Village of Corrales building permits

Verified

Village of Corrales, New Mexico — as published 2026-07-05.

Verified 2026-07-05 · Source

Codes adopted

GOVERNANCE MODEL (verified directly from the Village's own current Building Permit Guide, part of the 'Application for Construction Permit,' revised June 2026): the Village of Corrales SELF-ADMINISTERS building/structural permitting through its own Building Official (Brian Gresham) under the Planning and Zoning Department — it is not a direct New Mexico Construction Industries Division (CID) field-office jurisdiction for the building/structural permit itself. HOWEVER, for the electrical, plumbing, and mechanical/HVAC trades, Corrales routes permitting and inspection to the CITY OF RIO RANCHO'S Building Department under an interlocal service arrangement — NOT to the state CID directly. Verified verbatim, twice, from two current official Village of Corrales sources: (1) the Village's 'Building Permits & Inspections' page states 'The City of Rio Rancho performs mechanical, electrical, and plumbing inspections for the Village of Corrales. The permits and inspections for these disciplines should be coordinated with the prospective subcontractor.' (2) The Village's own Building Permit Guide (Application for Construction Permit, revised June 2026, page 5 of 6) states under 'Required Inspections': 'Plumbing, Electrical, Mechanical Inspections: Permits must be obtained in the City of Rio Rancho Building Department unless directed otherwise by the Building Official.' This is a distinct third governance pattern in this corpus — neither full self-administration of all trades (Rio Rancho itself) nor direct state-CID enforcement of the deferred trades (Los Alamos County) — Corrales instead defers those trades to a NEIGHBORING MUNICIPALITY'S building department. Sources: corrales-nm.org/342/Building-Permits-Inspections; Village of Corrales Application for Construction Permit (Building Permit Guide, rev. June 2026).The Village of Corrales' own Building Permit Guide states the Building Official enforces the codes 'The Village of Corrales & Construction Industries Division (CID) currently enforces the following codes' (verbatim heading), listing: 2021 New Mexico Commercial & Residential Building Code, 2021 International Building Code, 2021 International Residential Code, 2012 Solar Energy Code, New Mexico Energy Conservation Code, 2021 New Mexico Plumbing and Mechanical Code, 2021 Uniform Mechanical Code (IAPMO), 2021 Uniform Plumbing Code (IAPMO), 2012 Uniform Swimming Pool, Spa, Hot Tub Code, 2021 New Mexico Electrical Code, 2020 National Electrical Code, 2012 NMESC / National Electrical Safety Code, ICC/ANSI A117.1-1998, Liquefied Petroleum Gas Standards, NFPA 58-1998 (LP Gas), NFPA 57, NFPA 54 (National Fuel Gas Code), NFPA 52, NFPA 501-C, Manufactured Housing Requirements, and Modular Structures. Source: Village of Corrales Application for Construction Permit, Building Permit Guide, page 6 of 6 (rev. June 2026).Building permit administration is enforced under the Village's adopted Building Code, Ordinance No. 08-012, per the Village's own Building Permits & Inspections page: 'The Building Official/Inspector enforces the provisions of the adopted Building Code (Ord 08-012).' Source: corrales-nm.org/342/Building-Permits-Inspections.Village of Corrales Code of Ordinances, Chapter 18, Land Use (Article II, Zoning) governs zoning compliance required before building permit issuance, including lot coverage, setbacks, and accessory-structure/dwelling-unit definitions. Source: Village of Corrales Application for Construction Permit; Village Code Sections 18-28, 18-29, 18-37, 18-203 (Ordinance No. 21-04, adopted June 15, 2021).

Permit types & fees

Construction Permit (New Residential Construction)

Verified

Required for new single-family home construction in the Village of Corrales. The Village's own Building Official (Brian Gresham), housed in the Planning and Zoning Department, self-administers building/structural plan review and permit issuance — Corrales does not route the structural building permit itself through the state Construction Industries Division or through Rio Rancho. All plans must be submitted electronically as PDFs via email to the Building Official.

