Skip to main content
PermitBase

This is PermitBase’s published record for Bloomfield as of 2026-07-20. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.

Bloomfield building permits

Bloomfield, New Mexico — as published 2026-07-20.

Reviewed 2026-07-18 · Source

Codes adopted

2021 New Mexico Commercial Building Code (2021 NM Commercial & Residential Building Code) — per San Juan County Building Division's Design Criteria and Commercial Buildings Permit Application (revised 07/31/2023), which governs construction within the City of Bloomfield under the County's building-permit administration.2021 New Mexico Residential Building Code (2021 IRC as amended) — per San Juan County Building Division's New Residential Permit Application Checklist (revised 07/19/2023).2021 International Building Code2021 New Mexico Existing Building Code (2021 International Existing Building Code as amended)2021 New Mexico Commercial and Residential Energy Conservation Code (2021 IECC as amended)ICC/ANSI A117.1-2017 Accessible and Usable Buildings and Facilities2021 New Mexico Plumbing and Mechanical Code2021 Uniform Mechanical Code2021 Uniform Plumbing Code2021 International Fire Code2020 National Electrical Code (NFPA 70) / 2020 New Mexico Electrical Code2012 Uniform Solar Energy Code2012 Uniform Swimming Pool, Spa and Hot Tub Code2017 NFPA 58 (Liquefied Petroleum Gas Code)2018 NFPA 54 (National Fuel Gas Code)

Permit types & fees

New Residential Building Permit (New Construction / Addition / Accessory Building)

Verified

Required for new single-family residential construction, additions, and accessory buildings within Bloomfield. Although Bloomfield's Planning and Zoning Department is the first point of contact for zoning compliance, the actual building permit for structures within Bloomfield city limits is issued and inspected by the San Juan County Building Division, which administers building permitting for the City of Bloomfield under its cross-jurisdictional program.

Verified 2026-07-18 · Source

Requirements

  • New residential construction, addition, or accessory building (detached storage sheds/garages) within Bloomfield city limits — per San Juan County Building Division's New Residential Permit Application Checklist (revised 07/19/2023)
  • Planning/Zoning approval from the City of Bloomfield Planning and Zoning Department is required (checklist item 9) before or alongside the County building permit, since Bloomfield is one of the jurisdictions (with Aztec and Kirtland) where zoning approval applies
  • Must comply with the 2021 New Mexico Residential Building Code (2021 IRC as amended)
  • Site address must be assigned by San Juan County, City of Bloomfield, or City of Aztec addressing
  • New Mexico's homeowner permit exemption (14.5.2 NMAC) allows a property owner to obtain the permit for their own primary residence without a contractor license, provided the homeowner performs the major portion of the work
  • Floodplain approval required if applicable
  • A separate City of Bloomfield Building and Zoning Compliance Application ($25 fee) is also required at the City level for zoning/address/setback verification

Required documents

  • RequiredNew Residential Permit Application ChecklistSan Juan County Building Division form (revised 07/19/2023) covering site plan, footing/foundation plan, floor plan, load-bearing wall detail, roof/floor framing, elevations, 2021 IECC Residential Energy Code Compliance Form, and roofing specifications.
  • RequiredApplication for Building and Zoning ComplianceCity of Bloomfield Planning and Zoning form capturing project description, site plan, zoning district, lot size/setback conformance, flood zone status, and utility availability (water, sewer, electric, natural gas).

Fee schedule

Fee typeAmountNotes
Building Permit FeeProject valuation × 0.005
San Juan County Building Department page (sjcounty.net/government/community-development/building-department), 'Plan Review' section: 'Building Permit Fee: valuation of project x .005.' Project… Show full citation

San Juan County Building Department page (sjcounty.net/government/community-development/building-department), 'Plan Review' section: 'Building Permit Fee: valuation of project x .005.' Project valuations are determined using the latest ICC Building Valuation Data for new construction/additions, or contract price for alterations/repairs.

