This is PermitBase’s published record for Bloomfield as of 2026-07-18. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.

Bloomfield building permits

Bloomfield, New Mexico — as published 2026-07-18.

Reviewed 2026-07-18 · Source

Codes adopted

2021 New Mexico Commercial Building Code (2021 NM Commercial & Residential Building Code) — per San Juan County Building Division's Design Criteria and Commercial Buildings Permit Application (revised 07/31/2023), which governs construction within the City of Bloomfield under the County's building-permit administration.2021 New Mexico Residential Building Code (2021 IRC as amended) — per San Juan County Building Division's New Residential Permit Application Checklist (revised 07/19/2023).2021 International Building Code2021 New Mexico Existing Building Code (2021 International Existing Building Code as amended)2021 New Mexico Commercial and Residential Energy Conservation Code (2021 IECC as amended)ICC/ANSI A117.1-2017 Accessible and Usable Buildings and Facilities2021 New Mexico Plumbing and Mechanical Code2021 Uniform Mechanical Code2021 Uniform Plumbing Code2021 International Fire Code2020 National Electrical Code (NFPA 70) / 2020 New Mexico Electrical Code2012 Uniform Solar Energy Code2012 Uniform Swimming Pool, Spa and Hot Tub Code2017 NFPA 58 (Liquefied Petroleum Gas Code)2018 NFPA 54 (National Fuel Gas Code)

Permit types & fees

New Residential Building Permit (New Construction / Addition / Accessory Building)

Verified

Required for new single-family residential construction, additions, and accessory buildings within Bloomfield. Although Bloomfield's Planning and Zoning Department is the first point of contact for zoning compliance, the actual building permit for structures within Bloomfield city limits is issued and inspected by the San Juan County Building Division, which administers building permitting for the City of Bloomfield under its cross-jurisdictional program.

Verified 2026-07-18 · Source

Requirements

  • New residential construction, addition, or accessory building (detached storage sheds/garages) within Bloomfield city limits — per San Juan County Building Division's New Residential Permit Application Checklist (revised 07/19/2023)
  • Planning/Zoning approval from the City of Bloomfield Planning and Zoning Department is required (checklist item 9) before or alongside the County building permit, since Bloomfield is one of the jurisdictions (with Aztec and Kirtland) where zoning approval applies
  • Must comply with the 2021 New Mexico Residential Building Code (2021 IRC as amended)
  • Site address must be assigned by San Juan County, City of Bloomfield, or City of Aztec addressing
  • New Mexico's homeowner permit exemption (14.5.2 NMAC) allows a property owner to obtain the permit for their own primary residence without a contractor license, provided the homeowner performs the major portion of the work
  • Floodplain approval required if applicable
  • A separate City of Bloomfield Building and Zoning Compliance Application ($25 fee) is also required at the City level for zoning/address/setback verification

Required documents

  • RequiredNew Residential Permit Application ChecklistSan Juan County Building Division form (revised 07/19/2023) covering site plan, footing/foundation plan, floor plan, load-bearing wall detail, roof/floor framing, elevations, 2021 IECC Residential Energy Code Compliance Form, and roofing specifications.
  • RequiredApplication for Building and Zoning ComplianceCity of Bloomfield Planning and Zoning form capturing project description, site plan, zoning district, lot size/setback conformance, flood zone status, and utility availability (water, sewer, electric, natural gas).

Fee schedule

Fee typeAmountNotes
Building Permit FeeProject valuation × 0.005
San Juan County Building Department page (sjcounty.net/government/community-development/building-department), 'Plan Review' section: 'Building Permit Fee: valuation of project x .005.' Project… Show full citation

San Juan County Building Department page (sjcounty.net/government/community-development/building-department), 'Plan Review' section: 'Building Permit Fee: valuation of project x .005.' Project valuations are determined using the latest ICC Building Valuation Data for new construction/additions, or contract price for alterations/repairs.

Building Plan Review FeeProject valuation × 0.0012San Juan County Building Department page, applies to buildings/structures requiring an Architect or Engineer seal under NMAC 14.5.2.9/14.5.2.10 and the Architectural Act (61-15-9 NMSA 1978); charged in addition to the Building Permit Fee.
Building and Zoning Compliance Application (City of Bloomfield)$25.00City of Bloomfield Planning & Zoning Fees 2022 schedule (bloomfieldnm.gov/media/466), 'Building and Zoning Compliance Application' line item.