Verified 2026-07-05 · Source

Requirements

  • Any owner or authorized agent who intends to construct, enlarge, alter, repair, move, demolish, or change the occupancy of a building or structure shall first apply to the Building Official and obtain the required permit
  • Complete Village of Corrales Application for Construction Permit, submitted with all drawings electronically via email to the Building Official (PDF format only); in-office applications accepted but plans must still be submitted electronically
  • Lot coverage (new construction plus all existing structures and paved surfaces) may not exceed 35% of the lot
  • Setbacks: 25 feet front, 10 feet sides and rear (Village Code Sec. 18-37(g); intensive agriculture requires 25 feet on all sides)
  • Maximum height: 26 feet to the ridgeline or top of parapet for any building, antenna, or structure
  • Site Plan required showing existing/proposed structures, property lines with dimensions, all utility connections (water, sewer, electrical), and general drainage/grading information, including on-site stormwater retention (pond size = total impervious area x 2.99 / 12 = cubic feet required)
  • If the building site is west of the Corrales Main Canal, a Grading and Drainage Plan prepared and sealed by a New Mexico-licensed professional engineer or architect is required per Village Code Sec. 18-160 through 18-172
  • Liquid Waste Disposal (septic) Permit from the New Mexico Environment Department office in Rio Rancho (4359 Jager Dr. NE, Suite B, Rio Rancho, NM 87144, (505) 771-5980) required prior to or with submittal; no septic tank or field may be placed within 100 feet of any existing well
  • Elevation Certificate from a licensed surveyor required if the property is in a flood zone
  • Full construction document set required: foundation plan, floor plan, electrical plan, truss details (engineer-approved), floor/roof framing plans, wall section details, and (if applicable) masonry fireplace details
  • Electrical, plumbing, and mechanical/HVAC permits and inspections for the new dwelling must be obtained separately through the City of Rio Rancho Building Department, not from the Village of Corrales, unless the Building Official directs otherwise
  • A Village of Corrales Business Registration number is required for the contractor on the application

Required documents

  • RequiredApplication for Construction PermitVillage of Corrales Planning and Zoning Department form (revised June 2026); covers Commercial, Residential, HOB (home occupation business), Fence/Wall, Remodel, Addition, Re-Roof, Pool, Solar, and Garage project types on a single form
  • RequiredSite PlanScaled drawing showing proposed and existing structures, lot coverage percentage, adjacent structures within 10 feet of property lines, north arrow, setbacks, utility connections, and drainage/grading/retention-pond information
  • RequiredLiquid Waste Disposal (Septic) PermitFrom the New Mexico Environment Department's Rio Rancho office; required unless connected to the limited Village wastewater service
  • OptionalElevation CertificateCompleted by a licensed surveyor; required only if the property is in a flood zone
  • OptionalGrading and Drainage PlanPrepared and sealed by a New Mexico-licensed professional engineer, architect, or surveyor; mandatory for sites west of the Corrales Main Canal per Village Code Sec. 18-160 to 18-172, and otherwise required if the Village Engineer determines it is needed
  • OptionalHomeowners Responsibility AffidavitRequired only if the property owner, rather than a licensed contractor, is acting as their own general contractor

