Version history — Town of Taos, New Mexico
This is PermitBase’s own verified record for Town of Taos, reconstructed from this dataset’s version-controlled history. Each version below reflects what our record stated as of that date — it is not a warranty of what Town of Taos’s actual law was at that time.
Permanent link to today’s record
Look up a specific date
Pick a date and we’ll show you the record as it stood then.
All versions
- 2026-08-01Current record
- Town of Taos, New Mexico — Commercial Building Permit (Zoning Review Application — Commercial, Industrial & Large-Scale Residential; includes Tenant Improvements/Alterations) record added
- 2026-07-22Superseded
- 2026-07-20Superseded
- Town of Taos, New Mexico — Residential/Commercial Solar Photovoltaic (PV) Permit fee record added: State CID Electrical Permit Fee (interconnection scope) — residential, by service/panel amperage (100 amp service or less: $25.00; over 100 amp through 200 amp: $40.00; over 200 amp through 320 amp: $55.00; over 320 amp through 400 amp: $125.00; over 400 amp: $200.00; plus a plan review fee of $40.00/hour or fraction thereof where plan review is required)
- Town of Taos, New Mexico — Residential/Commercial Solar Photovoltaic (PV) Permit fee record removed: State CID Electrical Permit Fee (interconnection scope)
- Town of Taos, New Mexico — Electric Vehicle (EV) Charger / Charging Station Permit record added
- Town of Taos, New Mexico — Residential/Commercial Solar Photovoltaic (PV) Permit record added
- 2026-07-05Initial record — coverage of Town of Taos began