Commercial Building Permit (New Construction / Addition / Alteration)

Verified

Required for new commercial construction, additions, and alterations within Bloomfield. Issued and inspected by the San Juan County Building Division under the County's cross-jurisdictional building program covering the City of Bloomfield, with City of Bloomfield Planning and Zoning approval also required.

Verified 2026-07-18 · Source

Requirements

  • New commercial construction, addition to a commercial structure, or alteration to a commercial structure within Bloomfield city limits — per San Juan County Building Division's Commercial Buildings Permit Application (revised 07/31/2023)
  • Must be performed by a licensed contractor per NMAC 14.6.6 Construction Industries Division Rules
  • Planning/Zoning approval from the City of Bloomfield Planning and Zoning Department is required (checklist item 10)
  • Must comply with the 2021 New Mexico Commercial & Residential Building Code, 2021 IBC, and 2021 New Mexico Commercial Energy Conservation Code (NMAC 14.7.6.13)
  • Plans must be stamped and signed by a registered design professional; footing/foundation design by a New Mexico Certified Engineer is required
  • Projects over $600,000 in valuation, or with total occupant load greater than 50, require seals from multiple design professionals
  • Floodplain approval required if applicable

Required documents

  • RequiredCommercial Buildings Permit ApplicationSan Juan County Building Division form (revised 07/31/2023) requiring one hard set or PDF of drawings (minimum 18"x24"), each page stamped/signed, code study, site plan, structural/architectural/electrical/plumbing/mechanical plans, and accessibility details.
  • RequiredApplication for Building and Zoning ComplianceCity of Bloomfield Planning and Zoning form; commercial structures require Fire Department approval in addition to standard zoning review, per the form's own instructions.

Fee schedule

Fee typeAmountNotes
Building Permit FeeProject valuation × 0.005San Juan County Building Department page, 'Plan Review' section.
Building Plan Review FeeProject valuation × 0.0012San Juan County Building Department page; applies when an Architect or Engineer seal is required under NMAC 14.5.2.9/14.5.2.10.
Building and Zoning Compliance Application (City of Bloomfield)$25.00City of Bloomfield Planning & Zoning Fees 2022 schedule.

Electrical Permit

Verified

Required for electrical installations, service changes, and related work on residential, commercial, and mobile-home structures within Bloomfield. Issued and inspected by the San Juan County Building Division under the 2020 New Mexico Electrical Code (based on the 2020 NEC).

Verified 2026-07-18 · Source

Requirements

  • Permit required for permanent service, temporary service, mobile home service, feeder/branch circuits, solar PV systems, swimming pool/wind generator equipment, and communication systems — per San Juan County's Electrical Permit Application (revised 04/11/2023)
  • Must comply with the 2020 New Mexico Electrical Code (2020 NEC as amended)
  • New Mexico's homeowner permit exemption (14.5.2 NMAC) allows a homeowner to pull an electrical permit for their own primary residence, provided the homeowner performs the major portion of the work
  • Only a New Mexico-licensed electrical contractor (or exempt homeowner) may perform and permit the work

Required documents

  • RequiredElectrical Permit ApplicationSan Juan County Building Division form (revised 04/11/2023) with a fee table by service type/amperage.

Fee schedule

Fee typeAmountNotes
Service under 100 amps (minimum)$60.00San Juan County Electrical Permit Application, revised 04/11/2023.
Service 100–200 amps$85.00San Juan County Electrical Permit Application, revised 04/11/2023.
Service 201–400 amps$275.00San Juan County Electrical Permit Application, revised 04/11/2023.
Service 401–600 amps$375.00San Juan County Electrical Permit Application, revised 04/11/2023.
Service 601–800 amps$475.00San Juan County Electrical Permit Application, revised 04/11/2023.
Service 801–1000 amps$575.00San Juan County Electrical Permit Application, revised 04/11/2023.
Service 1001–2000 amps$800.00San Juan County Electrical Permit Application, revised 04/11/2023.
Service over 2000 amps$1,275.00San Juan County Electrical Permit Application, revised 04/11/2023.
Feeder and Branch Circuits — Residential$0.03 per heated sq ftSan Juan County Electrical Permit Application, revised 04/11/2023.
Feeder and Branch Circuits — Commercial$0.06 per heated sq ftSan Juan County Electrical Permit Application, revised 04/11/2023.
Solar PV System$25/kW or fraction thereof for the first 160kW, then $5/kW thereafterSan Juan County Electrical Permit Application, revised 04/11/2023.
Swimming Pool / Wind Generator$35.00 eachSan Juan County Electrical Permit Application, revised 04/11/2023.
MH/RV Park or Multi-Bank Meters$60 first meter + $10 each additionalSan Juan County Electrical Permit Application, revised 04/11/2023.
Temporary Power Pole$25.00 eachSan Juan County Electrical Permit Application, revised 04/11/2023.
Administrative Fee$40.00San Juan County Electrical Permit Application, revised 04/11/2023.
Reinspection Fee$75.00San Juan County Electrical Permit Application, revised 04/11/2023.