Fee schedule

Fee typeAmountNotes
Building Permit Fee — $1.00 to $500.00 valuation$23.50Village of Corrales Building Permit Fees and Rates schedule (Proposed Building Permit Fee Schedule, effective per the Building Permit Fees Beginning FY 2010 document, still the current schedule per the Village's Building Permit Guide reference to 'the Village Building Permit Fee Schedule adopted April 2021, or the latest adopted fee schedule')
Building Permit Fee — $501.00 to $2,000.00$23.50 for the first $500.00 plus $3.05 for each additional $100.00, or fraction thereofVillage of Corrales Building Permit Fees and Rates schedule
Building Permit Fee — $2,001.00 to $25,000.00$69.25 for the first $2,000.00 plus $14.00 for each additional $1,000.00, or fraction thereofVillage of Corrales Building Permit Fees and Rates schedule
Building Permit Fee — $25,001.00 to $50,000.00$391.75 for the first $25,000.00 plus $10.10 for each additional $1,000.00, or fraction thereofVillage of Corrales Building Permit Fees and Rates schedule
Building Permit Fee — $50,001.00 to $100,000.00$643.75 for the first $50,000.00 plus $7.00 for each additional $1,000.00, or fraction thereofVillage of Corrales Building Permit Fees and Rates schedule
Building Permit Fee — $100,001.00 to $500,000.00$993.75 for the first $100,000.00 plus $5.60 for each additional $1,000.00, or fraction thereofVillage of Corrales Building Permit Fees and Rates schedule
Building Permit Fee — $500,001.00 to $1,000,000.00$3,233.75 for the first $500,000.00 plus $4.75 for each additional $1,000.00, or fraction thereofVillage of Corrales Building Permit Fees and Rates schedule
Building Permit Fee — $1,000,001.00 and up$5,608.75 for the first $1,000,000.00 plus $3.65 for each additional $1,000.00, or fraction thereofVillage of Corrales Building Permit Fees and Rates schedule
Residential Plan Review Fee50% of the Building Permit FeeVillage of Corrales Building Permit Fees and Rates schedule — lower than the 65% residential plan-review rate charged by neighboring Rio Rancho and Los Alamos County
Commercial Plan Review Fee75% of the Building Permit FeeVillage of Corrales Building Permit Fees and Rates schedule
Any permit/inspection for which no fee is specifically indicated$55.00/hour (2-hour minimum for a permit; 1/2-hour minimum for an unlisted inspection)Village of Corrales Building Permit Fees and Rates schedule, Special Permit Fees and Inspections table, items 1 and 4
Additional plan review for changes/revisions to approved plans$55.00/hour (1/2-hour minimum)Village of Corrales Building Permit Fees and Rates schedule, item 5
Inspections outside normal business hours / re-inspection fee$55.00/hour (2-hour minimum for after-hours)Village of Corrales Building Permit Fees and Rates schedule, items 2 and 3

Addition / Remodel / Alteration Permit

Verified

Required for additions, remodels, and alteration/repair work to existing single-family residences in Corrales. Uses the same Application for Construction Permit as new construction, with a scope of submittal reduced for non-structural alteration/repair work.

Verified 2026-07-05 · Source

Requirements

  • Building permit required for additions, remodels, and alteration/repair work regulated by the adopted Building Code
  • For additions: the floor plan must show the addition and all existing rooms, doors, and windows adjoining it, with distances to property lines and existing structures documented on all sides, and existing sleeping-room egress must not be blocked
  • For alteration/repair without structural changes: two sets of lists outlining the work to be performed and materials to be used may be accepted in lieu of full construction-document submittal
  • Any work suspected of involving asbestos-containing materials requires a call to the Air Quality Control Bureau (1-800-224-7009) before commencing
  • Same 35% lot coverage cap and 25 ft front / 10 ft side-rear setbacks apply to additions as to new construction
  • Electrical, plumbing, and mechanical/HVAC permits for the addition/remodel must be obtained separately through the City of Rio Rancho Building Department

Required documents

  • RequiredApplication for Construction PermitSame Village form used for new construction; select 'Remodel' or 'Addition' as the type of application
  • RequiredFloor Plan / Scope-of-Work ListsFull floor plan showing the addition's connection to the existing structure, OR (for non-structural alteration/repair) two lists of work to be performed and materials to be used

Fee schedule

Fee typeAmountNotes
Building Permit Fee (same valuation-based schedule as new construction)$23.50 minimum ($1-$500 valuation), scaling per the Building Permit Fees and Rates tableVillage of Corrales Building Permit Fees and Rates schedule
Residential Plan Review Fee50% of the Building Permit FeeVillage of Corrales Building Permit Fees and Rates schedule
Any permit for which no fee is specifically indicated$55.00/hour (2-hour minimum)Village of Corrales Building Permit Fees and Rates schedule, item 1

Re-Roof Permit

Verified

Required for re-roofing work in Corrales, using the Village's combined Application for Construction Permit (which includes a dedicated 'Re-Roof' project-type checkbox). Roof conversions (changing roof type/pitch) are separately valued for fee purposes.