Building Plan Review FeeProject valuation × 0.0012San Juan County Building Department page, applies to buildings/structures requiring an Architect or Engineer seal under NMAC 14.5.2.9/14.5.2.10 and the Architectural Act (61-15-9 NMSA 1978); charged in addition to the Building Permit Fee.
Building and Zoning Compliance Application (City of Bloomfield)$25.00City of Bloomfield Planning & Zoning Fees 2022 schedule (bloomfieldnm.gov/media/466), 'Building and Zoning Compliance Application' line item.

Commercial Building Permit (New Construction / Addition / Alteration)

Verified

Required for new commercial construction, additions, and alterations within Bloomfield. Issued and inspected by the San Juan County Building Division under the County's cross-jurisdictional building program covering the City of Bloomfield, with City of Bloomfield Planning and Zoning approval also required.

Verified 2026-07-18 · Source

Requirements

  • New commercial construction, addition to a commercial structure, or alteration to a commercial structure within Bloomfield city limits — per San Juan County Building Division's Commercial Buildings Permit Application (revised 07/31/2023)
  • Must be performed by a licensed contractor per NMAC 14.6.6 Construction Industries Division Rules
  • Planning/Zoning approval from the City of Bloomfield Planning and Zoning Department is required (checklist item 10)
  • Must comply with the 2021 New Mexico Commercial & Residential Building Code, 2021 IBC, and 2021 New Mexico Commercial Energy Conservation Code (NMAC 14.7.6.13)
  • Plans must be stamped and signed by a registered design professional; footing/foundation design by a New Mexico Certified Engineer is required
  • Projects over $600,000 in valuation, or with total occupant load greater than 50, require seals from multiple design professionals
  • Floodplain approval required if applicable

Required documents

  • RequiredCommercial Buildings Permit ApplicationSan Juan County Building Division form (revised 07/31/2023) requiring one hard set or PDF of drawings (minimum 18"x24"), each page stamped/signed, code study, site plan, structural/architectural/electrical/plumbing/mechanical plans, and accessibility details.
  • RequiredApplication for Building and Zoning ComplianceCity of Bloomfield Planning and Zoning form; commercial structures require Fire Department approval in addition to standard zoning review, per the form's own instructions.

Fee schedule

Fee typeAmountNotes
Building Permit FeeProject valuation × 0.005San Juan County Building Department page, 'Plan Review' section.
Building Plan Review FeeProject valuation × 0.0012San Juan County Building Department page; applies when an Architect or Engineer seal is required under NMAC 14.5.2.9/14.5.2.10.
Building and Zoning Compliance Application (City of Bloomfield)$25.00City of Bloomfield Planning & Zoning Fees 2022 schedule.

Electrical Permit

Verified

Required for electrical installations, service changes, and related work on residential, commercial, and mobile-home structures within Bloomfield. Issued and inspected by the San Juan County Building Division under the 2020 New Mexico Electrical Code (based on the 2020 NEC).

Verified 2026-07-18 · Source

Requirements

  • Permit required for permanent service, temporary service, mobile home service, feeder/branch circuits, solar PV systems, swimming pool/wind generator equipment, and communication systems — per San Juan County's Electrical Permit Application (revised 04/11/2023)
  • Must comply with the 2020 New Mexico Electrical Code (2020 NEC as amended)
  • New Mexico's homeowner permit exemption (14.5.2 NMAC) allows a homeowner to pull an electrical permit for their own primary residence, provided the homeowner performs the major portion of the work
  • Only a New Mexico-licensed electrical contractor (or exempt homeowner) may perform and permit the work

Required documents

  • RequiredElectrical Permit ApplicationSan Juan County Building Division form (revised 04/11/2023) with a fee table by service type/amperage.