Plumbing Permit

Verified

Required for plumbing installations, gas piping, and water/sewer service work within Bloomfield. Issued and inspected by the San Juan County Building Division under the 2021 New Mexico Plumbing Code (2021 Uniform Plumbing Code as amended).

Verified 2026-07-18 · Source

Requirements

  • Permit required for DWV and water distribution, backflow devices, water service lines, sewer/building drain, gas piping systems, and water heaters — per San Juan County's Plumbing Permit Application (revised 04/11/2023)
  • Must comply with the 2021 New Mexico Plumbing Code (2021 Uniform Plumbing Code as amended)
  • New Mexico's homeowner permit exemption (14.5.2 NMAC) allows a homeowner to pull a plumbing permit for their own primary residence, provided the homeowner performs the major portion of the work

Required documents

  • RequiredPlumbing Permit ApplicationSan Juan County Building Division form (revised 04/11/2023) with a fee table by fixture/line type.

Fee schedule

Fee typeAmountNotes
DWV and Water Distribution — Residential$0.03 per heated sq ftSan Juan County Plumbing Permit Application, revised 04/11/2023.
DWV and Water Distribution — Commercial$0.06 per heated sq ftSan Juan County Plumbing Permit Application, revised 04/11/2023.
Backflow Device$5/ea (up to 1 inch); $10/ea (1–3 inch); $15/ea (3 inch and up)San Juan County Plumbing Permit Application, revised 04/11/2023.
Water Service Line$10/ea (up to 1 inch); $15/ea (1 1/4 inch and up)San Juan County Plumbing Permit Application, revised 04/11/2023.
Sewer or Modular Building Drain$10.00 eachSan Juan County Plumbing Permit Application, revised 04/11/2023.
Gas Piping System (new or replacement), with yard line$40.00 eachSan Juan County Plumbing Permit Application, revised 04/11/2023.
Gas Piping System (new or replacement), no yard line$30.00 eachSan Juan County Plumbing Permit Application, revised 04/11/2023.
Water Heater$10.00 eachSan Juan County Plumbing Permit Application, revised 04/11/2023.
Medical Gas System$0.05 per heated sq ftSan Juan County Plumbing Permit Application, revised 04/11/2023.
Administrative Fee$40.00San Juan County Plumbing Permit Application, revised 04/11/2023.
Reinspection Fee$75.00San Juan County Plumbing Permit Application, revised 04/11/2023.

Mechanical / HVAC Permit

Verified

Required for heating, cooling, and gas-fired mechanical equipment installations within Bloomfield. Issued and inspected by the San Juan County Building Division under the 2021 Uniform Mechanical Code (as amended by the 2021 New Mexico Mechanical Code).

Verified 2026-07-18 · Source

Requirements

  • Permit required for heating/cooling distribution, gas piping systems, radiant in-floor heat, solar water heating systems, and heating/cooling/combo units — per San Juan County's Mechanical Permit Application (revised 04/11/2023)
  • Must comply with the 2021 Uniform Mechanical Code (2021 New Mexico Mechanical Code as amended)
  • New Mexico's homeowner permit exemption (14.5.2 NMAC) allows a homeowner to pull a mechanical permit for their own primary residence, provided the homeowner performs the major portion of the work

Required documents

  • RequiredMechanical Permit ApplicationSan Juan County Building Division form (revised 04/11/2023) with a fee table by equipment/system type.