Verified 2026-07-05 · Source

Requirements

  • A Construction Permit is required for re-roofing work; select 'Re-Roof' as the type of application on the Village's combined form
  • Roof conversions are valued at $9.50 per square foot for building-permit fee calculation purposes, per the Village's Specific Building Valuation Data table
  • Same submittal process applies: plans/documents emailed as a PDF to the Building Official

Required documents

  • RequiredApplication for Construction PermitVillage's combined form; select 'Re-Roof' as the type of application

Fee schedule

Fee typeAmountNotes
Building Permit Fee (valuation-based; roof conversions valued at $9.50/sq ft)$23.50 minimum ($1-$500 valuation), scaling per the Building Permit Fees and Rates tableVillage of Corrales Building Permit Fees and Rates schedule, Specific Building Valuation Data section
Residential Plan Review Fee50% of the Building Permit FeeVillage of Corrales Building Permit Fees and Rates schedule

Fence / Wall Permit

Verified

Required for fences and walls in Corrales, using the Village's combined Application for Construction Permit. Fences placed within the required setback area are charged a distinct, higher flat fee reflecting the additional plan review and inspection time the Village budgets for setback verification.

Verified 2026-07-05 · Source

Requirements

  • A Construction Permit is required for fence/wall installation; select 'Fence/Wall' as the type of application
  • Fences placed within the required setback area are charged a flat $165.00 fee, based on 3 hours of staff time at $55.00/hour (1 hour plan review, 1 hour first inspection to verify location/footing, 1 hour final inspection), per the Village's own fee-schedule rationale document
  • Adjacent to Village Code Sec. 18-37(g) setback figures (25 ft front, 10 ft side/rear) which govern where a fence is considered within the setback

Required documents

  • RequiredApplication for Construction PermitVillage's combined form; select 'Fence/Wall' as the type of application
  • RequiredSite Plan showing fence/wall location and dimensionsNeeded to determine whether the fence falls within the required setback area (triggering the $165.00 fee) or outside it

Fee schedule

Fee typeAmountNotes
Fences placed within the required setback area$165.00Village of Corrales Building Permit Fees and Rates schedule, Special Permit Fees and Inspections table, item 8 — explicitly rationalized in the Village's own fee-proposal document as 3 hours of staff time at $55/hour (plan review, footing/location inspection, final inspection), adopted 'due to many issues which have been raised by many residents, Councilors, and P&Z Commissioners'

Solar Permit (Ground-Mounted and Roof-Mounted)

Verified

Required for solar photovoltaic installations in Corrales. The Village's combined Application for Construction Permit distinguishes ground-mounted from roof-mounted systems, with a substantially higher flat fee for ground-mounted installations reflecting the additional structural/foundation and zoning review involved.

Verified 2026-07-05 · Source

Requirements

  • A Construction Permit is required for solar installations; select 'Solar' as the type of application, specifying ground-mounted or roof-mounted
  • Roof-mounted systems: $150.00 flat fee
  • Ground-mounted systems: $250.00 flat fee
  • Electrical connection/interconnection permitting and inspection for the solar system is handled separately through the City of Rio Rancho Building Department, consistent with Corrales' general MEP-trade referral

Required documents

  • RequiredApplication for Construction PermitVillage's combined form; select 'Solar' as the type of application and specify mounting type
  • RequiredPanel Layout / Mounting PlanShows panel locations, mounting/anchoring method, and (for ground-mounted systems) setback compliance

Fee schedule

Fee typeAmountNotes
Roof Mounted Solar$150.00Village of Corrales Building Permit Fees and Rates schedule, Special Permit Fees and Inspections table, item 10
Ground Mounted Solar$250.00Village of Corrales Building Permit Fees and Rates schedule, Special Permit Fees and Inspections table, item 9