Fee schedule

Fee typeAmountNotes
Service under 100 amps (minimum)$60.00San Juan County Electrical Permit Application, revised 04/11/2023.
Service 100–200 amps$85.00San Juan County Electrical Permit Application, revised 04/11/2023.
Service 201–400 amps$275.00San Juan County Electrical Permit Application, revised 04/11/2023.
Service 401–600 amps$375.00San Juan County Electrical Permit Application, revised 04/11/2023.
Service 601–800 amps$475.00San Juan County Electrical Permit Application, revised 04/11/2023.
Service 801–1000 amps$575.00San Juan County Electrical Permit Application, revised 04/11/2023.
Service 1001–2000 amps$800.00San Juan County Electrical Permit Application, revised 04/11/2023.
Service over 2000 amps$1,275.00San Juan County Electrical Permit Application, revised 04/11/2023.
Feeder and Branch Circuits — Residential$0.03 per heated sq ftSan Juan County Electrical Permit Application, revised 04/11/2023.
Feeder and Branch Circuits — Commercial$0.06 per heated sq ftSan Juan County Electrical Permit Application, revised 04/11/2023.
Solar PV System$25/kW or fraction thereof for the first 160kW, then $5/kW thereafterSan Juan County Electrical Permit Application, revised 04/11/2023.
Swimming Pool / Wind Generator$35.00 eachSan Juan County Electrical Permit Application, revised 04/11/2023.
MH/RV Park or Multi-Bank Meters$60 first meter + $10 each additionalSan Juan County Electrical Permit Application, revised 04/11/2023.
Temporary Power Pole$25.00 eachSan Juan County Electrical Permit Application, revised 04/11/2023.
Administrative Fee$40.00San Juan County Electrical Permit Application, revised 04/11/2023.
Reinspection Fee$75.00San Juan County Electrical Permit Application, revised 04/11/2023.

EV Charger / EVSE Installation Permit

Verified

Bloomfield has no separate EV charger/EVSE permit category. A new circuit for a home EV charger is issued and inspected by the San Juan County Building Division as a standard Electrical Permit under the 2020 New Mexico Electrical Code, but the County's published Electrical Permit fee table does not contain a clean per-circuit retrofit line item — the closest categories (Feeder and Branch Circuits, billed per heated square foot; Service-amperage tiers) are structured for new construction or service changes, not a single added EV charging circuit, so the exact fee for a retrofit install is not cleanly derivable from the published table.

Verified 2026-07-20 · Source

Requirements

  • Electrical permit required for a new dedicated circuit or hardwired connection for an EV charging station, per San Juan County's Electrical Permit Application (revised 04/11/2023), which lists 'feeder/branch circuits' among the covered work types
  • Must comply with the 2020 New Mexico Electrical Code (2020 NEC as amended)
  • New Mexico's homeowner permit exemption (14.5.2 NMAC) allows a homeowner to pull the electrical permit for their own primary residence if they perform the major portion of the work
  • If the installation requires a new/upgraded electrical service, the Service-amperage fee tiers apply instead of (or in addition to) the branch-circuit fee

Required documents

  • RequiredElectrical Permit ApplicationSan Juan County Building Division form (revised 04/11/2023); no separate EV-specific application form is published

Fee schedule

Fee typeAmountNotes
Feeder and Branch Circuits — Residential (closest published category for a new circuit; formula is per heated sq ft, structured for new-construction wiring rather than a single retrofit circuit)$0.03 per heated sq ft
San Juan County Electrical Permit Application, revised 04/11/2023 — no distinct EV charger/EVSE line item or flat per-circuit retrofit fee is published; Show full citation

San Juan County Electrical Permit Application, revised 04/11/2023 — no distinct EV charger/EVSE line item or flat per-circuit retrofit fee is published; this session could not cleanly determine how the County prices a single added EV-charger branch circuit that is not tied to new heated square footage

Administrative Fee$40.00San Juan County Electrical Permit Application, revised 04/11/2023 — applies to electrical permits generally
Service under 100 amps (minimum) — if a new/upgraded service is also required$60.00San Juan County Electrical Permit Application, revised 04/11/2023

Plumbing Permit

Verified

Required for plumbing installations, gas piping, and water/sewer service work within Bloomfield. Issued and inspected by the San Juan County Building Division under the 2021 New Mexico Plumbing Code (2021 Uniform Plumbing Code as amended).