Fee schedule

Fee typeAmountNotes
Heating and Cooling Distribution — Residential$0.03 per heated sq ftSan Juan County Mechanical Permit Application, revised 04/11/2023.
Heating and Cooling Distribution — Commercial$0.06 per heated sq ftSan Juan County Mechanical Permit Application, revised 04/11/2023.
Gas Piping System (new or replacement), with yard line$40.00 eachSan Juan County Mechanical Permit Application, revised 04/11/2023.
Gas Piping System (new or replacement), no yard line$30.00 eachSan Juan County Mechanical Permit Application, revised 04/11/2023.
Solar Water Heating System$10.00 eachSan Juan County Mechanical Permit Application, revised 04/11/2023.
Heating Unit(s)$25.00 each (includes related equipment/components)San Juan County Mechanical Permit Application, revised 04/11/2023.
Cooling Unit(s)$10.00 first unit, $5.00 each additionalSan Juan County Mechanical Permit Application, revised 04/11/2023.
Combo Unit(s)$20.00 first unit, $10.00 each additionalSan Juan County Mechanical Permit Application, revised 04/11/2023.
Type I Hood$20.00 eachSan Juan County Mechanical Permit Application, revised 04/11/2023.
Administrative Fee$40.00San Juan County Mechanical Permit Application, revised 04/11/2023.
Reinspection Fee$75.00San Juan County Mechanical Permit Application, revised 04/11/2023.

Mobile Home Movers / Set Permit

Verified

Required for moving a mobile home into, out of, or within Bloomfield, and for setting a mobile home on a lot. Issued by the City of Bloomfield Planning and Zoning Department; the permit is valid for 30 days and must be in the mover's possession while the home is in transit and during set-up.

Verified 2026-07-18 · Source

Requirements

  • Required for any mobile home move into, out of, or within Bloomfield, or for setting a mobile home on a property
  • Mobile Home Mover or business license number must be provided on the application
  • All applicable zoning regulations must be complied with within the 30-day permit validity window
  • Property owner and mobile home owner information, make/serial number/size of the home, and origin/destination addresses and legal description must be provided

Required documents

  • RequiredMobile Home Movers / Set ApplicationCity of Bloomfield Planning and Zoning form capturing mover/business license number, mobile home owner and property owner details, move date, make/serial number/size, origin and destination, legal description, zoning, and flood plain zone.

Fee schedule

Fee typeAmountNotes
Mobile Home Movers/Set Permit Application$50.00City of Bloomfield Planning & Zoning Fees 2022 schedule (bloomfieldnm.gov/media/466).

Sign Permit

Required for sign installation within Bloomfield, administered by the City's Planning and Zoning Department at a per-square-foot fee based on sign area.

Reviewed 2026-07-18 · Source

Requirements

  • Permit required for sign installation within Bloomfield city limits, per the City's Applications and Permits list
  • Fee is calculated per square foot of sign area

Required documents

  • RequiredApplication for SignCity of Bloomfield Planning and Zoning form (listed under Forms & Permits, Planning and Zoning department).

Fee schedule

Fee typeAmountNotes
Sign Permit Application$3.00 per square foot of sign areaCity of Bloomfield Planning & Zoning Fees 2022 schedule (bloomfieldnm.gov/media/466), 'Sign Permit Application' line item.

Street Excavation Permit

Verified

Required for excavation work within a Bloomfield street right-of-way, such as utility tie-ins or driveway cuts, administered by the City's Planning and Zoning Department with a bond or cash-deposit requirement that varies by road surface type.

Verified 2026-07-18 · Source

Requirements

  • Permit required for excavation within a City street right-of-way
  • A bond or cash deposit is required, at a different amount for paved versus unpaved roads
  • A non-refundable inspection/administrative fee applies regardless of bond type

Required documents

  • RequiredApplication for Street ExcavationCity of Bloomfield Planning and Zoning form (listed under Forms & Permits, Planning and Zoning department).

Fee schedule

Fee typeAmountNotes
Non-Refundable Inspection/Admin Fee$25.00City of Bloomfield Planning & Zoning Fees 2022 schedule (bloomfieldnm.gov/media/466), 'Street Excavation Permit' line item.
Paved Road Bond or Cash Deposit$5,000.00 bond OR $1,500.00 cash depositCity of Bloomfield Planning & Zoning Fees 2022 schedule.
Unpaved Road Bond or Cash Deposit$2,000.00 bond OR $175.00 cash depositCity of Bloomfield Planning & Zoning Fees 2022 schedule.

Sources & verification

Key facts verified against official sources. Last reviewed 2026-07-18.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Bloomfield building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Later version (2026-07-20) →View current record →All versions →

Permalink: /new-mexico/san-juan-county/bloomfield/as-of/2026-07-18/

Snapshot date: 2026-07-18

Commit: a2c942b

Reproducible from PermitBase’s version-controlled dataset, commit a2c942b.