Electric Vehicle Charging Station Permit

Verified

The Village of Corrales does not publish a dedicated EV charger/EVSE permit application, fee line, or webpage -- checked the Building Permits & Inspections page, the Application for Construction Permit/Building Permit Guide (rev. June 2026), and the Building Permit Fees and Rates schedule directly; none name electric vehicle charging stations, EV chargers, or EVSE. An EV charger installation is electrical work, and per the Village's own governance model documented throughout this file, electrical permitting and inspection for Corrales is NOT handled by the Village itself -- it is routed to the City of Rio Rancho Building Department under an interlocal service arrangement, the same referral already documented in this file's solar-pv-permit entry for solar's electrical interconnection portion. Re-chased 2026-07-20: located and directly fetched the City of Rio Rancho's own live Electrical Permit fee form, which publishes a real, currently-in-force fee table (no EV-specific line, but a catch-all 'items not listed' minimum plus a base permit fee and administration fee) that governs this exact referral pathway.

Verified 2026-07-20 · Source

Requirements

  • No EV-charger-specific permit application exists on either the Village of Corrales' or the City of Rio Rancho's website -- checked directly
  • Per the Village's own Building Permits & Inspections page: 'The City of Rio Rancho performs mechanical, electrical, and plumbing inspections for the Village of Corrales. The permits and inspections for these disciplines should be coordinated with the prospective subcontractor'
  • Per the Village's Application for Construction Permit (Building Permit Guide, rev. June 2026, page 5 of 6), under Required Inspections: 'Plumbing, Electrical, Mechanical Inspections: Permits must be obtained in the City of Rio Rancho Building Department unless directed otherwise by the Building Official'
  • If the EV charger installation is mounted on or attached to a structure requiring its own permit (e.g., a new carport canopy), a separate Village of Corrales Application for Construction Permit for that structural work would additionally apply
  • Licensed New Mexico electrical contractor required for the electrical work, consistent with state licensing law

Required documents

  • RequiredCity of Rio Rancho Electrical Permit ApplicationObtained directly from the City of Rio Rancho Building Division, not the Village of Corrales, for the charger's electrical circuit/installation work

Fee schedule

Fee typeAmountNotes
City of Rio Rancho Electrical Permit — Base Permit Fee$33.00Per the City of Rio Rancho's own live Electrical Permit form (rrnm.gov/DocumentCenter/View/76076/ELECTRICAL-PERMIT-2, rev. 5/2015, still the current form served on the City's site). No EV-charger/EVSE line item is named; the form's catch-all line ('Items not listed with a minimum $33.00 fee may require additional fees') and this base permit fee govern an EV charger circuit that doesn't match a named service/panel-size or appliance line.
City of Rio Rancho Electrical Permit — Administration Fee$23.00Charged 'on all permits' per the same Rio Rancho Electrical Permit form
City of Rio Rancho Electrical Permit — Service/Panel fee (if the EV charger requires a new or upsized residential electrical service)$60.00 (100 Amp) to $398.00 (Over 400 Amp), per the residential service-size table on the same formApplies only if the charger installation includes a new/upsized electrical service, not a simple added circuit on existing service capacity

Sign Permit

Verified

Required for any sign displayed for longer than 60 days in the Village of Corrales, per the Village's own Application for Sign Permit / Sign Permit Guide. Commercial and home occupation signs are charged a fee based on sign face area; short-term temporary signs in the agricultural/rural-residential and historical zones are exempt from the permit requirement. Applications are reviewed by the Building Inspector and/or the Planning & Zoning Administrator for conformance with the Village's sign ordinance (Village Code Chapter 8).