Verified 2026-07-18 · Source

Requirements

  • Permit required for DWV and water distribution, backflow devices, water service lines, sewer/building drain, gas piping systems, and water heaters — per San Juan County's Plumbing Permit Application (revised 04/11/2023)
  • Must comply with the 2021 New Mexico Plumbing Code (2021 Uniform Plumbing Code as amended)
  • New Mexico's homeowner permit exemption (14.5.2 NMAC) allows a homeowner to pull a plumbing permit for their own primary residence, provided the homeowner performs the major portion of the work

Required documents

  • RequiredPlumbing Permit ApplicationSan Juan County Building Division form (revised 04/11/2023) with a fee table by fixture/line type.

Fee schedule

Fee typeAmountNotes
DWV and Water Distribution — Residential$0.03 per heated sq ftSan Juan County Plumbing Permit Application, revised 04/11/2023.
DWV and Water Distribution — Commercial$0.06 per heated sq ftSan Juan County Plumbing Permit Application, revised 04/11/2023.
Backflow Device$5/ea (up to 1 inch); $10/ea (1–3 inch); $15/ea (3 inch and up)San Juan County Plumbing Permit Application, revised 04/11/2023.
Water Service Line$10/ea (up to 1 inch); $15/ea (1 1/4 inch and up)San Juan County Plumbing Permit Application, revised 04/11/2023.
Sewer or Modular Building Drain$10.00 eachSan Juan County Plumbing Permit Application, revised 04/11/2023.
Gas Piping System (new or replacement), with yard line$40.00 eachSan Juan County Plumbing Permit Application, revised 04/11/2023.
Gas Piping System (new or replacement), no yard line$30.00 eachSan Juan County Plumbing Permit Application, revised 04/11/2023.
Water Heater$10.00 eachSan Juan County Plumbing Permit Application, revised 04/11/2023.
Medical Gas System$0.05 per heated sq ftSan Juan County Plumbing Permit Application, revised 04/11/2023.
Administrative Fee$40.00San Juan County Plumbing Permit Application, revised 04/11/2023.
Reinspection Fee$75.00San Juan County Plumbing Permit Application, revised 04/11/2023.

Mechanical / HVAC Permit

Verified

Required for heating, cooling, and gas-fired mechanical equipment installations within Bloomfield. Issued and inspected by the San Juan County Building Division under the 2021 Uniform Mechanical Code (as amended by the 2021 New Mexico Mechanical Code).

Verified 2026-07-18 · Source

Requirements

  • Permit required for heating/cooling distribution, gas piping systems, radiant in-floor heat, solar water heating systems, and heating/cooling/combo units — per San Juan County's Mechanical Permit Application (revised 04/11/2023)
  • Must comply with the 2021 Uniform Mechanical Code (2021 New Mexico Mechanical Code as amended)
  • New Mexico's homeowner permit exemption (14.5.2 NMAC) allows a homeowner to pull a mechanical permit for their own primary residence, provided the homeowner performs the major portion of the work

Required documents

  • RequiredMechanical Permit ApplicationSan Juan County Building Division form (revised 04/11/2023) with a fee table by equipment/system type.

Fee schedule

Fee typeAmountNotes
Heating and Cooling Distribution — Residential$0.03 per heated sq ftSan Juan County Mechanical Permit Application, revised 04/11/2023.
Heating and Cooling Distribution — Commercial$0.06 per heated sq ftSan Juan County Mechanical Permit Application, revised 04/11/2023.
Gas Piping System (new or replacement), with yard line$40.00 eachSan Juan County Mechanical Permit Application, revised 04/11/2023.
Gas Piping System (new or replacement), no yard line$30.00 eachSan Juan County Mechanical Permit Application, revised 04/11/2023.
Solar Water Heating System$10.00 eachSan Juan County Mechanical Permit Application, revised 04/11/2023.
Heating Unit(s)$25.00 each (includes related equipment/components)San Juan County Mechanical Permit Application, revised 04/11/2023.
Cooling Unit(s)$10.00 first unit, $5.00 each additionalSan Juan County Mechanical Permit Application, revised 04/11/2023.
Combo Unit(s)$20.00 first unit, $10.00 each additionalSan Juan County Mechanical Permit Application, revised 04/11/2023.
Type I Hood$20.00 eachSan Juan County Mechanical Permit Application, revised 04/11/2023.
Administrative Fee$40.00San Juan County Mechanical Permit Application, revised 04/11/2023.
Reinspection Fee$75.00San Juan County Mechanical Permit Application, revised 04/11/2023.

