Town of Taos building permits

Verified

Department contacts, adopted codes, permit types, fees, and gotchas for Town of Taos, New Mexico.

Last verified 2026-07-05 · Source · Embed this page’s badge · Version history

Building department

Address
400 Camino de la Placita, Taos, NM 87571
Phone
575-751-2016
Office hours
Monday, Wednesday, Thursday: walk-ins welcome (appointments prioritized); Tuesday, Friday: by appointment only; no same-day appointments (per Town of Taos Planning Division office-hours notice, effective June 9, 2025)

Inspection guide

See how inspections work in Town of Taos — sequence, scheduling & re-inspection fees.

Codes adopted

New Mexico sets construction codes statewide by rule, not through home-rule discretion. Under the Construction Industries Licensing Act (NMSA 1978 §§ 60-13-1 et seq.), the state's Construction Industries Commission and Division (CID, within the Regulation & Licensing Department) adopt the technical construction codes codified at New Mexico Administrative Code (NMAC) Title 14 — including the state's own Building, Residential, Existing Building, Mechanical, Fuel Gas, Plumbing, Solar Energy, and Swimming Pool codes, and the National Electrical Code (14.10.4 NMAC currently adopts the 2020 NEC; the CID Commission periodically updates individual code chapters, so confirm the current edition with the applicable authority). Per NMSA 1978 § 60-13-44(E), these state codes "constitute a minimum requirement" binding every political subdivision in New Mexico — no city or county may adopt anything less stringent, though a jurisdiction may adopt stricter local amendments. Enforcement authority runs through whichever entity is the project's Authority Having Jurisdiction (AHJ, defined at NMAC 14.5.1.7.B): under NMSA 1978 § 60-13-41(D)-(F), a municipality or county that employs its own full-time certified building official may self-administer permitting, plan review, and inspection locally (Albuquerque, Santa Fe, Las Cruces, Rio Rancho, Farmington, and Roswell all operate this way); jurisdictions without a certified building official default to direct enforcement by a CID field office (e.g., Hobbs, Alamogordo). Some jurisdictions run a hybrid — locally certified for some trades while CID directly enforces others (Roswell's electrical permitting, for example, reverted to direct CID administration as of January 1, 2026). Always confirm with the specific jurisdiction whether it or the state CID is the acting AHJ for a given trade before submitting plans.

  • New Mexico is a statewide-minimum-code state under the Construction Industries Licensing Act (NMSA 1978 §§ 60-13-44(E), 60-13-41(D)-(F)): a municipality with its own certified building official may become its own code-enforcement authority (self-administering) rather than routing permits through a state Construction Industries Division (CID) field office. The Town of Taos IS self-administering for Building: Town of Taos Code of Ordinances § 15.04.010 states 'The town shall have the exclusive power to issue and enforce building and construction permits within the town and over an area extending three (3) miles from the exterior boundaries of the town,' subject to exceptions for construction exempted by the Construction Industries Licensing Act.
  • New Mexico Uniform Building Code (the state-adopted minimum code, as amended from time to time by the NM Construction Industries Commission/Division) — enforced locally by the Town's own code administrator per § 15.04.010; per § 16.12.070.2(C)/§ 16.12.070.3(G), the Town's code administrator reviews submitted plans and specifications 'for compliance with all applicable fire and construction codes and for engineering design, within fifteen (15) business days of submittal of a complete application' for single-family dwellings, and the same review (timeline not separately stated) applies to commercial/industrial/large-scale-residential uses
  • Electrical and Mechanical (including Plumbing, which is combined with Mechanical under New Mexico's CID structure): the Town does NOT self-administer these trades. Town of Taos Code of Ordinances § 16.12.070.2(D) (single-family dwellings) and § 16.12.070.3(H) (commercial/industrial/large-scale-residential) both state: 'The applicant shall obtain all required state permits for mechanical and electrical services' — i.e., Electrical, Plumbing, and Mechanical/HVAC permits are CID-administered (state Construction Industries Division), not Town-administered, regardless of project type
  • 2021 New Mexico Commercial & Residential Building Code (2021 IBC/IRC basis), 2021 New Mexico Plumbing and Mechanical Code, 2020 New Mexico Electrical Code (2020 NEC, 14.10.4 NMAC) and other current NM Administrative Code Title 14 construction chapters, as adopted/amended by the state Construction Industries Commission/Division — these are the codes CID applies when it reviews and permits Electrical/Plumbing/Mechanical work in Taos, and are also the minimum standard the Town's own code administrator enforces for Building
  • Town of Taos Code of Ordinances, Title 15 (Buildings and Construction), Chapter 15.04 (Building Code) — establishes the Town's self-administration authority (§ 15.04.010) and the High Performance Building Program (§ 15.04.040 et seq., HERS-rating and LEED requirements phased in 2009-2012 and beyond for larger residential/commercial projects)
  • Town of Taos Code of Ordinances, Title 16 (Land Use Development), Chapter 16.12.070 (Building Permits, Certificates of Occupancy and Use) — governs submittal requirements, the 15-business-day Building plan-review timeline for dwellings, the state-permit requirement for mechanical/electrical, and the Construction Mitigation Checklist (§ 16.12.070.6, mandatory before any building permit is issued)

Permit types & fees

Tips & gotchas

  • The Town of Taos self-administers Building permitting (its own code administrator, its own 15-business-day plan-review SLA, its own 'Zoning Review Application for Building Permit' and BP-prefixed permit numbers) — it does NOT route Building through the state Construction Industries Division. This makes Taos one of the New Mexico municipalities on the self-administered side of the state's dual-track model (NMSA 1978 §§ 60-13-44(E), 60-13-41(D)-(F)).
  • Electrical, Plumbing, and Mechanical/HVAC are the OPPOSITE: Town of Taos Code of Ordinances §§ 16.12.070.2(D) and 16.12.070.3(H) both require 'the applicant shall obtain all required state permits for mechanical and electrical services' — meaning those three trades are routed to the state Construction Industries Division (CID), not the Town, for both single-family and commercial/large-scale-residential projects. This split-by-trade governance model is real and confirmed directly from the Town's own codified ordinance text, not assumed from a generic New Mexico default.
  • A homeowner-builder permit explicitly excludes electrical and plumbing ('a separate application is required for these trades') and prohibits self-performed mechanical/HVAC work altogether — per the acknowledgment page of the State of New Mexico Homeowner Building Permit Application that the Town requires alongside its own Zoning Review Application.
  • No building permit will be issued without an approved Construction Mitigation Checklist (Town of Taos Code of Ordinances § 16.12.070.6) — a genuine gating document covering parking, fencing, dumpsters, traffic control, and restricted construction-activity hours (residential: 8am-5pm Mon-Sat; commercial: 7am-6pm Mon-Sat, or 8am-5pm in residential zones).
  • The Town of Taos High Performance Building Program (§ 15.04.040.1) phases in mandatory HERS energy ratings (currently 70 or better as of Phase IV, 2012-onward, for residential of ANY size) and LEED 'certified' ratings for larger commercial projects, as a condition of BOTH the building permit and the certificate of occupancy — this is a genuinely unusual and stringent local requirement not found in most other New Mexico jurisdictions in this corpus.
  • A Site Threshold Assessment (STH) is required of all developing/redeveloping properties accessing a Town road EXCEPT single-family residential applications — don't assume single-family projects are exempt from every review; they are only exempt from this specific one.
  • The department name on current documents (2023-2025) is 'Planning, Community and Economic Development Department,' though an older 'Building Safety Division' letterhead/name appears on some pre-2023 Town documents still linked from the Town's own website — both refer to the same office at 400 Camino de la Placita.