Verified 2026-07-22 · Source

Requirements

  • All signs displayed for longer than 60 days in the Village of Corrales require a sign permit (Sign Permit Guide, part (a))
  • The application must contain: signature of the applicant; name and address of the sign owner and sign erector; proof of a valid Village business license; proof of the property owner's permission; drawings showing the sign's location on the property/building facade/wall; drawings showing area dimensions, height, and basic design of the sign; drawings showing the location of all other existing/proposed signs on the property; and drawings showing that vision clearance at street corners and driveways follows Village Code Sec. 18-30(e)
  • No sign may be erected unless it conforms to the regulations for the zone in which it is located (Village Code Sec. 8-92(a))
  • Signs may not be located in the public right-of-way or on public property, may not be placed in the clear sign triangle at street intersections (per Sec. 18-30(e)), may not obstruct ingress/egress, and may not be attached to any utility pole
  • All signs must comply with the New Mexico Night Sky Protection Act (NMSA 1978 §§74-12-1 to 74-12-11) and Village Code Sec. 18-42 (Lighting): no unshielded lighting causing nuisance glare on adjoining property, and no oscillating or flashing signs
  • Internally lighted and digital signs are only permitted in the Commercial, Professional Office, or Municipal zones, with the illuminated portion not to exceed 16 square feet
  • In the Agricultural/Rural-Residential (A-1, A-2) and Historical (H) zones: temporary signs (including portable signs) may not exceed 4 sq ft per sign face, must be removed after 60 days for an additional 60-day rest period, and do NOT require a permit; permanent signs may not exceed 5 sq ft per sign face, are limited to two per premises, and DO require a permit; all freestanding signs are capped at 3 feet in height
  • In the Professional Office (O), Neighborhood Commercial (C), and Municipal/Public/Quasi-Public (M) zones: temporary signs (up to 4 sq ft) require a permit; permanent signs are capped at 64 sq ft of total sign area (including long-term portable signs/banners) and require a permit; multi-tenant buildings may consolidate into a single composite sign up to 64 sq ft total; off-premises signs require a permit; all freestanding signs are capped at 15 feet in height
  • Billboards are prohibited in all zones of the Village
  • No sign may be placed on Middle Rio Grande Conservancy District (MRGCD) or Southern Sandoval County Arroyo Flood Control Authority (SSCAFCA) land without those entities' express permission

Required documents

  • RequiredApplication for Sign PermitVillage of Corrales Planning and Zoning Department form (revised June 2022); collects project address, legal description, sign type/size/illumination, property owner and contractor/licensee information
  • RequiredSign Location and Design DrawingsDrawings showing the sign's location on the property/building facade/wall, area dimensions and height, basic design, location of all other signs on the property, and vision-clearance compliance at street corners/driveways per Sec. 18-30(e)
  • RequiredProof of Village Business LicenseThe permittee must show a valid Village business license before a sign permit is issued

Fee schedule

Fee typeAmountNotes
Sign Permit Fee (commercial and home occupation signs)$2.00 per square foot of sign areaVillage of Corrales Application for Sign Permit / Sign Permit Guide (revised June 2022), part (c); identically confirmed in the Village's own Schedule of Fees (Updated September 24, 2024): 'Sign Permit, application to Building Inspector and/or Planning & Zoning Administrator; fee determined by area of sign face. $2.00 per square foot.' Sign area includes all parts, words, and illustrations measured as one entity — separate measurement of detached letters/words/parts is not allowed.

Fire Sprinkler & Fire Alarm System Permit

The Village of Corrales does not publish a dedicated, standalone fire-sprinkler or fire-alarm system permit application, plan-review checklist, or system-specific fee on its own website -- checked the Building Permits & Inspections page, the Forms Directory, and the Village's own current Schedule of Fees directly. What IS published, and directly verified from the Village's own live Schedule of Fees (Updated September 24, 2024), is a locally administered 'Fire Department Fees' section covering Fire Inspections (tiered by structure square footage) and a Hazardous/Flammable Materials permit -- meaning fire-related inspection and permitting in Corrales is handled by the Village's OWN Corrales Volunteer Fire Department, NOT referred to the City of Rio Rancho the way electrical/plumbing/mechanical trades are (per this file's governance-model documentation), and not confirmed to be referred to the New Mexico State Fire Marshal's Office either. Village Code Chapter 16 ('Fire Protection and Prevention'), Article IV (Fire Code), Sec. 16-84 (Appendix) confirms the Village has its own adopted fire-code chapter, but the Municode hosting of the Corrales Code of Ordinances is a JavaScript single-page application that blocks direct fetch of rendered section text (the same limitation already documented elsewhere in this file for the Village's zoning code), so the specific sprinkler/alarm system-permit procedure within Chapter 16 could not be independently verified this session.

