: 'Solar Panels — Most Current Version of the Uniform Building Code' |
Swimming Pool Permit
VerifiedRequired for construction of a swimming pool in Sunland Park. Involves both a Building Permit plan-review fee (Uniform Building Code valuation-based) and a separate Zoning Swimming Pool Application Fee.
Verified 2026-07-03 · Source
Requirements
- A building permit is required for swimming pool construction, with plan review billed per the Uniform Building Code Building Valuation Data formula
- A separate Zoning Swimming Pool Application Fee applies, also billed per the Uniform Building Code valuation formula
- Submit site plan showing pool location relative to setbacks and easements
Required documents
- RequiredBuilding Permit Application (Swimming Pool scope)Submitted to Community Development / Building Inspections Division; includes Swimming Pool Plan Review Fee
- RequiredZoning Swimming Pool ApplicationSeparate zoning-side application and fee
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Swimming Pool Plan Review Fee | Calculated per the Most Current Version of the Uniform Building Code (Building Valuation Data) | City of Sunland Park Development Fee Schedule (eff. 7/1/2024), Building Permit Fees table |
| Swimming Pool Zoning Application Fee | Calculated per the Most Current Version of the Uniform Building Code (Building Valuation Data) | City of Sunland Park Development Fee Schedule (eff. 7/1/2024), Zoning fees table |
Driveway Permit (Repairs and Maintenance)
VerifiedRequired for repairs and maintenance of driveways in Sunland Park, billed as a percentage of the construction cost estimate.
Verified 2026-07-03 · Source
Requirements
- Submit a permit application for driveway repair/maintenance work to Community Development / Building Inspections
- Fee is 5% of the construction cost estimate for the work
Required documents
- RequiredBuilding Permit Application (Driveway repair/maintenance scope)Submitted to Community Development / Building Inspections Division; requires a construction cost estimate
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Driveway permit for repairs and maintenance of driveways | 5% based on Construction Cost Estimate | City of Sunland Park Development Fee Schedule (eff. 7/1/2024), Building Permit Fees table |
EV Charger / EVSE Permit
VerifiedSunland Park has no separate electric-vehicle-charging-station permit or fee line. An EV charger installation is issued by the City's Building Inspections Division as a building/electrical permit billed under the same Uniform Building Code Building Valuation Data (BVD) formula used for solar panel installations and other construction, per the City's Development Fee Schedule — there is no distinct EV/EVSE dollar figure published.
Verified 2026-07-20 · Source
Requirements
- A building/electrical permit is required for EV charger installation, issued by the City's Building Inspections Division
- Fee is calculated using the Most Current Version of the Uniform Building Code (ICC Building Valuation Data), per the City's Development Fee Schedule — same mechanism as this file's Solar Panel Permit entry
- Installer must be a properly licensed New Mexico contractor
- No dedicated EV/EVSE line-item was found on the City's Development Fee Schedule Building Permit Fees table
Required documents
- RequiredBuilding/Electrical Permit Application (EV Charger scope)Submitted to Community Development / Building Inspections Division; no dedicated EV/EVSE checkbox exists
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| EV Charger / Electrical Alteration (billed under general Uniform Building Code valuation formula) | Calculated per the Most Current Version of the Uniform Building Code (Building Valuation Data) | City of Sunland Park Development Fee Schedule (eff. 7/1/2024); no dedicated EV/EVSE fee line exists — same valuation-based mechanism applied to the Solar Panels line item |
| Technology Fee (added to base permit fee) | $1 (fee $10-$50) to $300 (fee $10,001+), tiered by base fee amount | City of Sunland Park Development Fee Schedule, Technology Fee table |
Sources & verification
Verified against official sources. Last reviewed 2026-07-03.
Fee schedules
Applications & forms
Codes & ordinances
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Sunland Park building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.