Mobile Home Movers / Set Permit

Verified

Required for moving a mobile home into, out of, or within Bloomfield, and for setting a mobile home on a lot. Issued by the City of Bloomfield Planning and Zoning Department; the permit is valid for 30 days and must be in the mover's possession while the home is in transit and during set-up.

Verified 2026-07-18 · Source

Requirements

  • Required for any mobile home move into, out of, or within Bloomfield, or for setting a mobile home on a property
  • Mobile Home Mover or business license number must be provided on the application
  • All applicable zoning regulations must be complied with within the 30-day permit validity window
  • Property owner and mobile home owner information, make/serial number/size of the home, and origin/destination addresses and legal description must be provided

Required documents

  • RequiredMobile Home Movers / Set ApplicationCity of Bloomfield Planning and Zoning form capturing mover/business license number, mobile home owner and property owner details, move date, make/serial number/size, origin and destination, legal description, zoning, and flood plain zone.

Fee schedule

Fee typeAmountNotes
Mobile Home Movers/Set Permit Application$50.00City of Bloomfield Planning & Zoning Fees 2022 schedule (bloomfieldnm.gov/media/466).

Sign Permit

Verified

Required for sign installation within Bloomfield. Two applications are required together: the City of Bloomfield Planning and Zoning Department's own zoning-based Application for Sign ($3.00/sq ft), and San Juan County Building Division's Sign Permit Application, which its form explicitly requires be accompanied by a City of Bloomfield (or Aztec/Kirtland) application and which is fee'd on the County's project-valuation formula rather than a flat sign fee.

Verified 2026-07-20 · Source

Requirements

  • Permit required for sign installation within Bloomfield city limits, per the City's Applications and Permits list
  • City fee is calculated per square foot of sign area
  • San Juan County's own Sign Permit Application form states in bold: 'CITY OF AZTEC, CITY OF BLOOMFIELD OR TOWN OF KIRTLAND APPLICATION MUST ACCOMPANY THIS FORM' — confirming the City zoning application and County structural/building application are a joint, dual submission for a Bloomfield sign, not alternative/either-or options
  • County form captures sign type (pole, wall, ground/monument, roof, projecting, canopy, marquee, or combination), height, combustible/noncombustible construction, area, and a 'PROJECT VALUATION $___' field used to calculate the County-side fee

Required documents

  • RequiredApplication for SignCity of Bloomfield Planning and Zoning form (listed under Forms & Permits, Planning and Zoning department).
  • RequiredSan Juan County Sign Permit ApplicationSan Juan County Building Division form (Sign Permit Application, 2023) — must be submitted together with the City of Bloomfield application per the form's own instructions; captures sign type/height/area/valuation for the County's structural review and fee calculation.

Fee schedule

Fee typeAmountNotes
Sign Permit Application (City of Bloomfield, zoning)$3.00 per square foot of sign areaCity of Bloomfield Planning & Zoning Fees 2022 schedule (bloomfieldnm.gov/media/466), 'Sign Permit Application' line item.
Sign Permit (San Juan County, structural/building) — Building Permit FeeProject valuation x 0.005
County's Sign Permit Application form has no printed flat fee, only a 'PROJECT VALUATION $___' field; Show full citation

County's Sign Permit Application form has no printed flat fee, only a 'PROJECT VALUATION $___' field; the County applies its standard Building Permit Fee formula (valuation x 0.005, per the County Building Department page's 'Plan Review' section) to that valuation, the same formula used for the County's residential/commercial building permits documented elsewhere in this file.

Sign Permit (San Juan County) — Building Plan Review FeeProject valuation x 0.0012Applies when an Architect or Engineer seal is required under NMAC 14.5.2.9/14.5.2.10, per the County Building Department page; charged in addition to the County's Building Permit Fee for larger/structurally-sealed signs.

Street Excavation Permit

Verified

Required for excavation work within a Bloomfield street right-of-way, such as utility tie-ins or driveway cuts, administered by the City's Planning and Zoning Department with a bond or cash-deposit requirement that varies by road surface type.