Reviewed 2026-07-22 · Source

Requirements

  • No dedicated fire-sprinkler or fire-alarm system permit application is published by the Village of Corrales -- checked the Building Permits & Inspections page, Forms Directory, and Schedule of Fees directly
  • The Village's own Schedule of Fees (Updated September 24, 2024) publishes a 'Fire Department Fees' section administered by the Corrales Volunteer Fire Department, including tiered Fire Inspections (by square footage) and a Hazardous/Flammable Materials permit -- this is the only published local fire-related fee structure, and it is administered by the Village itself, not by the City of Rio Rancho or a confirmed State Fire Marshal referral
  • Village Code Chapter 16 ('Fire Protection and Prevention'), Article IV (Fire Code), Sec. 16-84, references an adopted fire-code Appendix, confirming the Village has its own locally adopted fire code -- but full section text on sprinkler/alarm-specific plan review or permitting could not be retrieved this session because the Village's Municode hosting is a JavaScript SPA that blocks direct fetch of rendered content
  • A New Mexico 'Fire Marshal' generally has authority over permitting and inspection of fire protection systems within a political subdivision of the state (10.25 NMAC / NMSA 59A-52), but whether Corrales' own Fire Department, the New Mexico State Fire Marshal's Office, or another agency serves as the plan-reviewing Authority Having Jurisdiction for a fire-suppression/alarm system specifically was not confirmed on the Village's own site this session
  • If the fire-suppression or alarm system is part of a new-construction or addition/remodel project, the general Village of Corrales Application for Construction Permit would still separately apply for the structural/building scope of the project
  • Confirm current fire-sprinkler/fire-alarm system permitting procedure directly with the Corrales Volunteer Fire Department before beginning system design or installation, since it is not published online

Required documents

  • RequiredFire System Plans / Submittal (procedure not published)No dedicated fire-sprinkler or fire-alarm system plan-submittal application or checklist is published by the Village of Corrales or the Corrales Volunteer Fire Department; contact the Fire Department directly to determine current submittal requirements

Fee schedule

Fee typeAmountNotes
Fire Department Fees — Fire Inspections (locally administered, tiered by structure size)$10.00 (up to 500 sq ft) to $300.00 (10,000 sq ft and greater) for the initial inspection, with escalating re-inspection fees (e.g., 2nd reinspection $40.00-$330.00, 3rd $70.00-$360.00, 4th $100.00-$390.00, depending on tier)Village of Corrales Schedule of Fees (Updated September 24, 2024), 'Fire Department Fees' section. This is the Village's general, locally administered fire-inspection fee table -- it is NOT confirmed to be specific to fire-sprinkler or fire-alarm system installation/acceptance testing, but is the only published local fee structure covering Fire Department inspections. A late fee of twice the original inspection fee applies if payment is not received within 30 days of receipt of the temporary certificate of inspection.
Hazardous/Flammable Materials PermitVaries due to request, starting at $20.00Village of Corrales Schedule of Fees (Updated September 24, 2024), 'Other Fire Department services' line -- may apply to fire-suppression-adjacent work involving flammable/hazardous materials storage, but is a distinct product from a sprinkler/alarm system permit itself.

Change Of Use / Certificate Of Occupancy

Verified

A straightforward change in a structure's occupancy (with no additional parking or site alteration triggered) is handled by the Village's Building Official as part of the general Application for Construction Permit process -- the Village's own Building Permit Guide states any owner who intends to 'change the occupancy of a building or structure shall first apply to the Building Official and obtain the required permit.' A change of use that WOULD require additional parking and/or any alteration or addition to the site is instead routed through a Site Development Plan Permit reviewed by the Planning & Zoning Commission under Village Code Sec. 18-45(b), culminating in a Planning & Zoning-issued 'Certificate of Occupancy (Compliance)' distinct from the Building Official's construction-completion Certificate of Occupancy documented elsewhere in this file.

Verified 2026-07-22 · Source

Requirements

  • Any owner or authorized agent who intends to change the occupancy of a building or structure must first apply to the Building Official and obtain the required permit (Village of Corrales Application for Construction Permit / Building Permit Guide, rev. June 2026)
  • Per Village Code Sec. 18-45(b)(1): 'No building, structure, or land in any zone may be occupied by a use designated as requiring site development plan approval without the approval of a site development plan by the planning and zoning commission'
  • Per Sec. 18-45(b)(6): 'Any change in use which would require additional parking and/or any alteration or addition to the site of any structure upon the site shall require the resubmittal of an application and approval' -- i.e., a change of use triggering additional parking or site alteration requires a (re)submitted Site Development Plan Permit application, not just a Building Official sign-off
  • Site Development Plan applications require a pre-submittal meeting with the Planning & Zoning Administrator, a completed application with a narrative of existing and proposed uses (including hours/days of operation), and fourteen (14) sets of required drawings meeting minimum content standards (proposed/existing structures, lot coverage, property lines, utilities, parking, drainage, landscaping, adjacent structures within 25 feet, zone designations of adjacent properties, north arrow/scale)
  • The Planning & Zoning Administrator schedules a hearing before the P&Z Commission no later than sixty (60) calendar days following submittal of a completed application (Sec. 18-45(b)(2)-(3))
  • The Village's own Schedule of Fees (Updated September 24, 2024) separately lists a 'Certificate of Occupancy (Compliance); (Related to Site Development Plan)' fee and a 'Zoning Certification' fee, both administered by Planning & Zoning
  • Site Development Plan approval automatically expires 24 months after Commission approval (or conditional approval) if development is not complete, unless extended by the Commission (Sec. 18-45(b)(8))

Required documents

  • RequiredApplication for Site Development Plan PermitVillage of Corrales Planning and Zoning Department form (revised February 2019); required when a change of use triggers additional parking and/or site alteration per Sec. 18-45(b)(6). Requires a narrative of existing/proposed uses and hours of operation, plus fourteen (14) sets of required drawings
  • OptionalApplication for Construction PermitVillage's combined form used for a straightforward change of occupancy that does NOT trigger the Site Development Plan process; select the applicable project type

Fee schedule

Fee typeAmountNotes
Site Development Plan Permit Fee1.5% of the valuation of construction up to $5,000,000 plus 0.1% of the valuation in excess of $5,000,000, or a minimum fee of $500.00, whichever is greater, payable at time of application; plus the cost of legal notification (certified mail, signature required) for the Commission hearingVillage of Corrales Application for Site Development Plan Permit (rev. Feb. 2019), General Information item 4, citing Resolution 16-06; identically confirmed in the Village's own Schedule of Fees (Updated September 24, 2024)
Certificate of Occupancy (Compliance) — Related to Site Development Plan$47.00Village of Corrales Schedule of Fees (Updated September 24, 2024), Planning & Zoning section
Zoning Certification$50.00Village of Corrales Schedule of Fees (Updated September 24, 2024), Planning & Zoning section
Re-submittal of Site Development Plan due to incompleteness or errors requiring additional Village Engineer review$1,000.00, payable at time of re-submittalVillage of Corrales Schedule of Fees (Updated September 24, 2024), Planning & Zoning section

Sources & verification

Verified against official sources. Last reviewed 2026-07-05.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Village of Corrales building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

View current record →All versions →

Permalink: /new-mexico/sandoval-county/corrales/as-of/2026-07-05/

Snapshot date: 2026-07-05

Commit: f128c9c

Reproducible from PermitBase’s version-controlled dataset, commit f128c9c.