Verified 2026-07-18 · Source

Requirements

  • Permit required for excavation within a City street right-of-way
  • A bond or cash deposit is required, at a different amount for paved versus unpaved roads
  • A non-refundable inspection/administrative fee applies regardless of bond type

Required documents

  • RequiredApplication for Street ExcavationCity of Bloomfield Planning and Zoning form (listed under Forms & Permits, Planning and Zoning department).

Fee schedule

Fee typeAmountNotes
Non-Refundable Inspection/Admin Fee$25.00City of Bloomfield Planning & Zoning Fees 2022 schedule (bloomfieldnm.gov/media/466), 'Street Excavation Permit' line item.
Paved Road Bond or Cash Deposit$5,000.00 bond OR $1,500.00 cash depositCity of Bloomfield Planning & Zoning Fees 2022 schedule.
Unpaved Road Bond or Cash Deposit$2,000.00 bond OR $175.00 cash depositCity of Bloomfield Planning & Zoning Fees 2022 schedule.

Solar PV Permit

Verified

Required for installation of rooftop or ground-mounted solar photovoltaic systems in Bloomfield. The City has no local building-inspection staff and contracts with the San Juan County Building Division for plan review and inspections; San Juan County's Electrical Permit Application explicitly lists 'Solar PV System' as its own fee category (per-kW rate), while the structural/racking portion is billed under the County's standard valuation-based Building Permit Fee, plus the City's own $25 Building and Zoning Compliance Application fee.

Verified 2026-07-20 · Source

Requirements

  • Electrical Permit required for the PV system itself — San Juan County's Electrical Permit Application (revised 04/11/2023) explicitly lists 'Solar PV Systems' among the work types requiring a permit, billed at a dedicated per-kW rate
  • Building Permit required for the structural/racking portion, billed at project valuation × 0.005 (San Juan County Building Department)
  • Building Plan Review Fee (valuation × 0.0012) applies if the installation requires an Architect or Engineer seal under NMAC 14.5.2.9/14.5.2.10
  • City of Bloomfield Building and Zoning Compliance Application ($25.00) required as the City's own administrative step, per the 2022 Planning & Zoning Fees schedule
  • Must comply with the 2020 New Mexico Electrical Code (2020 NEC as amended); New Mexico's homeowner permit exemption (14.5.2 NMAC) applies to the owner's own primary residence

Required documents

  • RequiredElectrical Permit ApplicationSan Juan County Building Division form (revised 04/11/2023), listing Solar PV System as a distinct fee category
  • RequiredNew Residential Permit Application ChecklistSan Juan County Building Division checklist for the structural/building portion
  • RequiredApplication for Building and Zoning ComplianceCity of Bloomfield's own administrative application, separate from the County's building/electrical permits

Fee schedule

Fee typeAmountNotes
Solar PV System (Electrical Permit)$25/kW or fraction thereof for the first 160kW, then $5/kW thereafterSan Juan County Electrical Permit Application, revised 04/11/2023 — a dedicated solar-specific line item, not the general amperage-based table
Building Permit Fee (structural/racking portion)Project valuation × 0.005San Juan County Building Department page, 'Plan Review' section
Building Plan Review Fee (if Architect/Engineer seal required)Project valuation × 0.0012San Juan County Building Department page; applies under NMAC 14.5.2.9/14.5.2.10 and the Architectural Act (61-15-9 NMSA 1978)
Building and Zoning Compliance Application (City of Bloomfield)$25.00City of Bloomfield Planning & Zoning Fees 2022 schedule
Electrical Administrative Fee$40.00San Juan County Electrical Permit Application, revised 04/11/2023

Sources & verification

Key facts verified against official sources. Last reviewed 2026-07-18.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Bloomfield building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-07-18)Later version (2026-07-22) →View current record →All versions →

Permalink: /new-mexico/san-juan-county/bloomfield/as-of/2026-07-20/

Snapshot date: 2026-07-20

Commit: 1c38476

Reproducible from PermitBase’s version-controlled dataset, commit 1c38476.